HomeMy WebLinkAboutLUP-2023-034ST C R OIX Community Development
C/G sMTY 1101 Carmichael Road I Hudson WI 54016
6'Gb'C0�9b'L/Z Telephone: 715-386-46801 Email: CDD@SCCWI.gov
www.sccwi.gov
September 18, 2023
CI Randazzo
Jacc Capital, Inc.
5302 Novak Avenue North
Stillwater, MN 55082
RE: LAND USE PERMIT —APPROVAL
PERMIT NUMBER: LUP-2023-034
PROJECT ADDRESS: 273 Andersen Scout Camp Road, Houlton, WI 54082
PROJECT LOCATION: Section 13, T30N R20W, Town of Somerset
PARCEL/ALT ID: 030-2070-30-130 / 13.30.20.770A-45
Mr. Randazzo,
Community Development Staff has finished the review of the submitted Land Use Permit Application #LUP-2023-
034 for the construction of contractor storage facility, as required by Section 15.400.3. This application has been
conditionally approved based on the resubmitted site plan set, dated September13, 2023 and the following findings
of fact for the site and the project:
• The project is located in the town of Somerset and is zoned CA General Commercial.
• Jacc Capital, Inc, will serve as the general contractor and manager for this project.
• The extent of the project consists of construction of a new multi -tenant commercial building with individual
bathrooms, new private on -site wastewater treatment system, driveway, paved parking/access lot,
stormwater retention pond, and landscaping.
• A permit to install a private on -site wastewater system has been approved via permit number SAN-2023-
186 and State Permit Number 651269 on August 28, 2023.
• The Wisconsin Department of Natural Department (DNR) has issued a Certificate of Permit Coverege under
WPDES Construction Site Storm Water Runnoff Permit under permit number WI-S067831-06. A copy of that
permit is on file with this office.
• This application does not cover any approval for any signage on the site.
• The submitted planset meets the prescriptive requirements listed in Chapter 15 General Zoning of the St,
Croix County Code of Ordinances, including stormwater management and erosion and sediment control
plans meeting Wis. Admin Code NR 151, subchapter III and DNR technical standards respectively.
Based on these findings, conditional approval of this Land Use Permit shall be granted with the following:
1) An on -site pre -construction inspection shall be completed by Department Staff after all erosion control
measures and best management practices are in place and prior to any site preparation activites beyond
those needed to create access to the site.
Jared Werner I Land Use Planner Ijamd.wehner@sccwi.gov I Dir. (715) 386-4742
2) All lighting fixtures shall be night sky friendly and pointed downward and inward to the property, as to not
create a light nuisance on neighboring properties or right-of-ways.
3) The installation of retaining walls shall be in accordance with manaufacture's requirements and standards.
Retaining wall specifications shall be submitted to the department upon selection of the necessary products
4) Soil test report for the stormwater retention area shall be submitted prior to the construction of said
stormwater control device.
5) Additional landscaping shall be provided within 15 feet of the edge of the right-of-way east of the driveway
to the northeast corner of the property and to the west of the parking lot/access area for 100 feet west, as
not to disturb the natural area near the pond. The landscaping schedule shall be updated to indicate one
evergreen tree per 100 feet of street frontage, per Section 15.420.11.a Street Setback Londsocping.
6) THE SOIL TESTED AREA FOR THE PRIVATE ON -SITE WASTEWATER TREATMENT SYSTEM SHALL NOT BE
DISTURBED UNTIL INSTALLATION OF THE POWTS IS COMPLETED AND INSPECTED.
7) Final grading of the site shall not result in more than 42" of cover over the soil dispersal area of the private
on -site wastenvater treatment system.
8) An on -site final inspection shall be scheduled prior to the expiration of this permit, once all of the exterior
features shown on the submitted planset are completed.
9) The applicant shall secure all necessary local, state or federal approvals for this project.
10) Any future use that may occur within this approved structure shall be subject to standards listed in any future
zoning district for which this property may be zoned, regardless of the list of approved uses for the current
C-3 General Commercial zoning district.
11) The permit does not allow for any additional construction, structures, or buildings beyond the limits of this
application.
Failure to comply with the standards listed herein shall result in the revocation of this land use permit and may result
in citiations and issuances of fines pursuant to Section 15.555 Land Use Permits. This permit does not grant any
modifications to property not included in the initial scope as submitted in the application.
This permit is valid for one year, with the possibility of up to two (2) six-month extensions 6 the applicant submits
the appropriate permit extension fee and documentation to the Zoning Administrator. A copy of the Land Use
Permit placard should be submitted to the towns local Building Inspector upon applying for town building permit(s).
The orange placard shall be ported on thejobsite and visible from public view.
If you have any further questions or would like further clafication on this matter, please feel free to contact me
during regular business hours of 8:00 AM to 4:30 PM, Monday through Friday, by phone at (715)386-4742 or by
email at fared wehnergsccw' gov. Have a great day.
Respectfully, \\\\\
Jared Werner
Land Use Planner, Community Development Department
St Croix County, Wisconsin
CC: File
Jared Werner I Land Use Planner Ijared.wehner@sccwi.gov I Dir. (715) 386-4742
It Is Unlawful To Commence Work Before This Permit Is Placed In A
Conspicuous Place On The Premises
This Certifies That A
LAND USE PERMIT
in accordance with St. Croix County Land Use Ordinance Chapter 16. SS'S
Has Been Issued To
.)ACC. CAPSrAL _ =Nc.
In compliance with requirements of the St. Croix Ordinance for a - Com"alt CrAL
A#yL=TkAt&&lr 'RoArr fteir, located at of $0l;vr ? RV
Sec. VVXffl_5"fC j N.;R W ; or
Lot C Block ; Subdivision
Town of .�OMIR SET
Dated_.SE►tEMdEE _hZOe
Application No. L!I%'-2bZ9S-03Y
ST. CRO.I:X AUNTY (Vat rid one year from date of issuance)
PROJECT:
JACC CAPITAL GARAGES
273 ANDERSEN SCOUT CAMP TRAIL
SOMERSET, WI 54025
VICINITY MAP
Washh ngton
1 12 Project Site
273 Andersen Scout Camp Trail 35
Somerset, WI 54025
AI' RU
h
F
rr•
TO W/1O Someisef
r
ANDERSEN SCOU I CAMP TRL
13 r 18
14
l�
v
N
F
m
35
N
0 500 1We 1500It
DISCLAIMER. TTry area rv1 Relenless to m
caned. cerrela. ur mmlMMe am
cmrcurme.
,cluspn+ tlrewn are the reeponaalihly of the
uSan
P:\Projects\Projec5 - 2023C2236114 - Somerset Storage Garage\C. Design\Dawing Files\12236114 T-Title SheetEwg
INDEX OF DRAWINGS
T
Title Sheet
C000
Site Exhibit
C100
Site Plan
C200
Grading and Erosion Control Plan
C250
Landscape Plan
C300
Utility Plan
C400
Details
C401
Details
X1
Building Elevations and Rendering Exhibit
PROJECT CONTACTS
Civil Engineer:
Matthew J. Woodruff, P.E.
Larson Engineering, Inc.
3524 Labore Road
White Bear Lake, MN 55110
651.481.9120
Surveyor (Platting):
Dan Thurmes PLS
Cornerstone Land Surveying, Inc.
1970 Northwestern Ave #200
Stillwater, MN 55082
651.275.8969
Septic Desianer/Installer:
Bell Excavating, Inc.
616 5th Street North
PO Box 775
Stillwater, MN 55082
Developer:
CJ Randazzo
Jacc Capitol
5302 Novack Ave
Stillwater, MN 55082
651.472.3892
Well Drilling:
Butterfield Drilling and
Irrigation, Inc.
395 Reed St.
Somerset, WI 54025
CALL BEFORE YOU OIGI
DIGGfRSONFINf
Diggers Hotline, Inc.
811 or 800242-2511
U o�
V
m
Z £
_
O °x
-
N N J Ov t
L C n°o�N
-- --moo N
wM3:�
all
o
J
QN
�
L
r W SO
Ln
a¢Z
Y �
U oQ
M J_
H
J
a
E N
W c;
jLO
Q E
U� DON
UQ
�E
U(�QUn
M
N
a
A
CIOINt„ '
M MAITHEW J r^r
u WOODRUFF c
43396-6 w
c
= HUDSOM
'O S.
Ii l�ltii,;
Rev. Dale OeecnpUon
0913.2023 county commenla
Project p: 12236114 000
Drawn By: TJR
Checked By EGM
Issue Dale: 09.06,23
Sheet Title:
TITLE SHEET
Sheet:
T
8
V O N
N� �
O t
a m 0 a
O L 0 s m
R' t0 O c
a
L con
J 2
LAay w
J w` 3:
link
o
J
a00
w m
> m
z
a Y�
U O w
z
N
0
M J
a
J
a
a LA
a V °�
1 i
d
UQ (DE
U (� C U)
aM
N
r
a
\SGON3i��iyi
Y[� A HEW J li i
Zc W DR11FF _
4MM 8
O HUDSOH
Rev. Date Desmptwn
09.13.2023 County Commenb
Project#: 12236114 000
Drawn By: TJR
Checked By: EGM
Issue Date: 09.06.23
Sheet Title:
SITE EXHIBIT
Sheel
CON
KEY NOTES
ONEW VALLEY GUTTER, SEE DETAIL 2/C400
(D NEW RETAINING WALL, SEE DETAIL 3IG400
ONEW CHAIN LINK FENCE. COORDINATE LOCATION AND
MATERIAL WITH FENCE INSTALLER.
