Meeting called to order by Chairman Meinke at 9:00 A.M. in the
County Board Room of the Courthouse, Hudson, Wisconsin. All
members present.
Motion by Supervisor Kinney to recommend approval of the
September 22, 1987 minutes as written. Seconded by Supervisor
Sweitzer. Minutes approved as written.
OLD BUSINESS:
Ted Mackmiller: Attorney William Radosevich stated that the
project is about 80 percent completed and they are requesting an
extension on the one year to complete this project. The
Department of Natural Resources has granted an extension.
Tom Nelson, St. Croix County Zoning
the previously approved project has
originally approved limits but as ap
time there is a need to either
boundaries or require the fill to
limits approved by the original deci
which included drawings better docum
Hearings called to order
Zoning Administrator read
in the local newspapers.
explained.
1. ARTICLE:
2. ARTICLE:
APPELLANT:
LOCATION:
3. ARTICLE:
APPELLANT:
LOCATION:
Administrator, explained that
been constructed beyond the
proved by the DNR. At this
review and revise the new
be removed to the original
lion. Additional information
ented the original request.
by Chairman Meinke at 9:30 A.M. The
the notice of the hearings as published
The procedures of the hearings were
1764 (1)
Bluff,
Section
T30N-R18W,
T29N-R18W,
Riverway
23, T28N-
4. ARTICLE: 17.18 (1) (r) Two-way Radio Antenna
APPELLANT: Thomas P. Gleason
LOCATION: Part of Government Lou 2, Section 27, T30N-
R20W, Town of St. Joseph
Jeffrey Lee: Mr. Lee explained his request to build a new garage
which would not meet the 100' setback from the right -a -way line
of a town road as required by the county zoning ordinance. He
had agreed in his contract that the contractor was to obtain all
necessary permits and construction was started.
1
®���� �®�@g; Mr. hones presented his request to move an existing
driveway to a location that would be closer than 200 feet to
another driveway. This new placement would make the new entrance
safer.
David Oren: Mr. Oren presented his request to construct a
residence that would only be 60' from the bluffline along the St.
Croix River. This is the only location on this preexisting
parcel that a house can be built upon. Moving the house further
back would place the structure within a second 12 percent slope
which is not permitted by the ordinance.
Dan McGuiness representing the MN -WI Boundary Area Commission
stated that he supports the location being proposed, but that the
25' height restriction should be followed.
Mrs. Bacaner who owns property south of this parcel expressed
interest in the project.
The Zoning Administrator stated that a letter had been received
from Bernie McGaver of the Department of Natural Resources. He
has no objection to the proposed project.
Thomas Gleason: Mr. Gleason presented his request to place a
160' 2-way communication antenna on his property to serve local
businesses in the St. Croix Valley. This would be constructed
and operated by Levques Tower.
Quentin Weinzierl, township of St. Joseph Supervisor, stated
that he is neither for the tower or against it as long as it
meets all of the requirements.
Attorney Warren Brandt, representing Levques Tower and Thomas
Gleason stated that construction had been started but stopped in
good faith when it was realized there was a need for a special
hearing. This shows there is an attempt to work with the system,
and trying to please all concerns.
Dan McGuiness, MN -WI Boundary Area Commission, expressed his
concern about the impacts of visibility, especially if there is a
need for lights. There should be some proof that the tower will
not need lights or will not have dishes hanging from it which
would increase visibility. The tower is not being proposed in
the St. Croix Riverway District but would feel the impact by
visibility.
Martin Levake, owner of Levques Tower, explained there is a need
for this tower by local businesses. The tower is being moved
from Stillwater to Houlton so as to provide a higher elevation
for better communications. FAA currently does not require lights
on antennas under 200 feet in height.
Quentin Weinzierl stated there should be proof of insurance and
not allowing strobe lights; obstruction lights would be okay.
2
Jim Junker, one of the commercial users of the tower, stated the
restrictions encountered in the "valley" are making it very
difficult to operate in the St. Croix River way District.
Hearings recessed for viewing the parcels in question. After
viewing the sites, the board returned to session to render
decisions. The following decisions were made:
1. Ted Mackmiller: Motion by Supervisor Kinney that with the
approval of a one year extension the following shall be required:
A. Written plan appoval by the DNR and upon completion a final
written inspection report.
B. Written approval by the Township.
C. Fill in road ditch be removed, and proper spillway grade be
stabilized using riprap, sod, or seed and netting.
D. The rest of the disturbed project area be sodded.
E. Upon completion, the County Zoning Administrator shall be
contacted to inspect project and will have received all
above written reports.
Motion seconded by Supervisor Sweitzer, Motion to approve as
stated: Kinney, yes; Sweitzer, yes; Meinke, yes. Motion
carried.
2. Jeffrey Lee: Motion by Supervisor Kinney to approve a 61
foot setback from the town road. In granting this setback
neither the township or county can be held liable should the
roadway be widened. Motion seconded by Supervisor Sweitzer.
Motion to approve: Kinney, yes; Sweitzer, yes; Meinke, yes.
Motion carried.
3. Daryl Jones: Motion by Supervisor Kinney to approve a
joint driveway access with said driveway being no less than 30
feet wide. The original driveway is to be properly abandoned.
Upon completion, the township and County Zoning Administrator are
to be contacted for inspection. Motion seconded by Supervisor
Sweitzer. Motion to approve: Kinney, yes; Sweitzer, yes;
Meinke, yes. Motion carried.
4. David Oren: Motion by Supervisor Kinney to approve a 60
foot setback from the first bluffline and adjacent to second
bluffline base. Request for 29' height denied, 25' height to be
maintained as required by ordinance. The construction of the
driveway to be done so no grading or filling be done on 12
percent slopes. The owner is to notify the County Zoning
Administrator and townwhip for final inspection of project.
Motion seconded by Supervisor Sweitzer. Motion to approve said
motion: Kinney, yes; Sweitzer, yes; Meinke, yes. Motion
carried.
5. Thomas Gleason: Motion by Supervisor Sweitzer to approve
3
the construction of the tower permitting construction to begin,
but with the condition that the owner provide proof of insurance
and that this project will be discussed as old business in thirty
days to determine the need for lighting. This project shall also
have approval of the Department of Industry, Labor and Human
Relations. Motion seconded by Supervisor Kinney. Motion to
approve as stated: Kinney, yes; Sweitzer, yes; Meinke, yes.
Motion carried.
Motion by Supervisor Sweitzer to adjourn. Seconded by Supervisor
Kinney. Motion carried. Hearing and meeting adjourned at 4:95
p.m.
Edith Sweitzer, Secretary