Loading...
HomeMy WebLinkAbout040-1035-10-000 Wisconsin Department of Commerce PRIVATE SEWAGE SYSTEM County: St. Croix Safety aPrJ Building Division r INSPECTION REPORT Sanitary Permit No: 430071 0 GENERAL INFORMATION (ATTACH TO PERMIT) State Plan ID No: Personal information you provide may be used for secondary purposes [Privacy Law, s.15.04 (1)(m)]. Permit Holder's Name: City Village X Township Parcel Tax No: Fe ereisen, Tom I Troy Township 040 - 1035 -10 -000 CST BM Elev: Insp. BM Elev: BM Description: ' Section/Town /Range /Map No: ao.o' CV -0 I Csi 6w• 1 P0c 08.28.19. �I TANK INFORMATION ELEVATI N DATA TYPE MANUFACTURER CAPACITY STATION BS HI FS ELEV. Septic Benchmark � • s (0�0 10.5fl Uo•5 po Dosing Alt. BM Aeration Bldg. Sewer •.�O ��Z•o"1 Holding St/Ht Inlet p / / TANK SETBACK INFORMATIO yrt S bjA St/Ht Outlet G 1 -o �l•`�3 TANK TO P/L WELL B - Lb G. Vent to Air Intake ROAD Dt Inlet Septic ,� �• `L ` , I -+ t Dt Bottom Dosing �-� Hea a Man. 1 Aeration Dist. Pipe wq Holding Bot. System 12. Z, (> p. 8A Final Grade 1 • Q� lo;• :16 PUMP /SIPHON INFORMATION 6 -_ ease Manufactur r Demand St Cover �•� 3 • • �r GPM •Zo Model Number TDH Lift Frictio ss System Head TD Ft Force in Length Dia. SOIL ABSORPTION SYSTE Z( BED /TRENCH Width Length No. Of Trenches PIT DIMEN ONS No. Of its Inside Dia. Liquid Depth DIMENSIONS 3 SETBACK SYSTEM TO P/L BLDG WELL LAKE /STREAM LEACHING M of �t4Tr: INFORMATION Type Of System: CHAMBER T OR ( T Model Number: t1 DISTRIBUTIO TEM 'e tc - Head Mgpif � Distribution x Hole Size x Hole Spacing Vent to Air Intake y Pip s) Len Dia Leng Dia Spacing SOk COVER x Pressure Systems Only xx Mound Or At - Grade Systems Only Depth Over Depth Over xx Depth of xx Seeded /Sodded 1 xx Mulched Bed/Trench Center Bed/Trench Edges Topsoil L] Yes U No F No (Poca tion E NTS I c[Od�,co�gl' crep�ncies, persons present, etc.) Inspection #1: 3L ?'�3 Inspection #2: . // 449 Townsva lley Rd [[ Hudson,, WI 54016 (SW 1/4 SE 1/4 8 T28N R19W) NA Lot 1 Parcel No: 08.28.19. 1.) Alt BM Description = u k S T. y,NV� t+K►�•. 2.) Bldg sewer length = - amount of cover = 4Z { e3w COVAr Plan revision Required? Yes No �"' -�+ Use other side for additional information. _ ± -Q_ �_ ^^�. _ ___ __J SBD- 571 7) Date Cert. Insepctor's Signature Kok— MA *\ Safety and Buildings Division County 201 W. Washington Ave., P.O. Box 7162 ao (} *is eonsin Madison, WI 53707 - 7162 Sanitary Permit Number (to be filled in by Co.) Department of Commerce (608) 266 -3151 Sanitary Permit Applie io i _ State Plan LD. Number 1 In accord with Comm 83.2 1, Wis. Adm. Code, personal info - nation you provide may be used for secondary purposes Privacy Law, s .04(1)9 t �D 2003 ''' Project Addres (if c ifferent than mai'.ing address) I. Application Information - Please Print All Information C! l( Y G , ( � ��VMiLC� r -4) Owner's Na me ! -- - Parcel a Lot it Block fl (10t Gr^� Gil S �'� A a 0 0 7o d 4 _ perry Owner's M ailing Address 2 1)))1 Property Location 1V J `" 0 ' /a, Sa,Section City, State Zip Code Phone Number -- l'l W � (circle o tc) II. Type of Building (check all that apply) T Z3N: R� __E ort * 9 1 or 2 Family Dwelling - Number of Bedrooms Sibl;diuiu" Name CSM. Number ❑ Public /Commercial - Describe Use 7 7t -Q V l `7 R q ❑ State Owned - Describe Use 6� TQ ( (�tJ j (Q 9" l t ❑City — ❑Village owuship of III. Type of Permit: (Check only one box on line A. Comp lete line B if applicable) A. New System �--- - - - - -- y ❑ Replacement System ❑ Treatment/ Holding Tank Replacement Only ❑ Other Modification to E;;isting System B. ❑ Permit Renewal ❑ Permit Revision ❑ Change of ❑ Permit Transfer to New List Previous Permit Number and Date Issued Before Expiration Plumber Owner IV. Type of POWTS System: (Check all that apply) — Non - Pressurized In- Ground ❑ Mound > 24 in. of suitable soil ❑ Mound < 24 in. of suitable soil ❑ At -Grade j Single Pass Sand Filter ❑ Constructed Wetland ❑ Pressurized In- Ground ❑ Holding Tank ❑ Peat Filter ❑ Aerobic Treatment Unit ❑ Recirculating Sand Filter ❑ Recirculating Synthetic Media Filter Leaching Chamber ❑ Drip Line ❑ Gravel -less Pipe ❑ Other explain) V. Dispersal/Treatment Area Infor ation: 3 /, Design Fjow (gpd) Design Soil Application Rate(gpdsf) Dispersal Area Required (sf) I Dis e LVAre a Pro ed (sf) System Elevation® VI. Tank Info Capacity in Total Number Manufacturer Prefab Steel Fiber Plastic Gallons Gallons of Units Concrete Constructed Glass New Existing Tanks Tanis -- - -- - -- — S eptic or Holding Tank /„�) ._ - U Aerobic Treatment Unit ! 