O4 NEW SLIDING GATE. COORDINATE WITH FENCE INSTALLER.
O NEW MONUMENT SIGN
ANDERSEN SCOUT CAMP ROAD -------- -
_ —'——.—.—.—.—._-----------
__�I__- it
I, 500BU4D.ING_SET11ACK I..
EDGE OF�
WETLAND, I
APPROX.
76'
RTrolectssTrojectts - 2023\12236114 - Somerset Storage Garage%C. DesignTmWng FilesU2236114 C100 - Paving Plan.Ewg
SYMBOL LEGEND
NEW BITUMINOUS PAVEMENT
SEE DETAIL BITUMINOUS
LLl L11J NEMOVECESSARY,
AND DISPOSE
THEINFTREES.AS
NECESSARY, FOR THE INSTALLATION
OF SITE IMPROVEMENTS
GENERAL
PROPERTY LINE
EASEMENT LINE
RIGHT-OF-WAY LINE
— - - SETBACK LINE
0
NORTH
0 15 30 50
� o
O N
=c9200
O-L ow.' j
a
-
G1�my_
w
JWM32
9
o
J
W
Lu t(
L
Z
UZQ
C.)Df
M J
a
J
~
LQ
v' 1 N
r
a w
UQ "E
U (D a 1n
QM
N
F
G
Q
a
Nsi��yi
�,py\SCO
A HEalJ li i
Zv w000aus
- 4MM-6 w -
o HUDSON W=
"III
1111110%````
Rev. Data Desorption
09.13.2023 County Commenis
Project#: 12236114.000
Drawn By: TJR
Checked By: EGM
Issue Date: 09.06.23
Sheet Titia:
SITE PLAN
Sheet
C100
EROSION CONTROL NOTES
SYMBOL LEGEND
,. Owner and Contractor shall obtain WPDES permit from WI DNR. Contractor shall be responsible for all fees
10,
All ripap shall be installed with a filter material or soil assembled refund.
20.
Collected sediment, asphalt and concrete millings, floating debds, paper, plastic, fabric, construction and
pertaining W this permit. The permit certificate shall be visibly posted onsfte.
demolition debris and other wastes must be disposed of properly and must comply with WI DNR disposal
EXISTING CONTOURS
11.
All storm sewers discharging Into wetlands or water bodies shall outlet at or below the normal water level of the
r9 9949
requirements.
PROPOSED CONTOURS -MAJOR INTERVAL
controlmeasures(inlet ,siftfence, and rock construction entrances)prior to
2. Installing
at an where is Percent or flatter. The
respnormal
ttlandlevel
949 PROPOSED CONTOURS -MINOR INTERVAL
beginning any excavation or demoltlion work at the site.
an excavry ation work atme site.
be thebody
shall invert of the weamslor
normal water level shall be the invert elevation of the outlet of the wetlantl or water hotly.
21.
Oil, gasoline, paint and any hazardous substances must properly stored, including secondary containment
GRADE BREAK LINE
a to storage areas must be
to prevent spills, leaks or other e. access
to prevent P P r9 9 P P
3. Erosion control measures shown the erosion control Ian are the absolute minimum. The contractor shall
P
,2.
All storm sewer catch basins not for site a construction shall Deg to prevent runoff
9 9 P
al at h
vandalism. Storage and disposal of hazardous waste must be in compliance with WI DNR r ulations.
hazardous wart b R rag l
9 Po P eg
� GRADE SLOPE
earthim
install sediment or basins, siltation fencing, the parallel
se m. sins n construction
from entering the storm sewer system. Catch basins necessary for site drainage during wnstrodion shall be
necessary
SILT FENCE
erosional
deemed pas red rde
contours ed n to the
to the contours as tleemetl necessary to (unbar control erosion. All changes shall be recorded in the SWPPP.
ry 9
provided with inlet rotection.
p p
22.
External washing of trucks and other construction vehicles must Da limited to a defined area of the site. Runoff
9
must be contained and waste Pro disposed of. No engine degreasing is allowed onsite.
0°00®°00°0o RIP-RAP/ROCKCONST. ENTRANCE
4. All construction site entrances shall tl with rock across the entire width of the entrance and
13.
In areas where concentrated haws occur (such as swell and areas in front storm catch basins and intakes)
consumption zone.crushed
from the entrance to a point 50' into the constmction zone.
entrance the
ct t
the erosion control facilities shall be backed by stabilization structure to protect those facilities from the
23.
All liquid and solid wastes generated by concrete washout operations must be contained in a leak -proof
concentrated flows.
containment facility or impermeable liner. A compacted clay liner that does not allow washout liquids to enter
1 1 INLET PROTECTION
5. The tee of the silt fence shall be trenched in a minimum of 6". The trench backfill shall be compacted with a
ground water is considered an impermeable liner. The liquid and solid wastes must not contact the ground, and
vital plate compactor.
14,
Inspect the construction site once every seven days during active construction and within 24 hours after a
there must not be runoff from the warfare washout operations or areas. Liquid and solid wastes must be
IT--o JT
rainfall event greater than 0.5 inches in 24 hours. The construction site shall also be inspected after heavy
disposed of properly and in compliance with WI DNR regulations. A sign must be installed adjacent to each
6. All grading operations shall be conducted in a manner to minimize the potential for site erosion. Sediment
snow and melt events. All inspections shall be recorded.
washout facility to inform concrete equipment operators to utilize the proper facilities.
EXISTING AREAS WITH SLOPES
control practices must be established on all down gradient perimeters before any up gradient land disturbing
EXCEEDING 25%OVER A DISTANCE OF 50'
activities begin.
15.
All BI must be repaired, replaced, or supplemented when they become nonfunctional or the sediment
24.
Upon completion of the prated and stabilization of all graded areas, all temporary erosion control facilities (sift
reaches 112 of the capacity. These repairs must be made within 24 hours of discovery, or as soon as field
fences, hay bales, etc.) shall be removed from the site.
APPROXIMATE SOIL DISTURBANCE LIMITS
7. All exposed soil areas must be stabilized as soon as possible to limit soil erosion but in no case later Nan 14
conditions allow access. All repairs shall be recorded.
days after the construction activity In that potion of the she has temporarily or permanently ceased. Temporary
25.
All permanent stormwater basins must be metered to their design condition immediately following stabilization
stockpiles without significant silt, day or organic components (e.g., clean aggregate stockpiles, demolition
16.
If sediment escapes the construction site, off -site accumulations of sediment must be removed in a manner and
of the sil
concrete stockpiles, sand stockpiles) and the constructed base components of roads, Parking lots and similar
at a frequency sufficient to minimize off -site impacts.
surfaces are exempt from this requirement.
26.
Contractor shall submit Notice of Termination for WI DNR permit within 45 days after Final Stabilization.
SPOT ABBREVIATIONS:
17,
All soils lacked onto pavement shall be removed daily.
950.00 TC TC - TOP OF CURB
8. The normal wetted perimeter of an temporary or permanent drainage ditch or Swale that drains water from an
P Y P ry P 9 Y
27.
Immediate) stabilize all disturbed areas that will remain inactive for l4 days or longer. Between September l5
Y Ys 9 P
949.50 GL GL- GUTTER LINE
partial of the construction site or diverts water around the site must be stabilized within 20011neal feet from
18.
All infiltration areas must be inspected b ensure That no sediment from ongoing construction activity is reachingand
p g g y
October 15: stabilze with mulch tackfier, and a Perennial seed mixed with winter wheat annual oats or
OUT
the property a or from the discharge into an surface water. Stabilization of the last 200 lineal feet
P party 9 W f9 Y
the infiltration area and these areas are protected from compaction due to construction equipment dnvin
P P9
annual a as appropriate fora ion and soil October 15 through cold weather: stabilize with a polymer
rye, 9 type. 9 P Y
m t r
must be completed within 24 hours after connecting to a surface water. Stabilization ofa the remaining portions
pl
across the infiftration area.
and dormant seetl mix, as appropriate for region and soil type.
B- $GUTTER
B-BITUMINOUS
of any temporary ditches or swales must complete within 14tl days after connecting to a surface
C - CONCRETE
water and construction in that portion of the ditch has temporarily or permanently ceased.
ct on in that m
19.
Temporary soil stockpiles must have silt fence or other effective sediment controls, and cannot be in
EO - EMERGENCY OVERFLOW
surface waters, including slornwaler conveyances such as curb and gutter systems, or conduits andnd ditches
hes
TW - TOP OF WALL
9. Pipe pullets mud be provided with energy dissipation within 24 hours of connection to surface water.
unless there Is a bypass in place for the stormwater.
BW - BOTTOM OF WALL (F/G)
(") - EXISTING TO BE VERIFIED
GRADING NOTES
_ - - - _ _ - - _ - _ - _ _ - _ - - _ \ Tree protection h consisting of snow fence or safety fence installed at the
------- - --- �- \--_- 1 work at
she. In place prior to beginning any grading or demolition
// ------------- ------------------_--_-�-\-----_- - work at the site.
i
ry --- -- -- ----_
ANDERSP�N -----------' -- `----------------
�� S------------------ 2. All elevations with an asterisk(') shall be field verified. If elevations
\ _OUT\CA ,ROAD , 5- -- ROCK CONSTRUCTION_-- vary significantly,
MP D z g1 rynotify the Engineer for further instructions.
