HomeMy WebLinkAboutBoard of Adjustment Minutes 8-22-1991Aug. 22, 1991
This meeting was recorded by a court reporter
The meeting was called to order by chairman Kinney at 8:00 A.M.
chairman Kinney explained the procedures of the hearing,
requesting that individuals wishing to testify sign their names
and addresses on the sheet in the front of the room.
Supervisors Bradley, Menter, Sinclear and Kinney were all in
attendance. Supervisor Stephens absence was excused. Staff
included Corporation Counsel Greg Timmerman and Zoning
Administrator Tom Nelson.
Bradley made a motion to adopt the agenda as presented. Menter
seconded the motion. Motion carried.
OLD BUSINESS
ZAPPA BROTHERS EXCAVATING
There was a general discussion on what had been happening with
the gravel and sand operation Zappa Brothers were operating.
GARY CARLSON
Mrs. Gary Carlson requested another extension of their temporary
occupancy permit of the trailer home while they built their new
home.
Bradley made a motion to extend the period until Jan. 1, 1992
after which time the trailer house must be vacated and removed.
Motion seconded by Menter. Motion carried.
NEW BUSINESS
Hearing was called to order at 8:30 A.M. Nelson read the notice
of the hearing as published:
The St. Croix County Board of Adjustment as scheduled a public
hearing for Thursday, Aug. 22, 1991 at 8:30 A.M. in the County
Board Room of the St. Croix County Courthouse, Hudson, Wisconsin
to consider the following appeals to the St. Croix County Zoning
Ordinance. An on site investigation will be made of each site in
question, after which the board contemplates adjournment into
closed session for the purpose of deliberating on the appeals,
pursuant to Sec. 19.85(1)(a), Wisconsin Statutes, and will
reconvene into open session for the purpose of voting on the
appeals.
1. ARTICLE: 226(89) Non -Metallic mining
APPELLANT: Ames Construction, Inc.
LOCATION: SW 1/4 of the SE 1/4 of Sec. 26, T28N-R16W,
Town of Eau Galle
�1
2. ARTICLE: 17.31(2) Setback/Ordinary High Water Mark
APPELLANT: Duane & Connie Haupt
LOCATION. NE 1/4 of the NE 1/4 of Sec. 17, T31N-R18W,
Town of Star Prairie
3. ARTICLE:
APPELLANT.
LOCATION:
4. ARTICLE:
APPELLANT.
LOCATION.
5. ARTICLE:
APPELLANT.
LOCATION.
17.64(5)2 Driveway separation
Eugene Schuldt
S 1/2 of. the SE 1/4 of Sec. 30, T31N-R18W,
Town of Star Prairie
17.64(5)2 Driveway separation
Tom Gleason
SE 1/4 of the NW 1/4 of Sec. 27, T30N-R20W,
Town of St. Joseph
17.15(6)(r) Golf Course
Tom & Kelly LeMure
E 1/2 of the NW 1/4 of
Sec
6. ARTICLE: 17.64(1)(d)2 Setback/ Class D Road
APPELLANT: Dean Eggen Homes/Fred & Sandy Sobottka
LOCATION. SE 1/4 of the NW 1/4 of Sec. 24, T28N-R20W,
Town of Troy
7. ARTICLE: 17.15(1)(0) Salvage Operation
APPELLANT: Wayne Straub
LOCATION. SW 1/4 of the SW 1/4 of Sec. 33, T31N-R18W,
Town of Star Prairie
8. ARTICLE: 17.36(5)(c) Bluffline setback
APPELLANT: M. Terry Lar}cin/Franklin J. Bachman
LOCATION: NW 1/4 of the SW 1/4 of Sec. 7, T28N-R19W,
Town of Troy
9. ARTICLE: 17.36(5)(c)1 Bluffline setback
APPELLANT: Daniel & Carol Hegman
LOCATION. Gov't Lot 4, Sec. 35, T30N-R20W,
Town of St. Joseph
10. ARTICLE: 17.29(2) Filling & Grading
APPELLANT: Allen Nyhagen/Marls Fagerland
LOCATION. SW 1/4 of the SW 1/4 of Sec. 11, T30N-R19W,
Town of Somerset
AMES COPdSTRUCTION, INC.
Nelson stated that no plan has been submitted dealing with their
proposed non-metallic mining operation.
Sinclear made a motion to postpone a decision until the necessary
information has been provided. Motion seconded by Bradley.
Motion carried.
DUANE & CONNIE HAUPT
Duane requested a variance of 14 feet to build an addition closer
to the ordinary high water mark of Squaw Lake. At 61 feet,
theirs would be constructed over an existing deck. The township
of Star Prairie supports this proposal.
EUGERtE SCHULDT
Eugene requested a variance of 12 feet
to another driveway. This location is
town road onto the lot. The township
this proposal.
to be closer than 200 feet
the.safest access from the
of Star Prairie supports
TOM GLEASON
Tom presented a variance request of 175 feet from another
driveway on STH 35. This location would provide central access
to property that could someday provide multicommercial uses. The
township of St. Joseph supports this proposal.
TOM & KELLY LE E
Kelly presented a request for an 18 hole golf course and driving
range. The driving range would be constructed first with the
golf course being added later. Should the clubhouse ever be
desired for restaurant or entertainment purposes it would have to
be rezoned to commercial. The township of Star Prairie supports
the proposal.
DEA21 EGGEN I-TOMES/FRED Sc SAAdDY SOBOTTKA
Dean requested a variance to construct a residence 51 feet from
the township road. The proposed setback is the most conducive
for a walkout basement. Discussion on if there is a true
hardship. The township of Troy recommends they be 70 feet from
the town road.
VaAYAiE STRAUB
Nelson stated
violation of
exception for
proposal as do
the
that this salvage operation
ordinance. Straub is
a salvage operation. The
adjoining property owners.
had been reported as a
requesting a special
to supports this
TERRY LARKIPd/FRAM' K BAC
Terry presented a request to build 40 feet from the bluffline
onto an existing residence. In addition he would like the 50%
rule relaxed, allowing him to exceed 50% of the assessed value.
Discussion on how the Board of Adjustment has no authority to
relax this provision.
Motion by Sinclear to postpone a decision so as to receive
estimates of the values of the construction. Motion seconded by
Bradley. Motion carried.
DAtd & CAROL HEGMAN
Carol requested a variance allowing the construction of a four
season room to be built over the bluff of the St. Croix River.
Nelson stated this was a convenience and not a hardship and
should be denied.
3
AL,LEN NYHAGEN/MARK FAGERLAND
Al presented a plan for filling
navigable water for the purpose
subdivision. This plan also
control plan.
Respectfully submitted:
Robert Stephens, ecretar
TCN:cj
and grading within 300 feet of a
of constructing a road to serve a
included a seeding and erosion