Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
038-1015-95-000
®� r© Innovation !rough Cooperation 2/21/2020 Cheryl Schmidt 8165 Casper Way Inver Grove Heights, MN 55076 Community Development 1101 Carmichael Road Hudson WI 54016 Telephone: 715-386-4680 Fax: 715-386-4686 RE: Conditional Approval: File# LUP-2020-010 Project Location: 03.31.18.45, Town of Star Prairie Project Address:1140 Cty Rd H Cheryl, www.sccwi.gov Community Development staff have reviewed the Land Use Permit application for the installation of shoreline rip -rap in the Shoreland Overlay Zoning District pursuant to Chapter 17.30 I. The request has been conditionally approved based on the application submission and the following findings: • No buildings or structures are proposed to be constructed. • The proposed project will consist of placing 160 feet of rock rip -rap varying in size from 6-12 inches along the shoreline of Cedar Lake. • Cedar Lake is a navigable body of water. • The Department of Natural Resources approved the project. • No land disturbance, filling or grading to slopes greater than 19.99% was proposed. • Erosion and sediment control plans have been submitted that meet Wisconsin Department of Natural Resources Technical Standards. Best management practices and stormwater management will be incorporated. • The applicant proposes establishing native non-invasive vegetation seeded above the ordinary high water mark. Based on these findings, approval of the Land Use Permit is subject to the following conditions: 1. A copy of the DNR Permit for Rock Rip -Rap shall be submitted prior to the start of the project. 2. Prior to Construction, the erosion control measures, such as silt fencing, sediment logs, or berms must be installed prior to all land disturbance activity. 3. A post -construction inspection is required prior to removing the temporary sediment and erosion control measures to verify proper vegetation cover has been established. Please call me at (715) 386- 4742, to schedule this inspection. 4. St. Croix County reserves the right to require additional sediment and erosion control measures to be installed if found necessary due to site -specific concerns and will be documented in an as -built site plan. Ben Hetzel benjamin.hetzel@sccwi.gov (715) 386-4742 5. All temporary erosion control measures shall be left in place and maintained until the site has reached a point of at least 70% permanent vegetation. Permanent vegetation shall be established once final grade is reached or as soon as applicable per plan. 6. It is the applicant's responsibility to secure any other required local, state or federal permit(s) and approval(s) prior to land disturbance activity. 7. Failure to comply with the terms or conditions above may result in the revocation of this permit by the Zoning Administrator pursuant to Chapter 15.555 and Chapter 17.30 P. (13). This approval is subject to the conditions listed above: it does not allow for any additional construction, structures, or buildings beyond the limits of this request. Your information will remain on file at the St. Croix County Community Development Department suite. It is your responsibility to ensure compliance with any other local, state, or federal permitting or regulations, including contacting the Town of Somerset and the Department of Natural Resources to inquire if additional permissions are required. This permit is valid for one year, with the possibility of up to two (2) six- month extensions if the applicant submits the appropriate permit extension fee and documentation to the Zoning Administrator. A copy of the Land Use Permit placard should be submitted to the town's local Building Inspector upon applying for town building permit(s). The orange placard must be posted on the job -site and visible from public view. Please feel free to contact me with any questions or concerns; I am typically available Monday -Friday from 8:00 a.m. — 4:30 p.m. tfully Re,, Ben Hetzel Land Use Technician II cc: File ec: townstarprairie@frontiernet.net; Township chekelnikCcDyahoo.com; Property Owner mike@palumboservices.com; Contractor Ben Hetzel benjamin.hetzel@sccwi.gov (715) 386-4742 ST. C R O j ty LAND l %r'st'nnsr � 12 4PP SE PERMIT _ICAT10NP, .d File #: )_U.VP oaO ff1% use only Revised May 2016 501 Property Owner Contractor/Agee Property Owner: Mailing Address: idt 8165 Casper Way Inver Grove Heights^ 55076 Daytime Phone: (651 )451-7399 Cell: (651)494-7902 chekelnik@yahoo.com Contractor/Agent: Palumbo Services, Inc.; Mailing Address: 9331 W. Broadway Ave. 0 Forest Lake, MN Daytime Phone: ( 651) 964-8552 t Cell: ( 651) 964-8552 i E-mail: mike@palumboservices.com Site Address: 1140 County Rd H, New Richmond, WI 54017 Property Location: SE 1/4, NW 1/4, Sec. 3 IT. 31 N., R. 18 w., Town of Star Prairie Computer #: 03 _ 31 18 _ 45 Parcel #: 038 1015 95 000 Zoning District (Check one): 0 AG. 0 AG. II 0 RURAL RES. 0 RESIDENTIAL 0 COMMERCIAL O INDUSTRIAL Overlay District (Check all that apply): 0 SHORELAND O RIVERWAY O FLOODPLAIN 0 ADULT ENTERTAINMENT Type of Land Use Permit Request (Check one): Please refer to the current fee schedule on our website. 0 Lower St. Croix Riverway District 0 Wireless Communication Tower (Co -location) 0 Shoreland 0 Temporary Occupancy 0 Signage 0 Nonmetallic Mining Operation 0 Floodplain 0 Animal Waste Storage Facility O Grading & Filling, 12-24.9% Slopes 0 Livestock Facility 0 Other: Riprap 0 Permit processed in conjunction with a Land Division, Special Exception or Variance State the nature of your request: The installation of Riprap along the shore line pursuant to the guidelines put forth by the Wisc. DNR Zoning Ordinance Reference HKV517.36H.e. I attest that the information contained in this application is true and correct to the hest of my knowledge. Date I _ IS-aO�� Date 2-6 JO,�-CD Complete Application Accepted: �9J-zli W By: ' rn Fee Received: ��_0 $ SU C Re #k 715-386-4680 5t. Croix County Government Center cdd@co.saint-croix.wi.us 1101 Carmichael Road, Hudson,#,N154016 715-38IA400 Fax www.sccwi.us/cdd 6rA� 16-0 3y ST. C R NTY 'r.,c� ltsr,i FHB 12 2020 I, ADDENDUMF LAND USE�`PEF File#: Lkr a6a°' Office Use Only Revised May 2016 C '` Cheryl Schmidt Palumbo Services, Inc. Property Owner: Contractor/Agent: 9 3 SE NW 03 31 18 Star Prairie Property Location: 1/4, 1/4, Sec. T. N., R. W., Town of (7 a 03 31 18 45 038 1015 95 000 Cnmmiter #- - - - Parcel #: —$ 1) s LAND USE INFORMATION M=1, n . 4,.:.IF Type of Land Use Permit Request (Check one below): E3 Animal Waste Storage Facility E3 Wireless Communication Tower (Co -location) E3 Nonmetallic Mining Operation 13 Lower St. Croix Riverway District 0 Signage 0 Shoreland E3 Floodplain E3 Temporary Occupancy E3 Grading & Filling, 12-24.9% Slopes 0 Other: Riprap The installation of Riprap along the shore line pursuant to the guidelines put forth 2) State the nature of your request: by the Wisc. DNR 3) Original Request (Check one below): W Special Exception 0 Variance 4) Please state how this permit relates to your original request: To permit the use of Riprap in a floodplain area. Zoning Ordinance Reference —SUBCHAPTER IILV §17.36 HA E3 Land Division E3 Sanitary SIGNATURE I attest that the information contained in this addendum is true and correct to the best of my knowledge. Property Owner Contractor/Agee Date 1 - -L6- Date a - 6 a t24:;k 0