9 _ _ f _ _ 916 ENTRANCE
975.93 B,- _ _ _ - - - 3. Grades shown in paved areas represent finish elevation.
-_-__ -
�� _ -------_ _ --� -� - _ -_ ---- 4 All disturbed areas to receive g quality topsoil and seed • "of pod weir b so'
1-976
__-----_--__ -- - = --_ -- 9. _ S. All construction shall be performed in accordance with slate and local
--- - - - --_-_ standardp iicahons for consWcbon.
_ _-_ _ _ _ __ -___ - __ _
- -- -- - - - --- - _ _ '
970 � aT
a e f
�74
_-_.975-____ COORDINATE GRADING IN
________________________ '.� _ COORDINATE GRADING IN __-_----______
______ - _-_-________________ _-___--_-_--__ _--_ _ mv�Q o-°_- ` _ _-_ROW WITH TOWN ____ - '
/ 1�� \ _--- - _ --- ROW WITH TOWN- ------__SILT FENCE -- __ _ -- ':`o °oao = --- _ _-_ ------------------
_/ - \\\\\\\ (lfl\ \_i \ \ r-�- r B_-- �tr° --- _ - ---- __-_� �_---------------------- i
- _---__---'-_----r.. _-SILT FENCE- ___ _975
VAA��V(// A\\\\\\1 I I I ---=c-=_-983-
\\ \ \l _% l --982 976.93B - __
IIII A\VA A 1�_ _ _ 98t' 977.10 B/ --------------980--_
zxr
LET PROTECTION, TYP- CB<2 _i / C---_--
V A . RIM: 9.]977 93%.93 985
{4 iNV:972509� 1LFV2" INV:971.33
�i
117 LF 75"HDPE @ 1.0%/ / RIAm9�
/ / / 1 A A V A \ V ].2 B`V ge. DPE@10% INV:�m OvA �A`vwvAAVA / '
SUP
77. RIM
SILT
978.50 SIC
�978.SOB
-��- �- vPROF3QSED BUIL ING // �y
\ wETguro�� 111 1 I�I \ \.\ 978.256 I\ 1 T \h -\ F __+I--- I �,+-- 7.ze - / / // s]o______
----APfR036�- SILT FENCE I F-_ ( / h� i \
v v v=97.50(ARCH1'00'--- -- ---�-- - / -
) �
\ I I 1 \ 978.50 B/C m - 1 OI / /
+--�\ 1 a 11
ud
1 1987
\ V A V A 1 I I I I INLET PROTECTION, I yi- t� 1V A 1 BASIN ACCESS 1 RIP ItAP - - � � � V A \_ S�H4(1f.8L%yew VA` 15"HDPEQIO%.� .. +..1 978.238 /� \ \ \\\ \ r \\ `15.5'WIDTH
I \ 978. 3g I I 1 977.93 RIM' \ \ BERM:9W /5 �_ 967 - .t-
A PE 1.0% V A A _
1 CB-C A V A 77 9 Tl. RIM / A A A `� ' \� _ �96] 'E SILT F NCE V AA
I \ \ \ \ ------
RIM: 97Q.93\ 1 / 978.23 B I CB-6 \ \ \ \ \ \ 1 \ _ - 966
INV( 97$77 1 1 I I �]. RIM -- � _ \ ] ` \ �€965
folk I V A / .984r=r--bmr ` V A
976 977 / I �_ 979 /IN\9➢9.50 BW �� / - /� _ ] 9 9-3� ' �0� A V A \ \V A
97i T F ��980 981 880, / \ SILT FENCE 980 959yNV-g 7-'•r- i \ \\ \\ \ \
.-hES�
1s)` L__V:99 0 J I
I(T( _7� / - I I I
\SILT FENCEI I I I I I I (i'\ .l--__ _ _-�.988.00TW. \ \ 11 l \ 980.50 TW ( I I I 11111 III\\ / .q6/ \ RIP RA.P
1 I 9]9.60 BW �989.00TW 1 V A 97950BW SILT FEtJG1El
\ /\-_---- \ \\ \ 979.50 BW \ s]s.5o ew
///
1 A
V `V A(// I // / I v �� �� �� `��__/�NORRH �\ _
/�--__ /(/ V A A V I I I / I
/� �/ // V 1V /
0 19 \I1301 so _.
P�i
P:\Projects\Projects-2023\12236114 - Somerset Stooge Garage\C. Design\Drawing Filas\122N114 C200- Gmding Plani
a
Q O N
v
00" 23�
wq�db -
y
L
V/ amma
mm no _ mm N m
y w
J W M do 3 a,
to
J
N
S
i U)
Q Z
Y �
<
U Ow
Z CNI Q
U LO
M J
a
l
V
J
U) E N
�LUUI
(.3
� a 0E
Q fin
QM
r
N
15
m
6
CID IV
LI IMTTXEWJ LI
O WOOOPUFF W C
4338a8 -
XVOSON W
''zjryr y4uuR1PN
Rev, Date Description
09.13.2023 CountyComments
Project k: 12236114.000
Drawn By: TJR
Checked By: EGM
Issue Date: 09.06.23
Sheet Title:
GRADING AND
EROSION CONTROL
PLAN
Sheet:
C200
PLANTING SCHEDULE
QTY
COMMON NAME
SIZE
CONTAINER
8
Eastern White Pine
61tall
B 8 B
8
Black Hills Spruce
61tall
B 8 B
;off
5
Quaking Aspen
2" Cal
B 8 B
Redmond Linden
2" Cal
B 8 B
LEGEND
EROSION CONTROL BLANKET
(WISDOT URBAN TYPE
STORMWATER NATIVE SEED
SEEM COMMERCIAL TURF GRASS SEED MIX
SEEM[ NATIVE ROADSIDE SEED MIX
LANDSCAPING NOTES
I. Landscape Contractor is responsible for coordination with other contractors to protect the new
improvements during landscape work activities. Report any damage immediately,
2. Plant size and species substitutions must be approved by the Engineer and Owner in writing prior to
installation.
3. Landscape Contractor is responsible for ongoing maintenance of all newly installed material until time of
owner acceptance. Any ads of vandalism or damage which may occur prior to owner acceptance shall be
the responsibility of the contractor. Contractor shall provide the owner with a maintenance program
including, but not limited to, pruning, fertilization and disease/pest control.
4. Landscape Contractor shall provide the owner with a watering schedule appropriate to the project site
conditions and W plant material growth requirements.
S. Landscape Contractor shall guarantee newly planted material through two (2) calendar years from the date
of written owner acceptance. Plants that exhibit more than 10 b die -back damage shall be replaced at no
additional cost to the owner. The contractor shall also provide adequate tree wrap and deer/rodent
protection measures for the plantings during the warranty period.
6. All trees shall have shredded hardwood mulch placed around the tree at 4' diameter and 6" deep.
7. Restore all disturbed turf areas with 4' of good quality topsoil and seed.
8. Topsoil shall not be placed in infiltration basin.
ANDERSEN SCOUT CAMP ROAD _ ----
-- —•—._
SEED2
SEED2
SEED2
SEED1
0
SEED2
SEED2
SEED2 ,
0
SEED2
0
NORTH
7i'll.iiii7iiiiiiiiiiiii'�
0 15 30 60
Cl o
O N
=c92 0 a
OIL of
Os.'�.. pt
L =nmd?Ln
a -
1 s E2 w
NUa e
J LU
O
J
W
LU LO
a. Q Z
Y �
UZQ
UM J
a
J
Q ~
CL
E N
aW��
UQ "E
U (� a fin
QM
15
F
0
Q
a
�,pv\SCONsivvyi
MPTi11i li i
a WOODRUFF ar
ZE 4MM-6 w EE
o HUDSON w EE
Rev. Data Desviption
09.13.2023 County Comments
Project #: 12236114.000
Drawn By: TJR
Checked By: EGM
Issue Date: 09.W.23
Shetntie:
LANDSCAPE PLAN
Sheet
C250
R1ProlectsTrojects-2023M238114- Somerset Storage Canal DesigMDr ing Files\12236114 C250- Landscape Plaadwg
UTILITY NOTES
SYMBOL LEGEND
1.
It is the responsibility of the contractor to perform or coordinate all necessary utility connections and
O
STORM MANHOLE
CTV
CABLE UNDERGROUND LINE
relocations from existing utility locations to the proposed building, as well as W all onsite amenities.
OE
ELECTRIC OVERHEAD LINE
These connections Include but are not limited to water, sanitary sewer, cable TV, telephone, gas,
O
CATCH BASIN
electric, site lighting, etc.
UE
ELECTRIC UNDERGROUND LINE
❑i
CURB INLET
FO
FIBER OPTIC UNDERGROUND LINE
2.
All service connections shall be performed in accordance with state and local standard
®
FLARED END
- GAS - GAS -
NATURAL GAS UNDERGROUND LINE
specifications for construction. Utility connections (sanitary sewer, watermain, and storm sewer)
SANITARY SEWER PIPE
may require a permit from the City.
O
SANITARVMANHOLE
»
STORM SEWER PIPE
3.
The contractor shall verify the elevations at proposed connections to existing utilities prior to any
HYDRANT
T T
TELEPHONE UNDERGROUND LINE
demolition or excavation.
