Loading...
HomeMy WebLinkAbout1958 S1297(2) .pdfINDEX OF SHEETS SH' NO. I TITLE SH6` NO. 2. TYPICAL. GROSS SECTIONS SHR NO. 3 ESTIMATE OF QUANTITIES SHIT NO. -'-- MISCELLANEOUS QUANTITIES SHT NO. — RIGHT OF WAY PLAT SPIT NO, 4-5 PLAN AND PROFILE STA, 0-59 SHIT N0.6-12 STANDARD DETAILS SHM NO 13-19 DRAINAGE STRUGTURES SHIT NO 20-29 CROSS SECTIONS STATESTATE OF WISCONSIN HIGHWAY TO STA. 32+00 d CONVENTIONAL SIGNS PLAN AND PROFILE OF PROPOSED RIVERWILLOW 1 IX COUNTY PROJECT DS 12 7(2) CULVERTS YN PLACE ... _,. -. Sin C"•° .... -+^ '.. m oa-an fU VEP?TS REQUIRED r, `Y C? INLET c: :Y, 7'G l_R POLE_. .... .. +;r4 a;nT U: N„" ,. 'a, ..... _._....... OR TE I EC nA_P_tf CI-.._.A.�E RPSb:NY RIGHT X ..P. R-1 RKEP: REFERENCE STAKE(OR HUBS O LT a w+• WIRE LENCr tI004Eh. _.__. __.__. {Oa4-v SP,... MARSH HEOGE _... "..`". C .`.RATF CC CITY wm� R'REES .. -. _... .J PROPERTY „,I,g T A-: - „,' r TROVE .i "Ay'vA vc ... :: ::.:':c GRPUNO ELEVATION ...... u."..._. �'_..... a PINQ F .05.. PAST OR SURY&T LINE � .. GRADE ELEVATION.. Ph 0 1 2 SCALE a TOTAL NET LENCdYf Cr CENTEIIL"'; a 0617 CRtulix wtui[ <aAAss aw pGrtetwCwa t eice 6. P Kest TGirp{. ' AM3 0.MJ -`'{{'" ( C1Y15 GAY M BEA L2T; HICKWAV SYTICM 4T TK FSYA+4 [ O F C£ 4 mxs - 4r`rn uv. '.+ •a.. � Rg HALF SECTION - PIPE CULVERTS ' HALF SECTION— BOX CULVERTS TREATMENT WHEN A+ R IS FROM 0 TO 5 FT. SLOPES NOT STEEPER THAN 25,1 GENERAL NOTES DETAILS OF CONSTRUCTION NOT SHOWN HERE SHALL CONFORM TO THE FERTH TOP OF THE PROPOSED CULVERT PRIOR TO EXCAVATING THE TRENCH RENT REQUIREMENTS OF THE STANDARD SPECIFICATIONS AND THE APPLICABLE IN THE CASE OF CONCRETE. BOX CULVERTS, THE. EXCAVATION BELOW SPECIAL PROVISIONS. THE BOTTOM AND NECESSARY TO PREPARE THE TRENCH WILL BE DETAILS ARE NOT APPLICABLE FOR PRIVATE ENTRANCE CULVERTS, MEASURED AND PA@ FOR AT THE CONTRACT UNIT PRICE BID PER DETAILS APPLY TO BOTH PIPE AND CONCRETE BOX CULVERTS UNLESS OTHER CUBIC YARD FOR"EXCAVATION FOR STRUCTURES, CULVERTS." WISE SHOWN ON OTHER PARTS OF THE PLAN OR IN THE CONTRACT. IN THE CASE. OF PIPE CULVERTS, ALL EXCAVATION FOR FORM - EXCAVATION FOR AREAS MARKED'T" WILL. BE PAID FOR AT THE CON- ING THE BED SHALL BE INCLUDED IN THE CONTRACT UNIT TRACT UNIT PRICES FOR PERTINENT' ITEMS OF "ROADWAY AND DRAIN- PRICE PER LINEAR FOOT OF THE SEVERAL TYPES AND SIZES AGE EXCAVATION; WHEN SUCH EXCAVATION CONSISTS OF MATERIAL NOT OF CULVERT PIPE. PLACED UNDER THE CURRENT CONTRACT. BACKFILL IN THESE AREAS TO BE IN EITHER CASE, BACK FILL WILL BE PAID FOR AT THE PERTI- PAID FOR AT THE PERTINENT UNIT PRICE BID FOR`SAND GRAVEL FILL' OR NENT CONTRACT PRICE FOR THE MATERIAL USED. FOR MATERIAL USED. A- DEPTH OF BALLAST COURSE, THE ELEVATION OF THE EXISTING GROUND OR PREVIOUSLY PLACED AND S -DISTANCE FROM TOP OF CULVERT TO BOTTOM OF BALLAST, COMPACTED EMBANKMENT SHALL BE AT LEAST IN THE PLANE OF THE D- VARIABLE, DEPTH OF BALLAST BELOW CULVERT. MINIMUM-I27. m SECTIONHALF TREATMENT WHEN B - •' F— DISTANCE FROM FINISHED SURFACE TO STREAM BED. iF EXCAVATION FOR APEA MARKED V SHALL BE MEASURED PAID FOR IN ACCORDANCE WITH SECTION 21OT Oa OF tr ( THE STANDARD SPECIFICATIONS, AND AT THE CONTRACT UNIT PRICE BID PER CUBIC YARD OF ORIGINAL VOLUME FOR �'"" A¢ ;'0'r"•- w-'5�, "EXCAVATION FOR STRUCTURES, BRIDGES.