HomeMy WebLinkAbout2022 A6
0
'L O
T
DC E
R
T
I
F
I
E
D
S
U
R
V
E
Y
M
A
PV O
L
U
M
E
2
,
P
A
G
E
5
6
7R I V E R R I D G E R O A DSOUTHEAST CORNER(ALUMINUM CAPPED MONUMENT)EAST 1/4 CORNER(PK NAIL)EAST LINE GOV'T LOT 4
SECTION 36, T29N, R20WCHAIN LINK FENCE
10'R I V E R R I D G E R O A DB L U F F L I N ES M A L L T R A C TL O
T
DC E R T I F
I
E
D
S
U
R
V
E
Y
M
A
PV O L U
M
E
2
,
P
A
G
E
5
6
7
L O T FC E R T I F I E D S U R V E Y M A
PV O L U M E 2, P A G E 5 6
730'30'SSEPTIC VENTWWELLBITUMINOUS DRIVEWAYL O T E71,545 SQ. FT.1.642 ACRESHOUSE10'10'30'37.5'3'±1'±GARAGE25.1
'41.2'40'21.1'RECORDED AS
N61
°47
'36
"E
380
.19
'RECORDED AS N58°28'14"E 366.10'RECORDED AS S26°11'00"E 170.15'RECORDED AS N22°54'20"W 181.25'RECORDED AS N35°22'00"W 31.90'N
S
&
CITY OF HUDSON, ST. CROIX COUNTY, WISCONSIN
MDM
DJZ
10/27/22
8200-001
8200-001 M A P O F S U R V E YLOCATED IN PART OF GOVERNMENT LOT 4 OF SECTION 36, TOWNSHIP 29 NORTH, RANGE 20 WEST CITY OF HUDSON, ST. CROIX COUNTY, WISCONSIN; BEING LOT E OF THE CERTIFIED SURVEY MAP RECORDED IN VOLUME 2, PAGE 567.10/27/2022I hereby certify that this survey wasprepared by me or under my directsupervision, that it is true and correct tothe best of my knowledge and belief, andthat I am a Professional Land Surveyorunder the laws of the State of Wisconsin.Douglas J. Zahler PLS No. 2145DateS U R V E Y O R ' S C E R T I F I C A T ELOT E OF THE CERTIFIED SURVEY MAP RECORDED IN VOLUME 2, PAGE 567 AT THEST. CROIX COUNTY REGISTER OF DEEDS OFFICE, ST. CROIX COUNTY, WISCONSIN.DESCRIPTIONTHE EAST LINE SW 1/4 OF SECTION 36BEARS N00°04'46"W AS REFERENCEDTO THE ST. CROIX COUNTYCOORDINATE SYSTEMSURVEYOR:DOUGLAS J. ZAHLERAUTH CONSULTING & ASSOC.2920 ENLOE STREET SUITE 101HUDSON, WI 54016PREPARED FOR:ALLEN JOHNSON2400 MCDONALD LANEMORGAN HILL, CA 95037NORTHSCALE: 1 INCH = 50 FEET0505025LEGENDFOUND COUNTY SECTION CORNER MONUMENT, ASNOTEDFOUND 5/8 INCH DIAMETER IRON BARFOUND 1-1/4 INCH OUTSIDE DIAMETER IRON PIPEFOUND 1 INCH OUTSIDE DIAMETER IRON PIPESET 1 INCH OUTSIDE DIAMETER X 18 INCH LONG IRONPIPE WEIGHING 1.13 LBS./LINEAL FOOTMINIMUM BUILDING SETBACK AS SHOWNFIELD WORK COMPLETED: 10/12/2022