-I-
WATERMAIN PIPE
N
GATE VALVE &BOX
-» DT-
DRAINTILE PIPE
4.
The contractorshall notify all appropriate engineering departments and utility companies 72 hours
prior to construction. All necessary precautions shall be made to avoid damage to existing utilities.
®
WATER SHUTOFF
5.
Stomr sewer requires testing in accordance with Wisconsin Plumbing Code requirements where
LIGHT POLE
located within 10 feet of waterlines or the building.
6.
HDPE storm sewer piping shall meet ASTM F2306 and fittings shall meet ASTM D3212 joint
pressure lest. Installation shall meet ASTM C2321.
T
Maintain a minimum of 7 %' of cover over all water lines and sanitary sewer lines. Where 7 %' of
cover is not provided, install 2" rigid polystyrene insulation with a thermal resistance of at least 5
and a compressive strength of at least 25 psi. Insulation shall be 8' wide, centered over pipe with
6" sand cushion between pipe and insulation. Where depth is less than 5', use 4" of insulation.
8.
Install water lines 12" above sewers. Where the sewer is less than 12" below the water line (or
above), install sewer piping of materials approved for Inside building use for 10 feet on each side of
the crossing.
9.
All watermain piping shall be C900 PVC.
10.
See Project Specifications for bedding requirements.
11.
Pressure lest and disinfect all new watermain in accordance with state and local requirements.
12,
Sanitary sewer piping shall be PVC SCH 40.
ANDERSEN SCOUT CAMP ROAD _
RIM: 977.93
INV: 973.67
CONNECTION WITH
WRIM: 977.93
:
117 LF 12" HOPE @ 1.0% INV972.50
I I I
I I I I
__4----i---
�COORD. W/MECH.
INV: 972.25
4" PVC SCH 40 @ 1,04% (MIN)
117 LF
RIM: 977.93WRIM: 977.93
INV: 974.93.93 INV: 973.7777
RIM: 977.93
INV: 971.33
117 LF 15"
15"
i
I I I
I I I I I
PROPOSED BUILDING
FFE=978.50(ARCH1;00') I_-_~-- ---i ----- -_
I i I
I I I I
DE@1.0%. -.. -.. -.. -.. -.. -.. _..
4 CB-6
RIM: 977.93
INV: Q79 an
a CB6 f
a0 RIM: 977.93
INV 971 43
RIM RIM: R9]7.93 G
INV: 970,16
SUMP: 966.16
LF 4" PVC
VERIFY WELL /
LOCATION WITH
WELL DESIGNER t
/
FES
�.
INV: 964.00
\
FES
�
INV: 962.00
\----13
LF 15"HDPE@-7.69%--
`
OUTLET CONTROL STRUCTURE J
`CY
RIM: 966.00
TOP WEIR: 965.70
8' ORIFICE: 963.00
W ORIFICE: 962,00
INV: 962,00
BTM: 961.00
FES-
0 INV: 961.00
\
\
I \\
FES \ \
INV: 980.00 N,
)
)
J-- 54 LF 6" PVC (SCH 40) @ 1.84
-23LF15((('HDPE@4.4% \
l RAWDOWN ]®
t \
LVE
FES 40
.vyyINV: 959.00 � W_
0
I�r NORTH
0 15 30 60
s
WOO
WOOD
=C9Z�8 a
O"L 0 0
d 6O C
(AN J � IF
C n00O 0
" m SO�IS
e w`
Jw�m��
�i rp g
co
J
N
0
U)
Q Z
Y �
U oQ
U DO _J
U
J
Q ~
E N
aWU�
U��'�
C N
�Q�E
U aE
Q fn
M
N
QP
m
a
S G O Ng ttk
Wi ys by°s
4i W, WOODRUFF
Lf
oomuar _
OUw =
5 SpauDSO
Is w e
'xxx7//7IIIAil-
it it11PN
Rev. Date Desmiplion
09.13.2023 CountyComments
Project #. 12236114.000
Drawn By: TJR
Checked By: EGM
Issue Data: 09.06.23
Sheet Tire:
UTILITY PLAN
Sheet:
C300
P:\Projects\Projects - 2023\12236114 - Somerset Stooge Garage\C. Design\Drawing Files\12236114 C300 - Utildy Plao.dwg
NEW 4.5' BITUMINOUS PAVEMENT
PLACED IN 2 EQUAL LIFTS
ar4-_ar4 ar4--ar4 114--ar4--ar4--ar4--ar4-_•
i 1�• I�i 1�• I�i 1�• 1�• 1�• 1�• 1�• 1
NEW 8" BASE
AGGREGATE
APPROVED SUBGRADE SOIL
HEAVY-DUTY BITUMINOUS
PAVEMENT SECTION
C400 NOT TO SCALE
SLOPE
N
#4 EPDXY COATED
REBAR (3 TYR)
3"
6" MIN NEW BASE
AGGREGATE
CONCRETE VALLEY GUTTER
2 WITH BITUMINOUS APRON
C400 NOT TO SCALE
TW (SEE GRADING
LARGE BLOCK
RETAINING WALL
(DESIGN PER
MANUFACTURER)
BW (SEE GRADING PLAN)
MR
TOPSOIL
RETAINING WALL BASE, DRAINTILE,
AND AGGREGATE BACKFILL PER
MANUFACTURER'S RECOMMENDATION.
NOTES:
1. Retaining wall detail is schematic in nature. Manufacturer to provide engineered
drawings, details, and Installation instructions.
s RETAINING WALL DETAIL
C400 NOT TO SCALE
PRECAST INVERT SHOULD BE 1/2
DIAMETER OF PIPE AND BENCHES
SLOPED 2"TOWARD INVERT.
MANHOLE STEPS $HALL BE PLACED
SO THAT OFFSET HOLE IN TOP SLAB
\ IS FACING DOWNSTREAM.
l` NO BLOCK STRUCTURES ARE ALLOWED
GRADE 1" BELOW 10' TRANSITION.
I' E FRAME &COVER:
NEENAH
NEENAH R TYPE C GRATE (CB, ROUND OPEN GRATE)
`UNLESS OTHERWISE NOTED
PLAN
MINIMUM OF 2, MAXIMUM OF 5
CONCRETE ADJUSTMENT RINGS WITH FULL
VARIABLE
BED OF MORTAR BETWEEN EACH AND
A4'COLLAR ON THE OUTSIDE. NO SHIMS
OF ANY MATERIAL ALLOWED.
INSTALL NEW EXTERNAL CHIMNEY SEAL.
6' PRECAST REINFORCED CONCRETE SLAB.
`SEAL WITH 2 BEADS OF RAM-NEK.
ALL JOINTS IN MANHOLE TO HAVE
'Or RING RUBBER GASKETS.
-MANHOLE STEPS, COPOLYMER POLYPROPYLENE
PLASTIC, WITH 1/2' GRADE 60 STEEL
REINFORCEMENT OR EQUAL, 16" O.C.
— PRECAST CONCRETE SECTION
8' PRECAST SEGMENTAL CONCRETE BLOCK
TO TOP OF THE PIPE SHALL BE USED
WITH SIZE AND DEPTH PROHIBIT THE
FABRICATION OF PRECAST UNITS.
8" MINIMUM SLAB THICKNESS,
6' MINIMUM DIAMETER PRECAST
CONCRETE SLAB, REINFORCED
WITH it4 REBAR @ 8' E.W.
tGROUT BOTTOM
SECTION WATERTIGHT CONNECTION
(BOOT/GROUT RING, TYPICAL)
CATCH BASIN
C40�a MANHOLE DETAIL
NOT TO SCALE
%' SMOOTH BAR @
2' O.C. EACH WAY
6"MAX
I
PROVIDE 3 CLIPS TO FASTEN TRASH GUARD TO F.E.S.
HOT DIP GALVANIZE AFTER FABRICATION.
FLARED END
e SECTION DETAIL
C400 NOT TO SCALE
TOP WEIR: 965.70
INV: 963.00
INV: 962.00
INV: 961.00
ELEV.=
PIPE SHALL BE CUT OUT FLUSH
WITH INSIDE FACE OF WALL.
WATERTIGHT CONNECTION
(BOOT/GROUT RING, TYPICAL)
WEIR WALL DETAIL
(NOT TO SCALE)
ELEV. = 965.70 1=
•� s
HOPE
0 ORIFICE
,E
HINGED 4W ID GALV. STEEL GRATE
(HAALA INDUSTRIES ITEM #PS48-58SWH
OR APPROVED EQUAL)
PRECAST CONCRETE SECTION
ALL JOINTS IN MANHOLE TO HAVE
'O' RING RUBBER GASKETS.
r MANHOLE STEPS, COPOLYMER POLYPROPYLENE
PLASTIC, WITH 1/2" GRADE 60 STEEL
REINFORCEMENT OR EQUAL, 16" O.C.
ORIFICES, SEE WEIR DETAIL
PIPE SHALL BE CUT OUT FLUSH
WITH INSIDE FACE OF WALL.
WATERTIGHT CONNECTION
4HDPE1
BOOT/GROUT RING, TYPICAL)
15"
MINIMUM SLAB THICKNESS
ELEV. = 961.00 IS 6' FOR 14' DEPTH. INCREASE
THICKNESS 1' FOR EVERY
"!''.'•<. 4'OF DEPTH GREATER
THAN 14', AND REINFORCE
SECTION WITH #4 REBAR @ 8" E.W.