00 - - - -, Dosing Chamber W --- — VII Responsibility Statement I , the undersigned, assumeiresponsibility for installation of the POWTS shown on the a ttac he d pan s. Plu tier's Na me (Print) Plumb s Si gna re MP /MNumber Business Phone Number /AJ Plumber's Addre ss (Street, City, State, Zip C e) VIII ount /De artment Use Only` - - - - -- — Approved ❑ Disapproved Sanitary Permit Fee (includes Groundwater Date Issued Is mg Ag^ t Sig atur Stamps) g ) Surcharge Fee �` (A El Owner Given Reason for Denial �ZJ �� �/ (� 3 Co dd off Approval /Reasons for Diis�a�pprj val Co ���?d [fit- K.+�.- V�- / ���� / •I CJ Attach complete plans (to the County only) for the sys em on paper not lets than 81/2 x 11 inchef in size SBD -6398 (R. 01/03) a: __. . . mz itt iK J V \A D � a► LN . Af � f D BZ I t� 1 coip --77 1 l Z z46�� l000r k A tA 7 ,. C.tz.2u5 v M_ Y ' a / �, �. 0 a 0 ?� c ad co l�I Lr i � r W o � c Q LL O X ^ o z i � GL , h W t �o ull 1 Q 0 0 r Wisconsin Department of Commerce SOIL EVALUATION REPORT Page _ of 3 Division of Safety and Buildings In accordance with Comm IS US Arim c'`nQJn _ ntyY Attach complete site plan on paper not teas than d 112 x 11 inches I size. 11IE i =" 5T CR°VX f point 1 Include but not limited to: vertical and horizontal reference rence po ( B ). dlrectlon and Parcel I percent slope, scale or dimensions, north arrow, and location and d lance to nearesil road. JAN 1 4 ? 0 eview y Date I� _. _ Please print all Information. /„ Porsonat Information you provide may be used for secondary purposes (Priv cy L�w�q 1 ; g1 (� (m)), _ ( t� (G G Property Owner �vYF -f�` ="T01r _( ��yTm1�1 SES1rJ 114 X1/4 S$ T 28 N R 19 W Property Owner's Mailing Address Lot # Block # Subd. Name or CSM# �� f 4M TDWA J ,5NL Pe�vD/NG City State ADs Zip Code Phone Number 0 City ❑ Village Town Nearest Road K\w vJT Sy 01b 0 15) Sgt - 36g qo C\-6 TowmsUAtLF-Y �- New Construction User Residential / Number of bedrooms _ Code derived design flow rata _ —. y�_ _.. - -- - - -• GPO ❑ Replacement ❑ Public or commercial - DescAbe: Parent material _O ITIN"H _ _..___ -- Flood Plain elevation if appticabie _ —._. N��___ -• -- n ' General comments and recommendations: ::ty��puA}p Co fJv7,;& T101�1fxL- "t R>E,JJCt��S ' Ot7 LphDlNG �,RT Boring El F—/ Boring # Pit Ground surface also. j�,� H. Depth to limiting factor _� � — in. Soil Ilcaticn Bete Horizon Depth Dominant Color Redox Description Texture Structure Consistence Boundary Roots —1j PD/il' in. Munsell Qu. Sz. Cont. Color Gr. Sz. Sh. 'Eff#1 Eff#2 3 m 0 r l ! r Z 10 J Va� (r2— 3 45 K — s Os rn 1�� Ord I , Z 4 13- a v2/ ;t3 44- k0� : 57- l b 47- f YR 5 ' 7 to . S � y S S dl --- � D,7 Ir Z J Boring Boring # Q J Pi; Ground surface elev. _q 7! ft. Depth to limiting factor 7 � �� in. S dicaffon Kate Horizon Depth Dominant Color Redox Description Texture Structure Consistence Boundaryl Roots GPD /ff in. Munsell Qu. Sz. Cont. C olor Gr. Sz. Sh. i 'Efi#1 'Eff#2 10 I �msbK 3r -Kl 0.7 f - Z md �r . 5 2 � - 7 Z ;4 m\ ' Effluent #1 = BOO , > 30 < 720 rrg1L and TSS >30< 150 mg& Effluent M= BOD c 30 mgll. and TSS < 30 mg/L CST Name (Please Print) Ignalure CST Number A Q0 HO�t G"r&- �► ZZ g3? Address Date Evaluation Conducted Telephone Number t WIS b90 Aver IZI E 'FAu -s WT 5402z Or -o8 -o 5 _ IL I f , $� S' ��yF1C81�ErJ� - Tow k e A 1 A �A Parcel IDp NI L Page Property Owner F11�E15�_►a 2�`^ _ice --- (� U Boring # Boring G �b g 7 J �a In. Sill Ilcation Rate Ground surface elev. __ r�D�_ _ ft. Depth to Iimitln factor Texture Structure Consistence Boundary Roots G 0 Horizon Depth Dominant Color Redox Description •EIVI *E"2 - f In Munsell Du. 5z. Cont. Colcr { Or. Sz, Sh. 1 C7 -q Me z. / I — ' ( 3f -Ls6K M r c� 34- m 02 1,2- Z- 4- 5 ) o YK -~ 5 rn -l- vy , V C s - m 0, 7 1. Z d Boring # Boring ❑ pit Ground surface elev. R. Depth to Ikniting tailor ,.�_._ In. Soli Ikstion Rate Horizon Depth Domnt Color Redox Description Texture Stnrdure Consistence Boundary Roots GPI in. M Ou. Sz. Cont, Color Gr. Sz. Sh. 