` BACKFILL TO BE IN ACCORDANCE MYTH SECTI04 2[0T03 OF THE STANDARD SPECIFICATIONS. i (STATE HIGHWAY COMMISSION OF WISCONSIN I FOR A[[PPROVALL-�T PE51Gn CHGINCiR <0n54R tOR L Wn EB_ ARPR"Ep pAT, I, FIGS '.HEtceCp KC. S K>F",AL RLINT REFERRED ON PICFILE —12 ITS' Et, SU-PACE -SAIV I6 AREA 16, Of Aa Of p,l,r FRFFRRBO 10 OR 4TSCMINStSTA'S 000 TO 6157 INCL CTw'WP SI-EPE -P,!IT REFERRED TO C4 X-SECTtCNS 5"GIRAVEL OR CE.h ED STE' E QUANTITES PER. STA P-11E =1961" - lELFT7FP LP9 SELECTkO E"A4XAFNT SUBBASE MURSE C 10' Ho' KINT REFERRED TO 01 PPOFILE IF V7 !LIRF I ;I.47 NEFE,,RES ', Gl t�TIIS CT- 'AA'L PCIfdT RFYC4AE0 TO "I R—,EClMN5 6'?.IAVI-'L CP CNIj- 'NEC 644f C-LISE 12'SELECTF-D EISAO-IT-17 ","DAPE UY�'E C 048 S 3, f 0, IS CXO' 0 0" z 0' '.c' ISO, Los, TO 2 0' FqR 'R ----- SOD "CUNDINS ROCK TO SO EMBEDDED 14 Z,.CITAR TYPICAL SECTION OF PAVED DITCH SEM 2N SHOW I NIL GUTOFF_�OIAILL STANDARD DETAILS fLM LINE OF CNM4 PROFILE SHryliNg SPACING OF CUTOFF VALLE ESTE CUTOFF WALLS WILL NOT BE PEASURTO MR PMMT 6 U7 FFALL BE MUSHOCRIM AS INTO ENT-1- RORK --I. INCLUDED IN INS P410E -I' AICk P , OR — "' O-l-E. 'PAII"G tGROUTED U93LE1 � 1' 0,694 DETAILS FOR PAVED DITCHES BID ITEM ( "IE - ZI SLCEE PAVING (GROVTED RVEMLEI I 2(l EIC 'BAC-I'LL MO CL',IfPTT T I I NE AND S :E FLAT ANP`40-�C"FS 1-41 1 CR�,(TERALNG OLD ROAD 6 131 S7PUSTUI`Ak- PLATE MIE I`RCN 5 CERO "L P'PE AFCN 1 3 HARDER ,F, a PARKER 1,CSIS FOR 11111TO- -RA 44 LTETI. P"!B BEAR 'UAqD S STECL aFAM M,FYl LUA" NOTE BIT SURF NOT PART OF THIS CONTRACT TYPICAL Cfi0SS SECTION F CO FF 0 'PP Cf w< MYaihv I rmaar Poor S.Ct GIt five[ ELEV.AL�Q`[. ELFVATi,QN Ef_EVATION. TM -BE? POT STEEL P051 ALIER NATE_ TYPE_RQ,^RT-5--RQR, 511EL P AT &EAM-MARLANQ STEEL PLATE_ 9EAM_LMED1AN)_G_UARB rvm••m rxemrrn �sT.rxr @aa 9omt'.n! N ry. `ari SY('EL LOCATIQN DIAGRAM FORR=Ej„,pR .ATE NAM GUARD AT BRIDGE E)01 m �111 y Ell. S1Ntl r '}5 � �tl FIM A tr. 1 5'y T ae P 1 6 B 6-'t . ! P "El ba S P 9 S k 9 CIS p �. 00 ..� raxaza. r-au rerf f2 Y_NPC RtM -.Y.. 5>c4 tir<c..Y1BI MQE[IfTsljf�,-�E:_g_pY E.LEYATgN �TEEL?LAT��HEaM .CyLARQ�R, .v STEEy_PyATE 6EAM_L1AEDI^1N)_9UARD 4'TF. wide S ^e P xex Cpm n ♦ d i x rIpNAO. STEEL PLAT BE-. LVIRP tr EAy i xf 'l r-D ^"m G ..,Y- LOCATION DIAGRAM FOR STEEL PLATE BEAM GUARD AT BRIDGE APPROACHES Srf.YlaO Nyk} FPe ROiI EIY+h"e Spli4nY el EC I E11,11 xx-,1 A 51y11E HIX. Yoe A14" PrA O Np10 All E un fuPjf[I J toctw�n0 toRrmte SECTION "A A" ,RAIL ELEMENT SECTION (Mm * GAGE STEELS flal I'll, 12 CopSa.. i G E $ r reT�y T.9 FPO tT t T af{'F 5 d0 VIEW TYPO A All W aPE P } r hx s sn' r51^ r E d�Ye.velan .xA4 9 f'➢11iQn Qt STTEL.FLATE BEAM.CII)ARR To.-,11 maim 13NT-Y:E. Typtl- E PL,AN VIEW ,PLAN VI W plfr_Ava.Sros.T _TEBA1tN9L..5EG.T14N DETAILS PQR. ,STEEL PS,ATE BEAM GUTARD ,f. GPv }XwvCw &on 9Nn fTi MYk' L If4 t Yp i LtsD 11t ma Cetal t^en a¢¢f x"all, TfPO ebl pxel ip 11f, W vu6oP uupctl f "114 ,ldp11 "lWx .Jm,, a 11T"'d <F .nSYvtArf Y rh olynPPR .,I f¢ d,,ya J_ fdl¢vinp mw"Yi ry. f' !Tn tJP 4 A lap Srf RAIL ELEMENT SPLICING,,. —POST rm MQUN 1 IAI r+p NC�f E!Ovy p'i Yp[ PW.4 c! Tf�an api!