OUTLET CONTROL
is1 STRUCTURE DETAIL
C400 NOT TO SCALE
NOl
FOP
:CAP
VE
)E
OD
ISER
PVC GATE VALVE
PIPING
iE AGGREGATE
DRAWDOWN SUPPORT oen
7 VALVE DETAIL
C400 NOT TO SCALE
O N
r ' B
0 a
0� 0
DY`. DI
/A�NJNC
J w
UU
W
j t
Q Z
UZQ
M J
a
u
J
) E N `•
CL 0 to
W M
UU§
U
;n
m
ua mE
U(��D)
QM
N
r
G
Q
a
Nsi���i
N MPTfHE J %
WOODRUFF rc
4MWe —
o HUDWN
Rev. Date Deamption
09.13.2023 C unty Comments
Project #: 12236114.000
Drawn By: TJR
Checked By: EGM
Issue Date: 09.06.23
Sheet Tiue:
DETAILS
Sheer
C400
P:\ProjecislProjecLs-2023\12236114- Somerset Storage Garage\C. DesignTn tng Files\12236114 C400-Detallsdwg
J
awl
2 BASKETS WITH 400 MICRON FILTER
400 MICRON FILTER
BAGS. TO BE CHECKED PERIODICALLY AND
BAG IN EACH BASKET
CLEANED OUT AFTER EACH RAIN EVENT
}T
FITS NEENAH AND
FITS
Z
OR
FRAMES OR EQUAL
E
a
O
EN FILTER
21C
8s
.<
(ELEVATION -SEE PLAN)
P
CLASS III
`•,_� •���.>�.>• •,;/All RIP -RAP
FABRIC
NOTE:
FW300 MIRAFI FABRIC OR EQUAL
RIP -RAP AT OUTLETS
C401 NOT TO SCALE
Ys' 05J�� OPO
C'
2J0V
MIN. 6" OF 1"TO
2" DIA ROCK
GEOTEMILE FABRIC BENEATH ROCK J ryO 0\d
VARIES:
FULL WIDTH OF EXISTING
18" MIN. HIGH CUT-OFF BERM TO DRIVEWAY OPENING OR
MINIMIZE SILT RUNOFF FROM SITE 20' MIN. WIDTH.
z ROCK CONSTRUCTION ENTRANCE
C401 NOT TO SCALE
WIRE MESH REINFORCEMENT
(HIGH FLOW AREAS)
ENGINEERING FABRIC
METAL, WOOD POST, OR STAKE. —
8' MAX. SPACING, 2' INTO GROUND
FABRIC ANCHORAGE
TRENCH. BACKFILL WITH
TAMPED NATURAL SOIL
DIRECTION
NATURAL SOIL
NOTE: DEPENDING UPON CONFIGURATION, ATTACH FABRIC TO WIRE MESH
WITH HOG RINGS, STEEL POSTS WITH WIRES, OR WOOD POSTS WITH STAPLES.
SILT FENCE
INSTALLATION DETAIL
C401 NOT TO SCALE
RTrojectssTrojecLs - 2023\12236114 - Somerset Storage Gamge%C. DesigMDmwing Files%12236114 (SIM - Detalls.tlwg
PROFILE
INFRASAFE INLET
PROTECTION DEVICE (OR EQ.) Q
C401
MODIFY EXISTING SOILS FOR COMPACTION
MITIGATION. BLEND 2- OF COMPOST (WDNR
S100) INTO UPPER 2" OF SOIL.
EXISTING
SLOPE
1 P PLAN
liyi/4rr.... 1
VARIES
(PER PLAN)
SEED MIX
SI.OPEPMp,Xa
l3�
BLANKET
ON SIDESLOPES
�- EXTEND MODIFIED SOIL UP SLOPES
TO POND OUTLET ELEVATION
EXCAVATE POND BOTTOM TO EXISTING PERMEABLE
SOILS. REMOVE AND DISPOSE OF EXISTING TOPSOIL
AND ANY SOILS NON -CONDUCIVE TO INFILTRATION.
SEE GEOTECH REPORT.
LOOSEN/DECOMPACT SOIL BELOW
BASIN BOTTOM, 12' MINIMUM DEPTH.
NOTES:
1. THE EXISTING SOILS SHALL BE PROTECTED FROM COMPACTION DUE TO CONSTRUCTION TRAFFIC.
AREAS SHALL BE STAKED AND MARKED OFF, WITH ONLY LOW IMPACT EQUIPMENT (TRACKED OR
SIMILAR) ALLOWED.
2. CONTRACTOR TO PERFORM TWO(2)TEST PIT$FOR SOIL VERIFICATION PER WDNR TECHNICAL
STANDARD 1002,
INFILTRATION BASIN
e CROSS SECTION
C4O1 NOT TO SCALE
PLAN
SECTION A -A CL. II RIP
PLACE RIP RAP ON
61NCHES OF ROCK
BEDDING (2" MINUS)
PER (ER .SEEPLAN PLAN)
of
PLAN PERP AN
MOUND LAST2 FEET
L
12" HIGH
>P
GTEXTILE
OFRIC
EXTEND FABRIC 1 FOOT
BEYOND RIP RAP
SECTION B-B
EMERGENCY OVERFLOW
s SPILLWAY DETAIL
C401 NOT TO SCALE
O N
C ' B
0 a
0.0 n
DY p
/A r M
C a°m°'L°n
�V •�v�� c
C N L
Jw��� 9
uu
W
jLLn
Q Z
<
UZa
C) M J
a
J
U) E N
CW0N
U U�
U)
C N
a) 0)
�a �E
(a)
DO
M
N
Ti
Q
a
\SGONsi��ai
y� yAri
N MPTfHEWJ %
w DFUJrr a
4339643 —
o HUDSON
Rev. Dale Desorption
09.13.2023 CountyComments
Project #: 12236114.000
Drawn By: TJR
Checked By: EGM
Issue Date: 09.M.23
Sheet Title:
DETAILS
Sheep
C401
3d view for Randazzo
16
BUILDING RENDERING I BUILDING SECTION
NOT TO SCALE \ / NOT TO SCALE
PAProjeetslProjectts - 2023M236114 - Somerset Storage Garage%C. DesignTmWng Files%12236114 X1 -Building Exhlbr.dwg
O N
C '
B
rCa�00
a
0� . o
DY p
ca
c
L =am
ce
�
C
C N L
Jw���
9
o
J
Q Do
~>to
a z
Y �
UZQ
M J
C.
a
U
J
U) E N
CL to
UCD U§
U)
U Q
a E
U (9
QM
N
15
Q
a
\SGONsi���i
N M HlE0fJ ti
�DRJFF tic
assess
o oSON
is.
Its
Rev. Date Deamption
09.13.2023 C unty Comments
Project #: 12236114.000
Drawn By: TJR
Checked By: EGM
Issue Date: 09.06.23
Sheet Tire:
BUILDING EXHIBIT
Sheet
X1
JACC CAPITAL GARAGES
STORMWATER CALCULATIONS
m
LARSON ENGINEERING
SEPTEMBER 13, 2023
CONTENTS:
1. Stormwaler Runoff Summary
2. Existing Drainage Map
3. HydroCAD Report for Existing Conditions
(1-yr, 2-yr, 10-yr and 100-yr events)
4. Proposed Drainage Map
5. HydroCAD Report for Proposed Conditions
(1-yg 2-yg 10-yr and 100-yr events)
6. P8 Results - Existing
7. P8 Results - Proposetl
JACC Capital Garages
SUMMARY OF STORMWATER RUNOFF
Introduction:
The project will consist of the construction of a new storage unit building, driveway,
and stormwater basin. The building will consist of 28 garage units, each with water
and sewer services, served by new on -site well and septic systems.
Stonnwater calculations were modeled using HydroCAD with Atlas 14 24-hour rainfall
data.
Existing Conditions:
The existing conditions were modeled as a combination of Meadow, Woods, and
Wetland, Type C soils, with Curve Numbers of 71, 70, and 100, respectively. There
are no existing impervious areas.
The west side of the site drains to the west and into an existing welland. The east side
of the site drains to the southeast corner of the site and continues offsite.
Proposed Conditions:
Runoff from the impervious surfaces will be routed to a proposed infiltration basin that
is located in the southeast corner of the site.
The proposed conditions were modeled as a combination of > 75 % Grass Cover,
Woods, and Wetland, Type C soils, with Curve Numbers of 74, 70, and 100,
respectively. Impervious areas were modeled with a Curve Number of 98.
Stormwaler Runoff Rate
Per Wisconsin DNR requirements, proposed runoff rates shall not exceed existing
runoff rates for the 2-yr 24-hour critical storm event. The runoff rates for the 1-yr, 10-
yr, and 100-yr, 24-hour critical storm events are included for sizing of pipes and
stonnwater BMP's. The existing and proposed peak runoff rates leaving the site are
listed in the table below.
Existing peak mnoff rates (in cubic feet per second):
Area
1- ear
2- ear
10- ear
100- ear
To Wetland
2.76
3.66
7.33
16.34
Offsite Southeast
1.03
1.55
3.77
9.43
Proposed peak runoff rates (in cubic feet oar second):
Area
1- ear
2- ear
10- ear
100- ear
To Wetland
1.99
2.49
4.49
9.23
Offsite Southeast
0.84
1.46
2.86
8.85
Stormwater Quality
Per Wisconsin DNR, new projects must reduce the total suspended solids (TSS) load
from the impervious areas by 80%, based on an average annual rainfall. An infiltration
basin will be utilized to remove TSS from the runoff. P8 Urban Catchment Model was
used to calculate TSS. In addition, St. Croix County requires that total phosphorous
(TP) loading be reduced by 60%.