'E", Ef(g2 1 I� 1 Boring Boring tt Ground surlace elev. _ —� _,___ it. Depth to limiting factor ❑ Pit Solt pljcRuon Rate Horizan Depth Dominant Color Redox �De crlp tion Texture Structure Consistence Boundary Roots GPOlff in. Munsell Qu. Sz. nt. Color Gr. Sz. Sh. 'ENi11 'EtNt2 'Effluent fil = SOD, > 30 � 220 mglL and TSS >30 5 150 mgll- ' Effluent #2 = BOD < 30 mglL and TSS 130 rng/L The Department of Commerce is an equal opportunity service provider and employer. If you need assistance to access services or need material in an alternate format, please contact the department at 608- 266 -3151 or TTY 608 -264 -8777. SBD•t U0 IR.WWr �I 000 ��o pA��3 1 Ptz 0MM OWNED; Ev EI2� LE ENO. 4 10 uYEl2 ;FEYE��iSE M E ' T 29 J Tow OV S 4W Z " G -22" S 1 C7Zf unD - 115. � -50fL "INGW/ f3KKFa NO COMM 63 SMACK PPOPLEM5 3>qc�� rp- Rof oSAD P� 3 � T � ► - /Olo.Ct7 � W o 3 /o ao U 102 ,00 100.00 LE B2 � O (� gg.00 u I , n g� i CT. F 5' ' Rk W& g j 5lGNEO C5t ZZLI 3 Z OA1E: 01- 0V- 03 f r 1 Standard Erosion Control Plan for 1 & 2 Family Dwelling onstruction Sites g r According to Chapters ILHR 20 & 21 of the Wisconsin Uniform. Dwelling Code, a soil erosion control plan needs to be submitted and approved prior to the issuance of building permits for 1 & 2 family dwelling units in those jurisdictions where the soil erosion control provisions of the Uniform Dwelling Code are enforced. This Stan- dard Erosion Control Plan is provided to assist in meeting.this requirement. Instructions: 1. Complete this plan by filling in requested information, completing the site diagram and marking (✓) appropriate boxes on the inside of this form. 2. In completing the site diagram, give consideration to potential erosion�that may occur before, during, and after grading. Water runoff patterns can change significantly as a site is reshaped. 3 Submit this 'plan'at the time of building permit application. Site Diagram Scale: 1 inch = feet EROSION CONTROLPLAN LEGEND PROPERTY LINE EXISTING DRAINAGE TD TEMPORARY DIVERSION FINISHED -' DRAINAGE LIMITS OF GRADING SILT FENCE STRAW BALES ¢5 ?, GRAVEL VEGETATION SPECIFICATION TREE PRESERVATIO STOCKPILEr SOIL i indicate r Please ate by completing tr arrow below. i' I O c _ I PROJECT LOCATION `�"c �►s�1�yAll��r r i4u6:S6o I _ a —r —r BUILDER I.. umb 1�sV i't>GR.S LNG, OWNER 1 00 t A ►m fi_4 � iS� Q EROSION CONTROL PLAN CHECKLIST 1°ia:. Check ( ✓) appro Q priate boxes below, and complete the site diagram wil'i necessary information. ` 'F Site Characteristics Bil North arrow, scale, and site boundary. Indicate and name adjacent streets or roadways. 6 , Location of existing drainageways, streams, rivers, lakes, wetlands or wells. O lLocation of storm sewer inlets. Location of existing and proposed buildings and paved areas. W The disturbed area on the lot. Approximate gradient and direction of slopes before grading operations.' Approximate gradient and direction of slopes after final grading operations. r &J O Overland runoff (sheet flow) coming onto the site from adjacent areas. 1 Erosion Control, Practices O ,� Lo'cation of temporary soil storage piles. , "Note' Soil storage piles should be placed behind a sediment fence, a 10 foot wide vegetative strip, or should be covered with a tarp or more than 25 feet from any downslope road or drainageway. Ifi Location of gravel access drive(s). Note: Gravel drive should have 2 to 3 inch aggregate stone laid at least 7 feet wade and 6 inches thick. Drives should extend from the roadway 50 feet or to the house foundation (whichever is less). Location of sediment controls (filter fabric fence, straw bale fence or 10 -foot wide vegetative strips) that will pre - s.Nent eroded soil from leaving the site. ❑ l Location of sediment barriers around on -site storm sewer inlets. O !i Location of diversions. Note: Although not specifically required by code, it is recommended that concentr•?ted flow ( drainageways) be diverted (re- directed) around disturbed areas. Overland runoff (sheet flow) from adjacent areas greater than 10,000 sq. ft. should also be diverted around disturbed areas. O CY�Location of practices that will be applied to control erosion on steep slopes. (greater than 12% grade). Note: Such practices include maintaining existing vegetation, placement of addit:.)nal sediment fences, diversions, and re- vegetation by sodding or by seeding with use of erosion control mats. O CV Location of practices that will control erosion in areas of concentrated runoff flow. Note: Unstabilized drainageways, ditches, diversions, and inlets should be protected from erosion through use of such practices as in- channel fabric or straw bale barriers, erosion control mats, staked sod, and rock rip -rap. When used, a given in- channel barrier should not receive drainage from more than two acres of unpaved area, or one acre of paved area. !n- channel practices should not be installed in perennial streams (streams with year -round flow.) O , CB ;Location of other planned practices not already noted. .....�f.,M• —� —� .,.....� °mow, _•. .. . ..... .... . .. 8e �r9 D L I LI .If • -ol' r a Indicate management strategy by checking ( ✓) the appropriate box: a - Q = / Management Strategies ❑ C�3' Temporary stabilization of disturbed areas. Note: It is recommended that disturbed areas and soil piles left inactive for extended periods of time be stabilized by seeding (between April 1st and September 15th), or by other cover, such as tarping or mulching. Permanent stabilization of site by re- vegetation or other means as soon as possible (lawn establishment). Indicate re- vegetation method: Seed 10 ❑ Other ❑ Expected date of permanent re- vegetation: SPA ZvC Re- vegetation responsibility of: Builder ❑ Owner /Buyer (� Is temporary seeding )r mulching planned if site is not seeded by Sept. 15 or sodded by Nov. 15? Yes ❑ No ❑ ❑ Ce; Use of downspout and /or sump pump outlet extensions. Note: It is recommended that flow from downspouts and sump pump outlets be routed through plastic drainage pipe to stable areas such as established sod or pavement. ❑ GYTrapping sediment during dewatering operations. Note: Sediment -laden discharge water from pumping operations should be ponded behind a sediment barrier until most of the sediment settles out. Proper disposal of building material waste so that pollutants and debris are not carried off -site by wind or water. LET Maintenance of erosion control practices. • Sediment will be removed from behind sediment fences and barriers before it reaches a depth that is equal to k half the barrier's height. • Breaks and gaps in sediment fences and barriers will be repaired immediately. Decomposing straw bales will be replaced (typical bale life is three months). • All sediment that moves off -site due to construction activity will be cleaned up before the end of the same workday. All sediment that moves off -site due to storm events will be cleaned up before the end of the next workday. Gravel access drives will be maintained throughout construction. All installed erosion control practices will be maintained until the disturbed areas they protect are stabilized. For more assistance on plan preparation, refer to Chapters ILHR 20 & 21 of the Wisconsin Uniform Dwelling Code, the DNR Wisconsin Construction Site Best Management Handbook, and UW— Extension publication Erosion Control for Home, Builders. The Wisconsin Uniform Dwelling Code and the Wisconsin Construction Site Best Management Handbook are available through State of Wisconsin Document Sales, 608/266 -3558. Erosion Control for Home Builders (GWQ001) can be ordered through Cooperative Extension Publications, 608/262 -3346 or the Department of Industry, Labor and Human Relations, 608/267 -9360. EROSION CONTROL REGULATIONS UNIFORM DWELLING CODE (DILHR) PROJECTS AFFECTED MAINTENANCE AN WASTE DISPOSAL • All new 1 and 2 family dwellings in Wisconsin started • Sediment controls must be maintained until the site is on or after December 1, 1992, stabilized by mulching and seeding, sodding or • Additions to dwellings built after June 1, 1980. landscaping APPLICATION PROCESS • All building waste must be properly disposed to pre- vent pollutants and debris from being carried off -site • Erosion control plan must be submitted with building permit application to the local building inspector in ENFORCEMENT communities where the dwelling code is enforced • Erosion control inspections will be made