} ,,b•�:re t� S F Ar 4f 1 + E d._E�zrpncn. ETEEL.P1°ATE. BEAM (M EDII AN} GUARD xa iz GPp0 _PLAN VIEW SEBI STEEL PLATE BEAM WEDITAANI GUARD `W'n F., 'C•.n FYa 11u1i2 F'nt CIRVB-PTA Mu Y ara:wfYY far &am Cvrvnp C 4Pr1 u.+preY foe Fon SD¢e'"Ca. LLJ.1 L+v25' DENERAI-N,QM5- tp0tnnIIM[mrtrvttimrn�eMY ct Ipbf' IAlf 7µna1P cPvfwm f- "A,, dM T S f ft 1 Pn 0 Gq 6 I( Fe 0 ) G Y u 1 a4 nr N a ro tt' L"al. lT.C1 w r dr pe dsst f v v X g f Y a s dr m R IY M` 5 1 f1 TTe pl> IT "" f 1 �anE C I f tm PO Ef M1PNM mR N r f p ID aI, 4 PX ptxYn N r p Yl p SeC Ar IFF• DCp,All 1E,ydpµn _1 15 tIM 0 Lpl."CEd t IVYn¢ c�> Itl p 1 1 I f Q t'q C cf fh Yh I bM}q IW RC pqf DM p'fXE 0 1"d",Pf}iC v.Fhtl CI p d'. c}µM'tl¢d P'PYn p aV M U t , [! npNl mPYY Cm4M1 tprarpp t ¢ rd IXa ql% Fn. r, bFCTc TM alw.a-.I'Mcr D 24Crr .PPc,men cl tM1Y v!b®I FI_IB v}B: i'f. tpB oIN YGllp C} r20 tl IRE 4.' Ynf 4xrra,+'+h PF»m N �e¢ae(xtloT'farti} +Mru am .rwc }A t xfptie PPCSµtl amµ pv,f,bf" b o 1 ?2'.0rn+1"ncmamd I,na TnPYa or j — pgli Ytl CW rp} ce^f}t ao�.l �In v �+P.ImP..r drill Yffba ¢N &M1cll 11 AT } Prt a eP^.¢MrPlad I>a0 cf r^e w^.nrner. l Bdtf of'r hvf. PA[NTIN�(wXo ncP rv+tlxw y>titrrewt .w"v 1aT1 fI--11 f-�e. -f-S mrlm. n» If, fA, n'Bm i'v.t x ,, x,mnr x,,., Ira e�n Pay 1 1 m fTf ruff I.T^. ..a. .sx..eapw craaxr aa.s pn x+'^ui b AltA'l r em 1f�*«`x¢I(.rr.sx,"rvwx man+ev^}Nlo'.Y vc.":w ys'T :1rN n'+M eY brats aa�m. CIRCULAR STEEL PLATE ELEMENT Sr y p f.M 1„ e f S.tp efer,oa! of Y.IfY 1501 1 'aP 1 M "aD PefO flq, $ft 2 X C Nxli p taR bhb x'knbvviA PF l YJ Y I, !qll 9tl ( f $hnf M 1y1 My ^imWr b¢ q ncf 2fYtM_ A! TE_RNATE.P_4SiS. 6w r f pP r n EY u1 f xf t PIP ffevq Gn E oMlw vnXeYY Y e M Qt,W 1 I G 0 tX ppprt tM Ip» f cdr pnlatl , e 'b-ter m n NfaaaCtrvn eX EwrvBr fP'ne �'M'Re� b P rwxrof gMvr•af SImVr ctttNq ab}v MVM E.rrp AASYG My ^m MHn CT•Y by[M va la-n Ixnea m xlaxem5 nax as used nrw¢ve ry >.o,.xr wae: vnc�rK wrt+rzem v <mo-:na fmu-rv,e m QIQ kT M .P.5Z1 4 Nd252l 4Sfve(Plote Sex lMn9 PnI Gu>! ..-_.En Ft. m 1' FCr grtvo CNJ i' •ta [ .�.. ♦. '. ®pngN Zp - WIM-1 COIPP -M Of PMar Si0o WM1on GU[YB of tmdaaA PT er PCof Pla[MmMorPostmPT 0 t jjngkajaRK RT wc�clulu�OV I11II [I D+[ l, loo t lL :I�500'4 1� I�[�I I rI I P rtx PoaP Ir 0 lb a A lir PoWY Pt i(MeP 519P ^^^yyyr GEHERA4 NOTES WMiY[aPCmWlevpizr+roPM+w^wMOCwwirq �flam9«n.wP[r He�f � hot tm SMMnC Speeireealiwx SKPia+s 2S29,R24 [nG 4t2d uM [M epptlw SPocigl Peavioea+x Allpmh to R�StdAd[erd ROW,C 011 MRIph9af Pory MwYHt m k[a11CP1 [[agf 4u Pom6Rg aM ROPHLPor Dili. 0.11 PotfW iMV N t W y P n,"W IN MI &MYf M[itMf PbtApry WPoIt C`Mal,$WfM[n Y[IWm Pb93, MuwnA Pi^a, Wldto Pirva ex Jacx Ru. Map[KERPQ T9FORR�NT (SWAY Rgnt aP Wa9 M. Patla W qP • to nm.'