HomeMy WebLinkAboutResolutions 2005 (20) RESOLUTION FOR STUDY OF SALEABLE FILL
DIRT FROM COUNTY FARM FOR
HIGHWAY 64 PROJECT
RESOLUTION NO. Gk ODY)
ST. CROIX COUNTY, WISCONSIN
WHEREAS, there is interest in obtaining fill material from the County farm
property in New Richmond for construction of new State Trunk Highway 64; and
THEREFORE, be it resolved by the St. Croix County Board of Supervisors that
the Finance Committee is authorized to obtain an engineering study on the County's New
Richmond property that includes:
1. The location and amount of any deposit suitable for use in the construction
of State Trunk Highway 64.
2. A per- cubic -yard sale price.
3. Route of truck traffic and other conditions for excavating and hauling
materials.
4. Restoration standards for excavated area(s).
Offered by the Finance Committee.
NEGATIVE AFFIRMATIVE
Reviewed by Corporation Counsel: Date: O's
This Resolution was duly adopted on (,A ! , 2005.
Cindy Camp ell, County Clerk
Mashuda Contractors, Inc.
P.O. Box 16
Princeton Wi. 54968
Re: STH 64 New Richmond Bypass
Project # 1559 -08 -80,82
June 7, 2005
St. Croix County
Mashuda Contractors, Inc. will be bidding on the bypass project.
We need appox. 180,000 cy of fill material. We would like to test the soils on the county
Land between CTH K and CTH CC to see if the material is suitable for the project.
We would either drill or dig with a backhoe.
If the material is suitable for the project we would like to enter into a agreement with
The county to purchase material for the project.
All test sites will be cleaned up when we are done. Depending on what we find we will
probably drill or dig 6 t0 10 spots.
If crops are on these areas we will take all measures to disturb the minimum area.
If we enter into a agreement we will pay the county a per cubic yard royalty plus a per
acre crop loss.
When we are done with the project the land will be returned to farmable land and will be
seeded down at no cost to the County.
If you have any further questions or would like me to attend any meetings to explain
anything please contact me at 920 - 229 -9218
you
Paul Sbel
Mashuda Contractors, Inc.