during other • Erosion control plan must show: regular inspections (footing and foundation, rough con - - Location of the dwelling, other buildings, wells, sur- struction, final, etc.) face waters and disposal systems on the site with • Violations must be corrected within 72 hours respect to property lines • Stop work orders m ,.y be issued for noncompliance — Direction of all slopes on the site FOR MORE INFORMATION, CONTACT — Location and type of erosion control measures • Local building inspector CONTROLS REQUIRED • Department of Industry, Labor and Human Relations • Silt fences or straw bales along downslope sides and side (DILHR), Safety and Buildings Division, P.O. Box slopes 7969, Madison, Wisconsin 53707, (608) 267 -5113. i • ut 'FftM Gravel access drive n ! Straw bales, filter fabric fences or other barriers to protect on -site sewer inlets ,. '• „ • "'Additional controls if needed for steep slopes or other special conditions STORMWATER PERMIT (DNR) PROJECTS AF F iCT'ED — Proposed erosion and storm water pollution control • Any construction project that disturbs 5 acres or more practices during and after construction • Smaller sites that are part of a planned development — Documentation that an erosion control and storm involving 5 acres or more of land disturbance water management plan which meets DNR standards • Effective October 1, 1992 for any new or continuing has been prepared (plan does not need to be submit- project ted with the application) • Exceptions: Indian tribal lands and work done by local —Other information related to site location and per - : -government staff mit holder APPLICATION PROCESS CONTROLS REQUIRED • File a "notice of intent' application (Form #3400 - 161) • Erosion control mea:;ures specified in the Wisconsin with the Department of Natural Resources (DNR) 30 Construction Site Best. Management Practice Handbook days before construction begins • Measures to control storm water after construction • Application must include: FOR MORE INFORIVIATION, CONTACT — Timetable for land disturbing activities and installa- • Department of Natural Resources, Storm Water Per - tion of erosion control measures including project mits, P.O. 7921, 1�;adison, WI 53707 -7921, (608) start and completion dates 266 -7078 LOCAL' ORDINANCES Check with your county, and city, village or town for any local erosion control ordin .ces including shoreland zoning r::quirements. Except for new 1 & 2 family dwellings, local ordinances may be more s rict than state regulations. They inay also require erosion control on construction projects not affected by state or federal regulations. A publication of the University of Wisconsin - Extension, in cooperation with the Wisconsin Departmont of Natural Resources and Depart- ment of Industry, Labor & Human Relations, Ron Struss, UWEX Water Quality Specialist, Western Area, and Carolyn D. Johnson, UWEX Water Quality_ Specialist, Southeast Area. ST CROIX COUNTY SEPTIC TANK MAINTENANCE AGREEMENT AND OWNERSHIP CERTIFICATION FORM Owner/Buyer ''" Y �- Ann L L IZe 1 r Mailing Address Property Address (Verification required from Planning Department for new construction) f- dKn /0 33' /o D o City /State gyb,%ow Parcel Identification Number 1?4 DKp 0 37 30 0 0 C) LEGAL DESCRIPTION Property Location &W '/4, ' /a, Sec. , T_1i�_N -RJj_W, Town of - T'Ra!j Subdivision V- S &\ Certified Survey Map # 7 �3� '� p , Volume ��`� Page # !is 3L6 Warranty Deed # 7 13 -5 , Volume `Z Z Sd , Page # _ �_s 0 . Spec house O yes l no Lot lines identifiable yes O no SYSTEM MAINTENANCE Improper use and maintenance of your septic system could result in its premature failure to handle wastes. Proper maintenance consists of pumping out the septic tank every three years or sooner, if needed by a licensed pumper. What you put into the system can affect the function of the septic tank as a treatment stage in the waste disposal system. The property owner agrees to submit to St. Croix Zoning Department a certification form, signed by the owner and by a master plumber, journeyman plumber, restricted plumber or a licensed pumper verifying that (1) the on -site wastewater disposal system is in proper operating condition and/or (2) after inspection and pumping (if necessary), the septic tank is less than 1/3 full of sludge. I/we, the undersigned have Lead the above requirements and agree to maintain the q h private sewage disposal system with the standar g P g p Y set forth, herein, as set by the Department of Commerce and the Department of Natural Resources, State of Wisconsin. Certification stating that your septic system has been maintained must be completed and returned to the St. Croix County Zoning Office within 30 days of the three year expiration date. Z\ /10 /a>, SIGNATURE OF APPLICANT DATE OWNER CERTIFICATION I (we) certify that all statements on this form are true to the best of my (our) knowledge. I (we) am (are) the owner(s) of the Rroperty described above, by virtue of a warranty deed recorded in Register of Deeds Office. '5L Z/ 03 SIGNATURE OF APPLICANT DATE ****** Any information that is mis- represented may result in the sanitary permit being revoked by the Zoning Department. * * * * ** ** Inefaide with this application: a stamped warranty deed from the Register of Deeds office a copy of the certified survey map if reference is made in the warranty deed Private Onsite Wastewater Treatment System Management Plan Septic Tank And Gravity In- Ground Soil Absorption Component Pursuant to Comm 83.54 Wis. Adm. Code each Private Onsite Wastewater Treatment System (POWTS) shall include information and procedures for maintaining the system within the parameters of Comm 83 and 84, and the conditions of approval by the department, agent, or governmental unit. The approved plans and permits for system are on file at the county zoning or health department. This management plan complies with Comm 83.54, Wis. Adm. Code, and the In- Ground Soil Absorption Component Manual for Private Onsite Wastewater Treatment Systems SBD- 10567-P (8.6/99). Table 1: System Design Specifications Sanitary Permit Number �U Number of Bedrooms Design Flow - Peak (gpd) Estimated Flow - Average (gpd) Septic Tank Capacity (gal) Soil Absorption Component Size (ft') Type of Wastewater Domestic Table 2: Soil Absorption Component - Limits of Reliable Operation Septic Tank Component Soil Absorption Component Design Flow - Peak (gpd) Maximum Influent Particle Size (in) 1/8 Maximum BOD (mg /L) 220 Maximum TSS (mg /L) 150 Table 3: Maintenance Schedule Septic Tank Inspe and /or service once every 3 year Outlet Filter Inspect once a year and clean at least once years Soil Absorption Component Inspect once every 3 years Septic Tank The septic tank shall be maintained by an individual certified to service septic tanks under s. 281.48, Stats. The contents of the septic tank shall be disposed of in accordance with NR 113, Wis. Adm. Code (Servicing Septic or Holding Tanks, Pumping Chambers, Grease Interceptors, Seepage Beds, Seepage Pits, Seepage Trenches, Privies, or Portable Restrooms). The operating condition of the septic tank and outlet filter shall be assessed at least once every 3 years by inspection. The outlet filter shall be cleaned as necessary to ensure proper operation. The filter cartridge should not be removed unless provisions are made to retain solids in the tank that may slough off the filter when removed from its enclosure. If the r - Management Plan for a Septic Tank and Soil Absorption Component filter is equipped with an alarm t serviced i the alarm is activated continuous) qu pped w he filter shall be se c d f . y Intermittent filter alarms may indicate sure flows or an impending continuous alarm. The Y g P 9 septic tank shall have its contents removed when the volume of scum and sludge in the tank exceeds 1/3 the liquid volume of the tank. If the contents of the tank are not removed at the time of an assessment, maintenance personnel shall advise the owner of when the next service needs to be performed to maintain less than maximum scum and sludge accumulation in the tank. Manhole risers, access risers and covers should be inspected for water tightness and soundness. Access openings used for service and assessment shall be sealed watertight upon the completion of service. Any opening deemed unsound, defective, or subject to failure must be replaced. Exposed access openings greater than 8- inches in diameter shall be secured