. of GPa6i5y ppeatYmw. PP}P{ mmeepp ♦h 4lgP{Q OP$P9iM11[E QI W bfALlgl1. &Pg QpYAtlQO&M808 C[VPfIPa MPaln} taPPo4[Qurmg wocnwaarow ta4taqusn4 apwafgaP wt4♦repo IWO pr�ta e¢uPtaKo Pp}it tMIC N Wn M a[ ira wfev C'Sh Of tn[ KghwX R r;f f oC Ntly, tAP onf(rtlp t6n 1-M RIgM OP Wa) 0^0 anau N n PI eN Ipa[ m[ aatrt MW 4t IM bx`Wh [MII LV tag+, 1a IM 11 "oP lw'EN"A otaCl bePCm of o`r Rlgnf aP , PLxta Halt Lw aF4M m ," f ' h 1M Erl mot Rttgela 4Mih br RIpR[ aP MYOY Mort[° Pe V W w9tl ^of Cw rpeMv0. CFLFUM-A 0 Ts R[f1W¢lar U,,M Noll Ivw lIll Ic MI P41[m TF B1iR 0exf[e. Unit at[MnGll ""ll EmamlmmumM718"I^1[ngCh. Rot'nc, Umh P➢' a N N"~with PYarM oapPM trp mow cllpt fw wm8 mourvtl^g. 4Atih x"11 bo v Ild in IIPM1hPP f l KPIx h an0 ucurovp ifayo0 la path R[floe4ae Ualh L916 D[k�t Mll[6 ee Rawl SMUIm( MIMor Poll[ a lfl MARKER RM RIGFRTDE WAY B14ITEMS N a. 2523-5 Martor Na 2523-6 Manner car« --YM Rlclvt STRUCTURAL PLATE PIPE ARCH Q Fw ppp� Gr;a m'tFinareea DETAIL OF METAL. CORRUGATIONS CORRUG-TION DIwENSYON TOLERANCES OTOt W" OTErtw AN,rtIN#' CORRUGATED METAL PIPE ARCH tRbprpel __PH p : Gee .tree"Ova e!n 4T Y% i RETAIL OF METAL CORRUGATIONS GENERAL NOTES s^>et [F'.Y>m ra lna pRn:.pnl ra:u'.rYa!v cr t`.b sx4ro S:p+'r.cr,xb3 -.a zalz a«.a Are enp I. R cypligF^'a :"eE "rf Prnrlt,o"l TOLERANCES a All, pee rm nav- mRirv«Rand YM r. ee rlt. (k} rx e+tYi txM Por awed a r.v."..e cr SK :14R w MR+aI ¢^ c¢ .nvmn r<kmneex vb'I n� e[YRq Pprt,rvp"I<. nl fA t...nplpn.OraM !.Ytamraeinp. EMBANKMENT- MIM Aa Por Ct. CO,,," ""=p* rm Flll .bl, b,p ".... vnY w rCP PI P,?p Av[M1 (I,wuvp0 mn9 OWbaR"ST,O or r`-6`n.n,nen. w iFIXER-tl'9 ilta garv^a^.Y t1v m�s:�,un GMrn 4Y a-O>«pn.«rap. ion cr e.pp m[n tner.,SCn e,A rvn.nvn cf 6"cupl�n IMYvpan qaa rv•E Bcranpr. EMBANKMENT -Maximum Par Q CNIa#ct6 All ri Ial ("I ..11.d t Y. a*ml ba NA b`.Nrl.q oe P,pp Art'bt.ar IV" ll, ae.q r i n tt We<I Y:<otry eoripy w o.OE pbn arlb oppi'[M.Ip $CF�of RR�40rt GENERAL NOTES pr 4 M nn r ,abut. m Pap &A, "All ll-e W ,[yv amanrt e<M slMlld $p¢31mrlOn#•$ea p 2i11. 31r6 o mp ewI-tll $;evmv Fbm.me. TOLERANCES TCI.Yrnnca t�vn IM Q�mpltVjlr4 JN61.nq YCY mf " 1 1 ®11 M pafmii F4:Ia pCr�m+y aga�eElart! PEPIR^ vT ma E tr ary evmn.e. EMBANKMENT-MWP ,,ln fm @, Cubist# Fm'FlCu4p Tppa Papnw nn. Aln 1—IlA eMa'iroy Cr• come c+pr r:y cF Ppp 0.rCr (Irvallod r ',bnl txall tlp "S71P v Y"minlmun. wcFgck,giP YYpp �OpM• hrro nlnnnum QYarA IX m.x-t^•al :re rn er nr. A,an Exmf by Yh#e,q rn n M S"[vx':a bpnrepn a ar N pmanant. EMBANKMENT-MAvimum for E Cuty®rte @ t 11„ m t cYc.1 LgRrcra C En Px P A C1n el 1> Crt"lu.v cry Ca-, TABLE OF PROPERTIES STRUCTURAL PLATE PIPE ARCH N'l. 10- x- ryoe 511u11l P'xlp l', Ae11 • 1111, O� er [ rE�ip• p Qopp t-olY N m yr C'+PoleO PbetpE rn ANA ft"I vAary 6aat`C=4: urcc xCniie tY yy^tea 4b !4 ne4Y t ..G. .M1ben w Pnf "ol, tbtlYl Dp uvpd. NDTE. All L. „.t;P'. rvp. R, .. r, I"I N, true. cY 11. Rou•d P'..Y el A;vcx Ewaf Pv7nery i.P .l.nc-...5 exrf fa 69[�T ]Cl PST � 9ft 591 SA 1464 LP ��ylW�{l��y##t��tiyL4ol1mu#1 p � IS _ SEAEE HIGHWAY COMMISSIONOFWtSMNS/N Y� .xP.«tb a WHEN REMOVED FROM NEW CO,STpUCjjOq AND WITHIN SIGHT OF NEW PROJECT DEPENDENT ON w IOTH"W'PEMOVAL It OF SHADED PORTION 04 ADAPTING OLD ROAD SLOPES THEREOF, BY BOUNCING, MERGING OR BLENDING SLOPES TO CONTIGUOUS TERRAIN SHALL BE CON SFCEPIE� WHEN TOP OF OACKSErPR OF NEW CONSrRiNCTION ISSN CLOSE PROXIMITY OF TOP Or 8ACKSLOPE OF OLD ROAD 13 -"—\ALTERNATE I W SECTIONS WHEN BACIISLOPE OF NEW CON- STROCTIDN EXIENDSINTO CON- STRUCTION LIMITS OF OLD ROAD 0 SECT Or C30TIRAT10N SECT Or OSI.TTERATiCN AND STRP0. BALANCED SECnCu ,.