New Impervious Area = 65,205 SF
Infiltration Provided = 3,887 CIF
TSS Reduction = 96.2%> 80 % (OK)
TP Reduction = 88.2%> 60% (OK)
The proposed infiltration volume is sufficient to satisfy the requirement.
Pre -Treatment:
Pre-treatment will be addressed by directing runoff into a sump catch basin prior to
discharging into the proposed infiltration basin. A sump will be implemented in the
upstream catch basin to the proposed infiltration basin.
Weiland Impacts
There is a wetland on the west side of the property, but no wetland impacts are
anticipated as a result of this project.
Infiltration Performance Standard
Per Wisconsin Standard NR 151.124(1)(b), the site shall "infiltrate sufficient runoff
volume so that the post -development infiltration volume shall be at least 75 percent of
the pre -development infiltration volume, based on an average annual rainfall.
However, when designing appropriate infiltration systems to meet this requirement, no
more than 2 percent of the postconstruction site is required as an effective infiltration
area"
An existing and proposed P8 model were utilized to determine the volume of runoff
that is infiltrated in each scenario. Since the existing site does not have any infiltration
BMP's or low areas, there is no infiltration volume.
Existing Infiltration Volume = 0.0 acre-ft
Proposed Infiltration Volume = 15.33 acre-ff
Total Construction Site Area = 172,881 SF
Effective Infiltration Area = 7,252 SF = 4.2%
Emergency Spillway Sizing Calculations
The emergency spillway must be designed per WI Technical Standard 1003. The top
of embankment shall be a minimum of 1-foot above the depth of the spillway.
100-yr HWL = 966.17'
ad; Qa
Invert of Spillway = 966.20'
Top of Embankment = 967.75'
Allowable depth of spillway = (967.75'— 1')-966.20 = 0.55'
Q = CLH"
where
Q = 100-yr discharge rate = 20.57 cfs
L = weir length [ft]
H = head depth
C = coefficient of discharge = 3.27 + 0.4H/h = 3.27 + 0.4(0.55/6) = 3.31
h = depth above channel bottom = 6 ft
L = Q/CH"
L = 20.57 cfs / (3.31)(0.55ff = 15.24 ft
The minimum width of the spillway to maintain a maximum overflow depth of 0.55 ft is
15.24 feet. The spillway will be designed with a width of 15.5 ft.
1R OA
To Wetland
S4 RaecM1 on Llflk
OB 2R
Offshe Southeast
Somerset Storage - Existing
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD®10.20-2f sin 01934 ® 2022 HvdroCAD Software Solutions LLC Pads 2
Rainfall Events Listing
EvenW
Event
Storm Type
Curve
Mode
Duration
BIB
Depth
AMC
Name
(hours)
(inches)
1
1-Year
MSE 24-hr
3
Default
24.00
1
2.48
2
2
2-Year
MSE 24-hr
3
Default
24.00
1
2.82
2
3
10-Year
MSE 24-hr
3
Default
24.00
1
4.12
2
4
100-Year
MSE 24hr
3
Default
24.00
1
6.89
2
Somerset Storage - E fisting
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCADO 10.20-2f sin 0193 ® 2022 HydroCAD Software Solutions LLC Peas 3
Area Listing (all nodes)
Area
CN
Description
(sq-a)
(subcatchmenl-numbers)
100,363
Ti
Meadow, non -grazed, HSG C (A, B)
15,915
100
Wetland (A)
56,622
70
Woods, Good, HSG C (A, B)
172,880
73
TOTAL AREA
Somerset Storage - Edsting MSE 24-hr 3 1-Year Rainfall=2.46"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCADO 10.20-2f sin 01934 ® 2022 HvdroCAD Software Solutions LLC Pace 4
Time span=0.00-240.00 hm, dt=0.01 Inns, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Split PerviousAmperv.
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment A: Runoff Area=98,429 sf 16.17% Impervious Runoff Depth=01T
Flow Length=289' Tc=6.3 min CN=71/100 Runoff=2.76 cfs 6,504 cf
Subcatchment 6: Runoff Area=74,451 sf 0.00% Impervious Runoff Depth=0.47"
Flow Length=465' Tc=10.6 min CN=71/0 Runoff=1.03 cfs 2.924 d
Reach 1R: To Wetland
Inflow=2.76 cfs 6,504 cf
Outflow=2 76 cfs 6,504 cf
Reach 2R: Offshe Southeast Inflow=1.03cfs 2,924cf
Oufflow=1.03 cfs 2,924 cf
Total Runoff Area=172,880 sf Runoff Volume = 9,428 cf Average Runoff Depth = 0.65"
90.79%Pervious=156,965sf 9.21%Impervious=15,9150
Somerset Storage - Edsting MSE 24-hr 3 1-Year Rainfall=2.46"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCAD®10.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Pace 5
Summary for Subcatchmerd A:
Runoff = 2.76 ds @ 12.14 hrs, Volume= 6,504 of, Depth= 0.79"
Routed to Reach 1 R : To Wetland
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 has, dt= 0.01 has
MSE 24-hr 3 1-Year Rainfall=2.46"
Area (sf) CN Description
53.725 71 Meadow, non -grazed, HSG C
28,789 70 Woods, Good, HSG C
15,915 100 Wetland
Area
5 100
To Length Slope Velocity Capacity Description
Range n=0.130 P2=2.81"
1.0 116 0.0840 2.03 Shallow Concentrated Flow,
Short Grass Pasture Kv=7.0 fps
0.5 73 0.2360 2.43 Shallow Concentrated Flow,
6.3 289 Total
Somerset Storage - Edsting MSE 24-hr 3 1-Year Rainfall=2.46"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCA0010.20-2f sin 01934 ® 2022 HydroCAD Software Solutions LLC Pace 6
Summary for Subcatchment B:
Runoff = 1.03 ds @ 12.20 hrs, Volume= 2,924 cf, Depth= 0.47"
Routed to Reach 2R : Offsile Southeast
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 hrs, dt= 0.01 has
MSE 24-hr 3 1-Year Rainfall=2.46"
Area (sf) CN Description
46.618 71 Meadow, non -grazed, HISS C
71
To Length Slope Velocity Capacity Description
Range n= 0.130 P2= 2.81"
2.2 229 0.0590 1.70 Shallow Concentrated Flow,
Short Grass Pasture Kv=7.0 fps
1.3 136 0.1140 1.69 Shallow Concentrated Flow,
10.6 465 Total
Somerset Storage - Existing MSE 24-hr 3 1-Year Rainfall=2.46"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD010.20-2f sin 01934 02022 HVdroCAD Software Solutions LLC Page 7
Summary for Reach 1R: 7o Wetland
Inflow Area 98,429 sf, 16.17%Impervious, Inflow Depth= 0.79" for 1-Year event
Inflow = 2.76 cfs @ 12.14 hrs, Volume= 6,504 of
Outflow = 2.76 cis @ 12.14 hrs, Volume= 6,504 of, Aaen= 0%, Lag= 0.0 min
Routing by Dyn-Slor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Somerset Storage - Existing MSE 24-hr 3 1-Year Rainfall=2.46"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HVEroCADO 10.20-2f sin 01934 92022 HVdroCAD Software Solutions LLC Peas 8
Summary for Reach 2R: Offsite Southeast
Inflow Area = 74,451 sf, 0.00 Impervious, Inflow Depth = 0.4T for 1-Year event
Inflow = 1.03 cfs @ 12.20 hrs, Volume= 2,924 of
Outflow = 1.03 cis @ 12.20 hrs, Volume= 2,924 of, Aden= 0 , Lag= 0.0 min
Routing by Dyn-Slor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Somerset Storage - Existing MSE24-hr3 2-Year Rainfall=2.82"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCADO 10.20-2f sin 01934 ® 2022 HvdroCAD Software Solutions LLC Pace 9
Time span=0.00-240.00 hm, dt=0.01 hrs, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/lmperv.