by an effective locking device to prevent accidental or unauthorized entry into the tank. No one should enter a septic or other treatment or holding tank for any reason without being in full compliance with OSHA standards for entering a confined space. The atmosphere within the septic or other treatment of holding tank may contain lethal gases, and rescue of a person from the interior of the tank may be difficult or impossible. Tank abandonment shall be in accordance with Comm 83.33, Wis. Adm. Code when the tank is no longer used as a POWTS component. Soil Absorption Component The soil absorption component serving this structure is designed to accept domestic wastewater from a residential facility. The limits of operation of this component are shown in Table 2. The longevity of a soil absorption component depends greatly on proper and timely maintenance, and system use within or below the limits of reliable operation. Good water conservation practices by all occupants and the installation of water conserving plumbing fixtures are key factors in extending the useful life of this component. The soil absorption component's operation must be assessed by inspection at least once every three years. The inspection shall include recording the levels of ponding, if any, in the observation i es, and a visual inspection for an evidence of surface seepage or discharge I PP P Y g from the component. On steeply sloping sites, areas of erosion should be identified and reported to the owner for repair. The surface discharge of domestic wastewater or sewage from the system is prohibited and considered a human health hazard. Traffic around or over the soil absorption component should be avoided particularly during winter months. The compaction or removal of snow cover over the component may lead to hydraulic failure by freezing. This type of failure is usually temporary, but is difficult or impossible to repair until weather conditions improve. In general, soil compaction over this component will reduce diffusion of oxygen into the soil and dispersal cell, which may lead to more intense, and earlier, organic clogging of the soil. 2 Management Plan for a Septic Tank and Soil Absorption Component Plantings of deep- rooted trees and shrubs directly over or within ten feet of the component should be avoided since root intrusion into the component may obstruct wastewater flow. o Pi 6, X73 715 6117 23�/ CO 2 ptjr/% ,1 6 "�r� - 71,5 - - to - 6 KS 3 1 2256P 150 t 723353 STATE BAR OF WISCONSIN FORM 3 - 1998 KATHLEEN H. VALSH QUIT CLAIM DEED REGISTER OF DEEDS ST. CROIX CO., VI Document Number RECEIVED FOR RECORD S L Tpis l Deed, made between V t/ or m a r, a r7,4 05/29/2003 08 s 35Ad t r C'�/ `C F E QUIT CLAIM DEED EXEMPT t B Grantor, REC FEE: 11.00 and TJL s E TRANS FEEL COPY Ffifi / /S CC FEE: Q S St.1 r U i V0 lr Mq r. +4 I D'r, in i7P Grantee. PAGfiS: 1 Grantor quit claims to Grantee the following describ� estate in s , Grantor lP I O X ) r County, State of Wisconsin: 0 c Q 'r e c7- 1 �'1 Record ng Area - f / n / E f / 4/ an � T /t �., Name and Return Address e y t� � e l \ se • t l 1q o 5� (�� of SPA. V�`1 Tow►�s Valley N W H see n , �� 5t/o) 16 Af 7 O 6-F Tie Parcel Identification on Nu (PIN This homestead property. o /+ s u t Vey 3 J 7 p ��a p oc, c.c m e o f li ecor cct fhe ��5; StPr on Together with all appurtenant rights. title and interests. +� M _P�• Dated this day of ano I! C co t (SEAL) i'.07 he yC % y 1Sen (SEAL) eu�re Z &0 (SEAL) — (SEAL) AUTHENTICATION ACKNOWLEDGMENT Signature(s) , State of Wisconsin, es. County. authenticated this day of Personally came trefore me this a 4 day of 'OD 1 the above named rr sew TITLE: MEMBER STATE BAR OF WISCONSIN to (If not, me known to be the person who executed the foregoing authorized by 5706.06, Wis. Stats.) instrument and acknowledge the same. THIS INSTRUMENT WAS DRAFTED BY QD Ili ./!