-LIMIT OF NEW SECTION CONSTRUCTION NOTES DETAILS IF CONSTRUCTION NOT SHOWN SHALL CONFORM TO THE PCRTNENT REQUIREVENTS OF THE. STANDARD SPECIFICATIONS AND THE APPLICABLE SPECIAL PROVISIONS. WHEN OLD ROAD tS IN EMBANKMENT AND RemovED FROM NOW CCNSTIQCTICI ALT WITHIN SIGHT Or NEW PROJECT It II ROAD BALANCED SECTION-, BORROW W_ SECTION WHEN B:11I 'F ANC OLD ROAD ARE PIT EMBANKMENT AND CON- STRUCTION IS CLOSELY ADJACENT OF APPROACH W: 16� FOR P.E. W 4 Mift FOR& R� L (H-O) S+IM� +(HI-D) S+f] OF HIGHWAY 250'MIN, D CL OF CULVERT PIPE SECTION IN FILL E/Z SECTION IN CUT SECTION TYPICAL LAYOUT FOR SIDE ROADS IN CUT TYPICAL CROSS w w OF HIGHWAY Em ow Va 0> WIDTH OF ROADBED VARIABLE FLOW LINE OF DITCH,.r^t°%0 m 00 w 0 wo IS' MIN TO EDGE VARIABLE OF ROAD METAL MII, SIGHT DISTANCE FOR PE. ATPOINTX-10d RADII SHOWN ARE DEPENDENT 0 W ON CLASS LAID OUT OF HIGHWAY AND WILL BE IN THE FIELD BY THE ENGINEER, ,CONTINUE SLOPE PROFILE 'P : A OF QUANTITIES CONTRACT NO I 't-, RO,'�D ESTIMATE AND BRIDGE CONS�FRUCTtt,' N T H S TA I Wy COMWSSION OF TIISCONSI. EDITION 0 , F, 11�57 Dst297(2) zz;, 0 UND,- ��i- FOR APPROVED AUGUST 9, 1957, AND SPECIAL PROVISICNS AS ATTACHED TO PROPOSALS GR -WE L CR s7c, I -let's FrR It mix S,jRFACE Its= WX JXCL SURFACE 3 2 CU. cu ys, YD. GA 27,185 1 23 t 3462 t 0 -59 32+00 3259 14 24 f4 24 27,185 23 3462 3259 14 24 14 24 C E P, S fSTRU CT U R ES 'G F T SPAN I-T Wj:1'7;tl STEEL U,stlt- BEAR- 001, STEEL 1`11MG KoTED Ills CRETE STEEL RAILINS 8powd PACs "TEI qy SCAL 25, 10 1 SP I LN LDS s 338 170 2279 667 32,290 92,430 1 135 135 338 103 18 l70 227.9 66.7 32990 92,430 I 135 135 GPDJ c 14 A 164 14 3465 3465 674 t3o 108 to Ho 35 164 14 3465 3465 674 130 108 10 r 110 35 S12+ n aC ~--^ �R EG APPROACH RIp,1Rft0YEtFENT A7 803`52755 ___ _ . x a la+oa n as a , � (M - xd 4 ---. �.. j d 76' 33. END APPROACH l.,.rRQVEh.9ENT _ j� STA. 18+5fi C7-RP- 6SP79762P r .:AA' 7 }` 670..E+6Q Y.T. p 33 tt i �. i ;3` % ✓ ",nj ^ „ 64� q,, REMOVE EXIST. C. °A. C.R T 646.24 'Zh CON ST, R, E Y' ( 1-19'%28'Q.P. REQ'D. L 1093.5E Y \\\\ SE. 0,078'/FT. to 1 / 1 "OP) SCD CHANNEL F2E4'C1a 4pfP 6T I4-00 RT ("4 SQ.YQS.) Po_ a srn O'C9 Crn. Ai .^ ," 1 STA. SUPER EkE VAT to ...__..,.,. CNTERSECT[ON DETAIL ~'' � � ,7.^'` CTONSn56.RD- BEG. rROJ DS 1297(21 s "" /"�/ r 1/ O�..c cTu. A °" 0,1E .0,0 d. c,�n+•d gs `G �' STA.0 59 0*70 +O 041 Do— PC . FY3696 L`.0OY CD.T ;rA o+x r p s STA. 7.. 25 RT \�. _C7 cTNd �`.. CONST,CTH AA F.E. P. REQ D. `'. (f"'-.--..' a";,��''J Y s° ir�"CC•:3T CHANNEL CTH- AA R� 1 "� - 22 % HV (5'BOTTOM) r - f•"' ` � PC c. STA. 1+*e.4a. ..% oe r " r s _ PALE s^. ao' CT.9. AA �.].�� '•�~`,{,�„� VARVABLE FiADPP75 QE,i'AiL PC STA. ¢z 5355¢ Ec. R, t= S L.-�..,_-,-�. •"' STA. E 5 E 6E0 R75 S i STA. 2+"55 T: k (CT. H. AM13 \"S. STA. 6i Q TO 3'w'(5 RT. l}. RD. crw STA. 10+25 i0 t5+75 RT SD RD ATM, AA TAI .._.NET. -.LENGTH QF CENTERLINE.- wcOvs B ssP92 ��.. F h ALIGNMENT DE -...L. , ._._. ._ _ .--.__. , Lit E. STA,0Y 53 Tt7 STA_ 5f L74 iG.LN..Fifi}_y.59 I^F.FT_..____ ., , , ,.... i _ _ � t t I . .. SOD INLET APRON .ftEQ°D.(IQ SQ.YDS1 p 250 _ 1 - so DO 240 _a 1 sa -- 230 �o �a r r u rt J d W TAU i e Y T 6 rt M N n ... Nrv_. �. rt N ..