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment A: Runoff Area=98,4290 16.17%Impervious Runoff Depth=1.01
Flow Length=289' Tc=6.3 min CN=71/100 Runoff=3.66 cfs 8,272 cf
Subcatchment 6: Runoff Area=74,451 sf 0.00% Impervious Runoff Depth=0.66"
Flow Length=465' Tc=10.6 min CN=71/0 Runoff=1.55 cfs 4,089 cf
Reach 1R: To Wetland
Inflow=3.66 cfs 8,272 cf
Oufflow=3.66 cfs 8,272d
Reach 2R: Offsbe Southeast Inflow=1.55 ds 4,089 cf
Oufflow=1.55 ds 4,089d
Total Runoff Area = 172,880 sf Runoff Volume = 12,361 cf Average Runoff Depth= 0.86"
90.79% Pervious = 156,965 sf 9.21% Impervious = 15,915 sf
Somerset Storage - Existing MSE24-hr3 2-Year Rainfall=2.82"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCAD®10.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Pace 10
Summary for Subcatchmerd A:
Runoff = 3.66 ds @ 12.14 hrs, Volume= 8,272 cf, Depth= 1.01"
Routed to Reach 1 R : To Wetland
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 has, dt= 0.01 has
MSE24-hr3 2-Year Rainfall=2.82"
Area (sf) CN Description
53.725 71 Meadow, non -grazed, HSG C
28,789 70 Woods, Good, HSG C
15,915 100 Wetland
Area
5 100
To Length Slope Velocity Capacity Description
Range n=0.130 P2=2.81"
1.0 116 0.0840 2.03 Shallow Concentrated Flow,
Short Grass Pasture Kv=7.0 fps
0.5 73 0.2360 2.43 Shallow Concentrated Flow,
6.3 289 Total
Somerset Storage - Existing MSE24-hr3 2-Year Rainfafl=2.82"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCA0010.20-2f sin 01934 ® 2022 HydroCAD Software Solutions LLC Pace 11
Summary for Subcatchment B:
Runoff = 1.55 ds @ 12.20 hrs, Volume= 4,089 of, Depth= 0.66"
Routed to Reach 2R : Offsile Southeast
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 his, dt= 0.01 has
MSE24-hr3 2-Year Rainfall=2.82'
Area (sf) CN Description
46.618 71 Meadow, non -grazed, HSG C
71
To Length Slope Velocity Capacity Description
Range n= 0.130 P2= 2.81"
2.2 229 0.0590 1.70 Shallow Concentrated Flow,
Short Grass Pasture Kv=7.0 fps
1.3 136 0.1140 1.69 Shallow Concentrated Flow,
10.6 465 Total
Somerset Storage - Existing MSE24-hr3 2-Year Rainfall=2.82"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD010.20-2f s/n 01934 02022 HVdroCAD Software Solutions LLC Peas 12
Summary for Reach 1R: To Wetland
Inflow Area 98,429 sf, 16.17%Impervious, Inflow Depth= 1.01" for 2-Year event
Inflow = 3.66 cfs @ 12.14 hrs, Volume= 8,272 of
Outflow = 3.66 cis @ 12.14 hrs, Volume= 8,272 of, Aaen= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Somerset Storage - Existing MSE24-hr3 2-Year Rainfall=2.82"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HVEroCADO 10.20-2f sin 01934 92022 HVdroCAD Software Solutions LLC Peas 13
Summary for Reach 2R: Offsite Southeast
Inflow Area = 74,451 sf, 0.00 Impervious, Inflow Depth = 0.66" for 2-Year event
Inflow = 1.55 cfs @ 12.20 hrs, Volume= 4,089 of
Outflow = 1.55 cfs @ 12.20 hrs, Volume= 4,089 of, Aden= 0 , Lag= 0.0 min
Routing by Dyn-Slor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Somerset Storage - Existing MSE24-hr3 10-Year Rainfall=4.12"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD®10.20-2f sin 01934 ® 2022 HvdroCAD Software Solutions LLC Pace 14
Time span=0.00-240.00 hm, dt=0.01 hrs, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv.
Reach routing by Dyn-Slor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment A: Runoff Area=98,4290 16.17%Impervious Runoff Depth=1.W
Flow Length=289' Tc=6.3 min CN=71/100 Runoff=7.33 cfs 15,619 d
Subcatchment 6: Runoff Area=74,451 sf 0.00%Impervious Runoff Depth=1AW
Flow Length=465' Tc=10.6 min CN=71/0 Runoff=3.77 cfs 9,163 d
Reach IR: To Wetland
Inflow=7.33 cfs 15,619 d
Outflow=7.33 cfs 15,619d
Reach 2R: Offsbe Southeast Inffow=3.77 cfs 9,163d
Oufflow=3.77 ds 9,163d
Total Runoff Area = 172,880 sf Runoff Volume = 24,782 cf Average Runoff Depth =1.72"
90.79% Pervious = 156,965 sf 9.21% Impervious = 15,915 sf
Somerset Storage - Existing MSE24-hr3 10-Year Rainfall=4.12"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCAD®10.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Pace 15
Summary for Subcatchmerd A:
Runoff = 7.33 ds @ 12.14 hrs, Volume= 15,619 of, Depth= 1.90"
Routed to Reach 1 R : To Wetland
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 has, dt= 0.01 has
MSE 24-hr 3 10-Year Rainfall=4.12"
Area (sf) CN Description
53.725 71 Meadow, non -grazed, HSG C
28,789 70 Woods, Good, HSG C
15,915 100 Wetland
Area
5 100
To Length Slope Velocity Capacity Description
Range n=0.130 P2=2.81"
1.0 116 0.0840 2.03 Shallow Concentrated Flow,
Short Grass Pasture Kv=7.0 fps
0.5 73 0.2360 2.43 Shallow Concentrated Flow,
6.3 289 Total
Somerset Storage - Existing MSE24-hr3 10-Year Rainfall=4.12"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCADO 10.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Pace 16
Summary for Subcatchment B:
Runoff = 3.77 ds @ 12.19 hrs, Volume= 9,163 of, Depth= 1.48"
Routed to Reach 2R : Offsile Southeast
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 his, dt= 0.01 has
MSE 24-hr 3 10-Year Rainfall=4.12"
Area (sf) CN Description
46.618 71 Meadow, non -grazed, HSG C
71
To Length Slope Velocity Capacity Description
Range n= 0.130 P2= 2.81"
2.2 229 0.0590 1.70 Shallow Concentrated Flow,
Short Grass Pasture Kv=7.0 fps
1.3 136 0.1140 1.69 Shallow Concentrated Flow,
10.6 465 Total
Somerset Storage - Existing MSE24-hr3 10-Year Rainfa11=4.12"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCAD010.20-2f sin 01934 02022 HvdroCAD Software Solutions LLC Peas 17
Summary for Reach 1R: To Wetland
Inflow Area 98,429 sf, 16.17%Impervious, Inflow Depth= 1.90" for 10-Year event
Inflow = 7.33 cfs @ 12.14 hrs, Volume= 15,619 cf
Outflow = 7.33 cis @ 12.14 hrs, Volume= 15,619 cf, Aaen= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Somerset Storage - Existing MSE24-hr3 10-Year Rainfall=4.12"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCADO 10.20-2f sin 01934 92022 HvdroCAD Software Solutions LLC Peas 18
Summary for Reach 2R: Offsite Southeast
Inflow Area 74,451 sf, 0.00 Impervious, Inflow Depth= 1.48" for 10-Year event
Inflow = 3.77 cfs @ 12.19 hrs, Volume= 9,163 of
Outflow = 3.77 cfs @ 12.19 hrs, Volume= 9,163 of, Aden= 0 , Lag= 0.0 min
Routing by Dyn-Slor-Ind method, Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
Somerset Storage - Existing MSE 24-hr 3 100-Year Rainfalf=6.89"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD010.20-2f sm 01934 02022 HvdroCAD Software Solutions LLC Pace 19
Time span=0.00-240.00 hm, dt=0.01 hrs, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv.