� * Notary Public, St of Wisconsin 4 07' My commission is permanent. (If not, state on date: (Signatures may be authenticated or acknowledged. Both are not necessary.) Names or persons signing In any capacity moat be typed or printed below their signature. STATE BAR OF WISCONSIN Wisconsin Lagal Blank Co.. Inc. QUIT CLAIM DEED FORM No. 3 - 1998 Milwaukee, Wis. a - 2 3 1 7 0 VOL 17 PAGE 4526 KATHLEEN H. WIL REGISTER OF DEEDS ST. CROIX CO. MI RECEIVED FOR kECOR CERTIFIED SURVEY MAP 05/28/2003 03:00 RTIFIED SURVE HAP LOCATED IN THE SW 1/4 OF THE NE 1/4 AND THE NW 1/4 co FEE: OF THE SE 1/4 OF SECTION 8, T28N, R19W, TOWN OF TROY PAGE • 2 ST. CROIX COUNTY, WISCONSIN. N 1/4 CORNER SECTION 8 b T28N, R 19W OWNERS AND SUBDIVIDERS 3 M NORMAN AND SHIRLEE FEYEREISEN W O — 6 N- 429 TOVINSVALLEY ROAD I HUDSON, WISCONSIN 54016 _ o 1— o c I I I UNPLA TIED 8QIx z B R /CK SW 114 -NE1 14 LAND N 89 °23' 35" E 333.21' w x at; m — — — — — —� 50.42' 282.79' IWO I S£ 1 /4 -NW 114 W� LOT 1 WOta. m� mzo(n I Q� 3.525 ACRES ° 153,540 S.F. I OI 3I N INCLUDING .- TOWN ROAD '\ N I RIGHT -OF -WAY PROVED zo ST. C,ROIX C h ° ( .. i r r j 1 I o 3.000 ACRES U I N h 13os84 s. F. UNPL A_ T_ TED _ EXCLUDING 50' W '� AY 2 Z�Q� 3 2 °' TOWN ROAD 8 I o LAND x_ 3 RIGHT-OF-WAY I ►� — — — II I IF (1Q1 1t>4t ' 'w yVt.Tlf, JU YS W r' , tD O �pt�F.�val data a i shalt be g I io W 150 I B 1 S PROPOSED 82 .(n I DRIVEWAY - EAST -WEST 1/4 150' ------- - - -�Iz -- -- 83 I - -- -- I ZI i �{ - ' - SECTION LINE UNPL A T TED I 0� II 0 I I - - 5 0' LAND I a Iul DRAINAGE I z. o WAY LO 47.89' 1 278.38' I S 89 W 326.27' x NW 1 14 -SE 114 o POINT OF NE 114-SW N BEGINNING / w '/4 =o 1 33'' .33� i UNPLA T TED LAND �W I I I E I LEGEND COUNTY SECTION CORNER MONUMENT, N ALUMINUM CAP, FOUND. 0 1 1/4" x 24" IRON PIPE WEIGHING 1.68# /LINEAR FOOT, SET. - — EXISTING FENCE. S 1/4 CORNER B1 SOIL BORING PERFORMED BY MARY JO SECTION 8 HOLLISTER ON JANUARY 8, 2003. T28N, R 19W - BUILDING SETBACK LINE. SCALE IN FEET (R-) PREVIOUSLY RECORDED INFORMATION. *NOTE: ALL IRON PIPE SET ARE DIMENSIONED AS OUTSIDE DIAMETER.* 0 50 100 200 300 THIS INSTRUMENT DRAFTED BY JEROD A. FINK FARCE r CF F Vol.17 Page 4526 r t I CERTIFIED SURVEY MAP LOCATED IN THE SW 1/4 OF THE NE 1/4 AND THE NW 1/4 OF THE SE 1/4 OF SECTION 8, T28N, R19W, TOWN OF TROY, ST. CROIX COUNTY, WISCONSIN. SURVEYOR' S CERTIFICATE I, JAMES D. FILKINS, REGISTERED LAND SURVEYOR, HEREBY CERTIFY THAT I HAVE SURVEYED, DIVIDED AND MAPPED THIS CERTIFIED SURVEY MAP LOCATED IN THE SW 1/4 OF THE NE 1/4 AND THE NW 1/4 OF THE SE 1/4 OF SECTION 8, T28N, R19W, TOWN OF TROY, ST. CROIX COUNTY, WISCONSIN, DESCRIBED AS FOLLOWS: COMMENCING AT THE S 1/4 CORNER OF SAID SECTION 8; THENCE N 00 °56'46" W (BEARINGS REFERENCED TO THE NORTH —SOUTH 1/4 SECTION LINE OF SAID SECTION 8, ASSUMED TO BEAR N 00 0 56'46" W) 2476.57' ALONG SAID NORTH —SOUTH 1/4 SECTION LINE TO THE POINT OF BEGINNING; THENCE N 00 °56'46" W 465.64' ALONG SAID NORTH —SOUTH 1/4 SECTION LINE; THENCE N 89 °23'35" E 333.21'; THENCE S 00 °05'30" E 465.65'; THENCE S 89 °23'35" W 326.27' TO THE POINT OF BEGINNING. THIS PARCEL CONTAINS 3.525 ACRES, MORE OR LESS, BEING 153,540 SQUARE FEET, MORE OR LESS, INCLUDING EXISTING TOWN ROAD RIGHT —OF —WAY, AND 3.000 ACRES, MORE OR LESS, BEING 130,684 SQUARE FEET, MORE OR LESS, EXCLUDING EXISTING TOWN ROAD RIGHT —OF -MAY. SUBJECT TO ALL EASEMENTS, RESTRICTIONS, AND COVENANTS OF RECORD. I CERTIFY THAT I HAVE MADE SUCH SURVEY, LAND DIVISION AND CERTIFIED SURVEY MAP BY THE DIRECTION OF THE OWNERS OF SAID LAND, THAT SUCH MAP IS A CORRECT REPRESENTATION OF ALL THE EXTERIOR BOUNDARIES OF THE LAND SURVEYED AND THE SUBDIVISION THEREOF MADE, AND THAT I HAVE FULLY COMPLIED WITH THE PROVISIONS OF CHAPTER 236 OF THE WISCONSIN STATUTES AND THE SUBDIVISION RULES AND REGULATIONS OF THE TOWN OF TROY AND ST. CROIX COUNTY IN SURVEYING, DIVIDING, AND MAPPING THE SAME. DATE: FEBRUARY 5, 2003 97Z REVISED: MARCH 4, 2003 AAES D. FILKINS S -2246 JOB #02 -2660 LII EGISTERED LAND SURVEYOR OGDEN ENGINEERING COMPANY ipn 1234 SOUTH WASSON LANE coov RIVER FALLS, WISCONSIN 54022 JAMES D. FILKINS a 5.2248 OWNERS AND SUBDIVIDERS RIVER FALLS, Q 429 TOWNSVALLEY ROAD E I SEN � HUDSON, WISCONSIN 54016 qr� U R�� � mm�u��unua�a NOTE: EACH PARCEL SHOWN ON THIS MAP IS SUBJECT TO STATE, COUNTY, AND TOWNSHIP LAWS, RULES, AND REGULATIONS (,I.E., WETLAND, MINIMUM LOT SIZE, ACCESS TO PARCEL, ETC.). BEFORE PURCHASING OR DEVELOPING ANY LOT, � CONTACT THE ST. CROIX COUNTY ZONING OFFICE AND THE TOWN OF TROY. THIS MAP HAS BEEN APPROVED BY THE TOWN OF TROY. I DATE MARGARET ANN DESLAURIERS, CLERK PAGE 2 OF 2