__ 25 "4KKF/tl.0 R^4vYOC>,44NCo %YC4\. M�nWM WFC4i'Y GK.k biEte-ti 04E4.t'rW pflSCT'.. 4'a'.�C.xf:\ clM1 \0 5 ,rvE ELEVATION um FOOTING PLAN y TjHQWSNG V4 %, S'TRS.\NG T NV M6CRlliG CF ®tMPgv4 3i END VIEW j In`d:tK rl B DETAIL A i e nTtg" DETAIL B a �pSlZ9i(2� 6 `29 . BILL OF BARS aaa I]tN.EN$tCM fn N REnCa6 utl1 u.s ARE nn10 o T OOo tN". MMi SCC Y LI OT13 5Pr< 11. 'iiPGA�'k0l CeT ._�.,.0_.PERT 0,'O➢ 3VACE Tb CF-«A4 PM c "on" 6 A9 ct 4`P^4 Bk6RAPEi' x_ t9 h (v ° 14 A7 4 4-6 6-0 R A4 wy 1 ntP A f-U G 2R nra +a �-c n m Q 11M1AVx A & 4". DETAIL G It DETAIL, D DETAIL E 11 cPex.Pv, �} f, cw verxoEa� -t"Ytisati rs.c8 GRID_ DETAIL ........ �• d'YV .So F ES n 9" G t'.b ! NUFE'. PIC.I ;o [G{)K"$44E4YXY_^. tJ'PvVVYI"> E't L.41uG. P.%4nVh'CdoN vow`$T.RCS C:TU�S' }14µ4L 110t 6R N\GNCR. 7NAN 'R M SECTION Al EAST ABIJTMENT nhpn >Y 6 f rasx 1 v41 fi r . f la v3., C. 6 9 55-52 5 7 X 18628 b PLAN END VIEW SECTION P3 NITSP3 IT or 1�1 2 llMsy 11,11T 10R1C1 0 �l IT 1", 117 C. llpl.0 �",. SECTION P1 F7/7 w S" SECTION P2 PIEP,'f ZZfo BILL OF BARS PlEWZ ZO-90� A 7 1 1", L!u kFa -2 PA -- — ---- -------- z7", -------- — - ---- --- 1uows DETAIL DETAIL "C4 m GRID DETAIL nevi — L---- PIERS J B 55 52 -- 5 -7 X 18627 A FRONT ELEVATIONz✓ 2 E4;`SFn SECTION B3 FOOTING PLAN It -OF ®EARtNG OPTIONAL. KCYt D COP$ JOINT FORMED 0Y SURFACED, BEVELED 112 J__ __1_62 { u i_.__._._`_ U ((// f c�) END VIEW .r•Fa.OF STRINGER b r BILL. OF BARS 2,E I0 # OVMENStONS tN BDNOINU DCTAI LS ARE ON7 TQ OUT. PQUR YxR% Ff 4. SCY,EILCNGTH gPgCY!a3� mom® LOCATION �fYFT � {41 �4� Co— Eis Lw FS } F40 TbNG -�-• •�-�•�� {p 1B2 Z4� Cn .> O SNOWNI C(iLU MN - B_4 2 �II 4 IZ Co SHOwN4 _ ST1RRU a5 '_.. ! a � ISS 8 1 4 6Z Co 'SHOAIN� COLVMNS- � fFL—E4 Ca� 5 `3 'LO e? SNCSWry GIRDER HaTTaM _ � __, 19"7 Ca Cn c� @ &�Iu t"� ONflWFit__ SIDF_.T ... R, TOP PLACE SYM ABCUT(Zir (QSHOWNI iO4 t2 q Z-Ca� IIIRIUFS, 84+4 C'O �o [El' tD 0 14 t0"tPARpPE.TIS26 ¢"a SNC?'.yN FI h.UNCF{ 6tto Z ( 4 �I9 d k`RQWNI PARAPC,T SIOE5 �Y�4 ` BVH�2.Ol BV9 4 4 4 3 SHC]WNJ wIN,- F_YEc L FCRM G'J SEVEIE A _.®.A �.pi M... B. MARK DIM.°' bit ? '._ i 7 'f_ 9 � DETAIL A G C H 0 s t' 4 e^ r (._ H I Jam? P S"- DETAIL B O' 3 DETAIL C WEST ABUTMENT 1_. B ® 5 5 - 5 2 4 _. X 18626 i --7 F=77777-7 F� I I 111�1111 M, LUBR, BRONZE PL LOP PART EEARING A NCM li'll Ml� , M , . I'll 3 - , 1. - 10, 1, BEARING NOTES +S,,rwc, �(D 03 <11. llllcra rFOO--1111-11'1 T.l, JOINT DETAIL LEGEND 4. I', z 4 "R �11,D 1. 4'Z I' e 11, 1. q 111 Ole$ 11 N fM,u m s,e- OF 3X-s i< q Er» C, : ., �_ ,_, El-{ E4 R. 1.11 MLl-1 'La..Ul 11a11 n-.ltl BEARINGS 8 EXPANSION JOINT B -55 -52 3 7 X 18625 " P'f. Nwt4 'Rm,!i^Ve G. R'M V-o C/fNxPCRC}l5 49 &x..Re �— P� 1 tVR` 9` 1v nce G aow'..- 40F"M1 4 Lt 'P'4;S �P.2 Ca1nFNi'R., toTC:'tCe'Ae:P¢WYTr.Tn TRnN9, PWY4 VN St wn 3uw4F. et }r,rpµf:a'rC¢ qp G4N'[VNVCA'9 B4R CN 4Vn3 fN G4 AV.I4CCNT -p I � , c,�„„"a3 i' w ee.eN Svwvct+a nxa a rvmv¢v4a<e4se ewe�ses n< s°-a' c.Rs 1 _. o..ia rmce. n. ne. cGixsw 4Ha verxnent< wrmoslMaYe�v ynwn ez weeH sT*e'nocces t e3N. MA _H-P.4'. 1.114 G 4'rt A•tv 4wT 't _'iY �x / ti� 'E, fix[�E C6ntfggi..} i ne A Ji `♦ T'H9wMK. I t '., t✓. lF6 ( [. YRPH9 R9WK RCNM VLV4GvaN 5tORP. Fv � 1 Yf 3 ."y� r t....•.... � Tall I't C<cA Y t- "— { ✓" ~"" ST Fi65e \'� dTRI G 4 Y 6YY."-q roY 5 d tNSm^d-r,-, , 'fiu N.a (z -CH R J^ .. —^S FmC . ".Tb>E]V,.%:. ^LTdd.l n.,. PIJCS y f r r hjN1 4 �0.p LC I QEFjZQ TI N D[AGRA E a6UY v 6eai. V4.AD4Y..y y'r.ea [zJ r a: ['.e rtotw i t.r� �A '.TC'i° M' Pl GG YP,0. C49GR fl f { � FORMI�tG DIAGRAM VV m.` � �H YITCKK CRY °) 4 -P¢ t4uTiWV <N O.5( Fv1NG CY. E lde Gk.'[fR :. _. G er cec+e 4s u TNetwe ee m w c rt'la a Nccaeo.;, n..0 cnwn 2" ra '--' p"' 4Ne ael.P Pif4Z. CG+M1GtY'.0 ? P'Hf [P fCES`)ARY. -,rarr� cL< P(nW ll; x 10 Naze PCatcD. f==5`-\C t `— SECTION SI HALF PLAN .G OF vea t' ^.; ar Srs +t r _ CJP RZ FiCP£^ k 6°w k E ^pq SGryry �1 S3i rnt 4 F}-`�t6' WY -tP3 i0 t 4 i ANLY I itwtYM 'YWVN4 � AQGM1.YOQN! gqr 12 b '.5 C+ � ST 3 6 Sly C Q _ eruD �w 0+5 w. MC NCw•{ xFt. 810. 283 -o Ae rw tnd 6-, „"" 1 �ry�(/ sy/ry ' /t fpTR h .G,y^ � 4`Y C%T WOav4 N 'J e. F bwH F1b T utc'rm ra G' w ew C sT C 3eKTNM _ a C. aMlY k' G F 'SP4tC"m . Gt. OQ F\. r MPl%.dMUM r �2A3�a;.�Pi t'/"- i i SHEAR LUG SPACING YFA ' TF_, ^JeM( ,G®t uD�f'.T.iAtlA.iltGC°ttnu wC3oFa:r6aEl%j kT A ..�•,x6 !'Y➢ t....1^l ilV1rER a P..�L...A.�T._E .a_D ..E�.�T. Ap L JJPGJT CONNECTION -- PARTPLAN AT AUT. .S�e L _ XctTkD � e _ ta�nN �"C•.p• SEGT.SS ELE11ATION -' .._�._. SECTION LI A I �yqe �q� —LPU GCrE F 9. P 4. 04 f PO^.4 tN FtPIO. (, k,. E U DETAILS B1i NI- PV V1.0YF 11' SHEAR LUG PART ELEV OF RAfA J tNG "� °" n`"< LAMINATED SHIM mms "- "'ry S TF S ry 'rr SC _ SUPERSTRUCTURE B 55 -52 2 7. 18624 I 1w I I 1-4 1 sow o =ICTC mls.-RT -EAL WAS 17 41 'WE TO 11.111, ,,, ,C 5ILTLL W FROM im .1 mVRm Cl"v 2o110 -M VW7TOM ev 1 W115. 11 T eQl 55.612970 11.2 4 ;�IZ97�z) 13 ZP 7 Ms. 3 0 12 US MUM Lam -r -4 2 -1 °s`FUCTUkhL CA 6eeNZI - PLWI nj o -77 7777- ar HIS Tairm— LV -7 57-EEL G LYN6—Ito ok - - - no Ic - y - i 7 GENERAL NOTES r umm" BE 'Lill NU�S WORC,,,C.- 51RIIT-R�- �V p.ry not tc.swl WK Jim 60, ,1-- LIST OF DRAWINGS � lf,�VIAL PLAN 5 MIX, AOU-Mtllr GENERAL PLAN -55 52 11-1 I CURVE DATA PO,T PI, STA. 3+ 2981 97A 6t5653 A146 R 0 T Z 2 33- 4'191 ST,AO MTANC�TH AA� Ell 91 GO' LT T 192.91 L 374.2,6 I < BCD DITCH REQ'D 0.081'/FT STA, 2+00 TO 6+56 LTN550 5V) s E I PAVED DITCH REOD, l STA. -, a 717 7 TA, 0 -59 CT H 'AA'- 0+00 SD RD. aD, N. PROJ, DS 1297 (2) Hv X, X 4 TRAN I N 3,f TRAM T, PAVED DITCH REQ'D, STA. 6+ EO TO 6+75 ITT 3'BOTTOM OT5 SY1 STA, 3+25 RT CONST, FE, NET LENGTH OF CENTERLME STA. 5+00 TO STA 32+0 CUT I B2,478 ,4 17 cy13 eq 5 C Y SCX SD PO FILL D67 aY t ,2,qc9, ay_ - sp-Ra-, 2,122 cfl M 1 120 1 CY SEL. E".B 588 f ci254 - SO. Rif U79 C.Y, C,Y Tcr - STA'S, 8+24-324LO WASTE 3,902fC+E PI STA 13*23 46 AZ 237-01' A 57* 01' D 9- 00' RT, T 34613 L 63"Z E OOBIVFT. QQ LAKE STEEL PLATE BEAM CUARD REQ'D STA, 6+11 TO 6+52 LE (41 FT) STA, 6+13 TO 6+54 RE 141 FT STA, 8+26 TO 8+67 LT (4E STA, 8+27 TO 8+68 RT (41 FT) Q/ ti "�4 A0 r , p 7..NT MARKER POSTS PECID, STA, 91,00 TO 12+-CO IT) LT STA 9+00 TO t2 +CO (7) RT CURVE DATA PI. STA - 2�J-4 2E AZ.. 158 0+30' L 2154' 30' D 31 CO' LT r 369.7( L 730.28 S E, 0,048'/F T < O-Z9 POYJER POLE 6+68 wpmE 14400 34176 POWER POLE ETA 27+90 LT CCNST, F.E, F­R"X26'CP REOV POT RT. I22998j STA 35+F530 RT t 232.12 Z, LAKE Ys.P.iRab, 7 f OBLITERATE OLD ROAD BL E`p STA 8+20 TO 9f20 ITT STAA4+50 TO 27+50 FIT STA, 28+00 RT STA, 30f95 RT CONST P.E. CCNST RE, I-WX26'Cl REQ'a I-M'X26' CP PEQ'D 4(UU N� 1:1, -7.H A 7- ------ .,o CUT 13,2io cy. f I FILL o'gil ay. 220 n--- -------- t 14A-,6+57LL 3490 CX SEL�048 FRCM SfAS 4100 RZ A J-1 Z5 of 6 STA17+40.CO [-.5SPAN CONT I -BEAM (50-62-50) BRIDGE REO'D. f 2ZO.-20- CLEAR RMYT. SEE DRAWLIGS DO'S, X18623 THOU XI8E29 A clx 2 i E GRAZEICRAA' �l 1 1 ?10 STA 1-19'X18'X46'CjU.EA VI PLACE 1113 N 4 DA" REDO, f DtTC 29'XlB'XMfC` C,IP,PA. EXTENSIO FIT, Rro D. i zoo, A;2 STA 23+34, ----- 1-24!x 59, RO' DITCR DANICp REO'ED.D, STA.23JOD LT "R­ CT n 0 I� 0 0 '0 0 A, 2 ................................ . .... . . . .. . 11 SUBSURFACE EXPLORATION FOR -FOUNDATION DESIGN 'ON THE DESIGN OF THE STRUCTURE FOUNDATION, TO ORTANI RELATIVE DATA CONCERNING THE CHARACTER Of MATERIAL tM AND UPON WHICH THE FOUNDATION NIGHT BE BUILT, BORINGS ANDICR SOUNOM01 E, WERE WAVE AT POINTS APPROXIMATELY AS INDICATED ON THIS DRAWING WITH THE LOS 01 SUCH EXPLORATION DATA AS MTZRPR!TEO 10% SUCH NEW Delta, PURPOSE AS SHOWN. THE EXPLORATIONS WERE MADE by OR - STRUCTURE ADEQUATE FOR ORNERY AND CONVENTIONAL METHODS AND CARE DEEMED SUCH BLAMED. HOWEVER, SINCE IT 35 A MATTER OF COMMON XMOW PROBE Fq LEDGE THAT THE EXACT CHARACTER OF AMY MATERIAL ADD ITS REACTION BE' BORING S IS DIFFICULT TO, DETERMINE FROM SUCH SUBSURFACE EXPWRAnDW AND Do NiNRNi PROBE 05 PROBE THAT THE KIND AND CHARACTER OF MATERIAL AT THE SITE WHERE THE FOUARIATtONS ARE BUILT MAY VARY SUBSTANTIALLY FROM THAT INDHOPTED CR BY THE LOT THEY ARE MADE AVAILABLE TO THE WOOERS SIMPLY FC I) OR IMPLIED BE WHAT THEY ARE AANFPEN, WITHOUT ANY WARRANTY, EXPRESSED THAT THE MATERIAL TO BE ENCOUNTERED IN BUILDING THE 100HOATION EXI51ING WILL CONFORM TMZIREWITM. IF THE LOG IN USED BY THE CONTRACT- 5 STRUCTURE OR IN WAKNcE MIS $10, IT IS HERESY EXPRE53LY STIPULATED THAI WOODS THE COMMISSION ACCEPTS NO RESIMMVIPIATY FOR SAGO USE. UAL11% OTHERWISE SPECIFIED THE BLOBS PER FOOT AT THE LOCATIONS NiM&TtO ARE BASER ON INIVINO A 1` 00 9 I.A`ID BRUT SPOON SAMPLER WITH A 140 LIL HAMMER HAVING A FREE FALL OF 30 INCHES THE BLOW COURT IS TAKEN IN UNDISTURBED SOIL IMMEDIATELY BELOW A CASED OR OPEN HOLE ELIMINATING SIDE FUNCTION ON THE DRIVE PIPE. a ETA 6.E0,C ONP 0 R NO 42 SANDY LOAM III LOOSE FINE 5,NNO WITH SILT TRACE OF GRAVEL Aol SLJGRTLY COMPACT NLY —PIO FINE TOTEMOM 5AND STA. 6-60 00 LEGrPID OF ZCaINA OPVRAT,10,16 TRACF OF 5ANV5Tt`HIv FRAGMCrLTS CORING tic, 5 ZE I" LCRIZI LON "A I MX`��FRIAL 1A11LE1 IINI o-TA 8�3Z�� 35 �A ED i F,L Lt IT E FJ 'A I ncRir,g K, PRO, --1' 9 E LC 11 C�I It 1 1� K FOLD ORIVRC ON . .... WA ZL 1<1t NOR OF NORIni END r) DEAL RE, -�PCULDER 5LC',R5 FLIT PF ELF --'I I NEMIJU TO CLARY- �AIIJ AID L,RAEV iUSIN& A 1�0' Hlo"Ecl WIT I -I jYI1 71tl 1�1 A RCEw.,0 VILI.11 14 Y SvRFAL L.51A 911101 Kk A 'TRrF, so yor, ------- 51L7 m CI, 7 RA-0 V. 0, FEA L r�`I�'PZV I)5ING A 25P' 77 � I', � A 1 �ALL -0 I 8C, 7 K L-3 L EL C $RIO 51'CRI"t" tx AEFUPAL 3JR 4STATE HIGHWAY t- --- --- rEr�LAI- ------ 55 IL, 73 go SUBSURFACE EXPLORATION B --52 X 1867 E,27 9