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment A: Runoff Area=98,429 sf 16.17%Impervious Runoff Depth=4.W
Flow Length=289' Tc=6.3 min CN=71/100 Runoff=16.M cfs 34,105 cf
Subcatchment 6: Runoff Area=74,451 sf 0.00% Impervious Runoff Depth=3.13Y
Flow Length=465' Tc=10.6 min CN=71/0 Runoff=9.43 cfs 22,528 cf
Reach 1R: To Wetland
Inflow=16.34 cfs 34,105 cf
Outflow=16.34 cfs 34,105 cf
Reach 2R: Offsbe Southeast Inflow=9.43 cfs 22,528 cf
Outflow=9.43 cfs 22,528 cf
Total Runoff Area =172,880 sf Runoff Volume = 56,633 cf Average Runoff Depth =3.93"
90.79%Pervious=156,965sf 9.21%Impervious=15,915sf
Somerset Storage - Existing MSE 24-hr 3 100-Year Rainfall=6.89"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCA0010.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Pace 20
Summary for Subcatchmerd A:
Runoff = 16.34 ds @ 12.14 hrs, Volume= 34,105 of, Depth= 4.16"
Routed to Reach 1 R : To Wetland
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 has, dt= 0.01 has
MSE 24-hr 3 100-Year Rainfall=6.89"
Area (sf) CN Description
53.725 71 Meadow, non -grazed, HSG C
28,789 70 Woods, Good, HSG C
15,915 100 Wetland
Area
5 100
To Length Slope Velocity Capacity Description
Range n=0.130 P2=2.81"
1.0 116 0.0840 2.03 Shallow Concentrated Flow,
Short Grass Pasture Kv=7.0 fps
0.5 73 0.2360 2.43 Shallow Concentrated Flow,
6.3 289 Total
Somerset Storage - Existing MSE 24-hr 3 100-Year Rainfalf=6.89"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCADO 10.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Pace 21
Summary for Subcatchment B:
Runoff = 9.43 ds @ 12.19 hrs, Volume= 22,528 cf, Depth= 3.63"
Routed to Reach 2R : Offsile Southeast
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 hrs, dt= 0.01 has
MSE 24-hr 3 100-Year Rainfall=6.89"
Area (sf) CN Description
46.618 71 Meadow, non -grazed, HSG C
71
To Length Slope Velocity Capacity Description
Range n= 0.130 P2= 2.81"
2.2 229 0.0590 1.70 Shallow Concentrated Flow,
Short Grass Pasture Kv=7.0 fps
1.3 136 0.1140 1.69 Shallow Concentrated Flow,
10.6 465 Total
Somerset Storage - Existing MSE 24-hr 3 100-Year Rainfall=6.89"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD010.20-2f sin 01934 02022 HVdroCAD Software Solutions LLC Peas 22
Summary for Reach 1R: To Wetland
Inflow Area 98,429 sf, 16.17% Impervious, Inflow Depth= 4.16" for 100-Year event
Inflow = 16.34 cfs @ 12.14 hrs, Volume= 34,105 of
Outflow = 16.34 cis @ 12.14 hrs, Volume= 34,105 of, Aaen= 0 , Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Somerset Storage - Existing MSE 24-hr 3 100-Year Rainfall=6.89"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCADO 10.20-2f sin 01934 92022 HVdroCAD Software Solutions LLC Peas 23
Summary for Reach 2R: Offsite Southeast
Inflow Area 74,451 sf, 0.00 Impervious, Inflow Depth= 3.63" for 100-Year event
Inflow = 9.43 cfs @ 12.19 hrs, Volume= 22,528 of
Outflow = 9.43 cfs @ 12.19 hrs, Volume= 22,528 of, Aden= 0 , Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
lR OA OB 4
To WOaN Infiltration B
omiteS Uteast
S4 RaecM1 on LIRk
Somerset Storage - Proposed
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD®10.20-2f sin 01934 ® 2022 HvdroCAD Software Solutions LLC Pads 2
Rainfall Events Listing
EvenW
Event
Storm Type
Curve
Mode
Duration
BIB
Depth
AMC
Name
(hours)
(inches)
1
1-Year
MSE 24-hr
3
Default
24.00
1
2.48
2
2
2-Year
MSE 24-hr
3
Default
24.00
1
2.82
2
3
10-Year
MSE 24-hr
3
Default
24.00
1
4.12
2
4
100-Year
MSE 24hr
3
Default
24.00
1
6.89
2
Somerset Storage - Proposed
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCADO 10.20-2f sin 0193 ® 2022 HvdroCAD Software Solutions LLC Pace 3
Area Listing (all nodes)
Area
CN
Description
(sq-a)
(subcatchment-numbers)
58.925
]C
>75% Grass cover, Good, HSG C (A, B, C, D)
9,510
]i
Meadow, non -grazed, HSG C (B)
26,240
98
Proposed Building (B)
38,985
98
Proposed Pavement (B)
15,915
100
Wetland (A)
25,326
70
Woods, Good, HSG C (A, C)
1Y2,881
85
TOTAL AREA
Somerset Storage - Proposed MSE 24-hr 3 1-Year Rainfall=2.46"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD®10.20-2f sin 01934 ® 2022 HvdroCAD Software Solutions LLC Pace 4
Time span=0.00-240.00 hm, dt=0.01 Inns, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/lmperv.
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment A: Runoff Area=49,803d 31.96% Impervious Runoff Depth=1.1V
Flow Length=172' Tc=5.5 min CN=71/100 Runoff=1.99 cfs 4,594 d
Subcatchment B: Runoff Area=110,273 sf 59.13%Impervious Runoff Depth=1.M"
Flow Length=159' Tc=8.0 min CN=73/98 Runoff=5.85 cfs 14,174 d
Subcatchment C: Runoff Area=12,280 sf 0.00%Impervious Runoff Depth=0.55"
Flow Length=100' Slope=0.12007' Tc=7.4 min CN=73/0 Runoff=0.25 cfs 559d
Subcatchment D: Runoff Area=525 sf 0.00% Impervious Runoff Depth=0.59"
Flow Length=12' Slope=0.05W T Tc=1.9 min CN=74/0 Runoff=0.02 cfs 26 cf
Reach 1R: To Welland
Inflow=1.99 cfs 4,594d
Oufflow=1.99 cfs 4,594d
Reach 211: Offshe Southeast Inflow=0.84 cfs 8,774 cf
Oufflow=0.84 cfs 8,774d
Pond IF: Infiltration Basin Peak Elev-963.3T Storage=8,152d Inflow=5.85 cfs 14,174 cf
Discarded=0.04 cfs 5,984 cf Primary=0.79 cfs 8,190d Secondary0.00 cis 0d Outflow=0.83 cis 14,174d
Total Runoff Area = 172,881 sf Runoff Volume = 19,352 of Average Runoff Depth =1.34"
53.08%Pervious=91,761sf 46.92% Impervious = 81,120 sf
Somerset Storage - Proposed MSE 24-hr 3 1-Year Rainfall=2.46"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCA0010.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Pace 5
Summary for Subcatchmerd A:
Runoff = 1.99 ds @ 12.13 hrs, Volume= 4,594 d, Depth= 1.11"
Routed to Reach 1 R : To Wetland
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 1-Year Rainfall=2.46"
Area (sf) CN Description
11.971 74 >75 % Grass cover, Good, HSG C
21.917 70 Woods, Good, HSG C
' 15.915 100 Wetland
Area
5 100
To Length Slope Velocity Capacity Description
Range n= 0.130 P2= 2.81"
1.2 72 0,1530 0.98 Shallow Concentrated Flow,
Forest w/Heavv Litter Kv= 2.5 fps
5.5 172 Total
Somerset Storage - Proposed MSE 24-hr 3 1-Year Rainfall=2.46"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCA0010.20-2f sin 01934 ® 2022 HydroCAD Software Solutions LLC Pace 6
Summary for Subcatchment B:
Runoff = 5.85 ds @ 12.15 hrs, Volume= 14,174 d, Depth= 1.54"
Routed to Pond 1 P : Infiltration Basin
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 1-Year Rainfall=2.46"
38.965 98 Proposed Pavement
26.240 98 Proposed Building
35.558 74 >75% Grass cover,
Area
To
Length
Slope
Velocity
Capacity Description
(min)
(feet)
(R/R)
M/sec)
(of$)
2.4
36
0.2500
0.25
Sheet Flow,
Grass: Dense n= 0.240 P2= 2.81"
5.4
64
0.1094
0.20
Sheet Flow,
Grass: Dense n= 0.240 P2= 2.81"
0.2
59
0.1864
6.48
Shallow Concentrated Flow,
Grassed Waterwav Kv= 15.0 ins
8.0 159 Total
Somerset Storage - Proposed MSE 24-hr 3 1-Year Rainfall=2.46"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCADO 10.20-2f sin 01934 ® 2022 HydroCAD Software Solutions LLC Page 7
Summary for Subcatchment C:
Runoff = 0.25 ds @ 12.16 hrs, Volume= 559 d, Depth= 0.55"
Routed to Reach 2R : Offsile Southeast
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 1-Year Rainfall=2.46"
To Length Slope Velocity Capacity Description
(min) (feet) (R/R) (R/sec) (of$)
7.4 100 0.1200 0.22 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.81"
Somerset Storage - Proposed MSE 24-hr 3 1-Year Rainfall=2.46"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCADO 10.20-2f sin 01934 ® 2022 HvdroCAD Software Solutions LLC Pace 8
Summary for Subcatchment D:
Runoff = 0.02 ds @ 12.11 hrs, Volume= 26 cf, Depth= 0.59"
Routed to Reach 2R : Offsile Southeast
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 1-Year Rainfall=2.46"
Area (sf) CN Description
525 74 >75 % Grass cover, Good, HSG C
525 74 100.00% Pervious Area
To Length Slope Velocity Capacity Description
(min) (feet) (R/R) (R/sec) (of$)
1.9 12 0.0500 0.10 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.81"
Somerset Storage - Proposed MSE 24-hr 3 1-Year Rainfall=2.46"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD010.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Peas 9
Summary for Reach 1R: 7o Wetland
Inflow Area 49,803 sf, 31.96% Impervious, Inflow Depth= 1.11' for 1-Year event
Inflow = 1.99 afs @ 12.13 hrs, Volume= 4,594 of
Outflow = 1.99 cis @ 12.13 hrs, Volume= 4,594 of, Aaen= 0 , Lag= 0.0 min
Routing by Dyn-Slor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Somerset Storage - Proposed MSE 24-hr 3 1-Year Rainfall=2.46"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HVEroCADO 10.20-2f sin 01934 02022 HVdroCAD Software Solutions LLC Peas 10
Summary for Reach 2R: Offsite Southeast
Inflow Area 123,078 sf, 52.98% Impervious, Inflow Depth= 0.86" for 1-Year event
Inflow = 0.84 cfs @ 12.56 hrs, Volume= 8,774 of
Outflow = 0.84 cfs @ 12.56 hrs, Volume= 8,774 of, Aden= 0 , Lag= 0.0 min
Routing by Dyn-Slor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Somerset Storage - Proposed MSE 24-hr 3 1-Year Rainfall=2.46"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCADO 10.20-2f sin 01934 02022 HVdroCAD Software Solutions LLC Pace 11
Summary for Pond 1P: Infiltration Basin
Inflow Area 110,273 at, 59.13%Impervious, Inflow Depth= 1.54" for 1-Year event
Inflow = 5.85 ds @ 12.15 hrs, Volume= 14,174 d
Outflow = 0.83 ds @ 12.59 hrs, Volume= 14,174 d, Atten= 86%, Lag= 26.1 min
Discarded = 0.04 ds @ 12.59 hrs, Volume= 5,984 d
Primary = 0.79 ds @ 12.59 hrs, Volume= 8,190 d
Routed to Reach 2R : Offsile Southeast
Secondary = 0.00 ds @ 0.00 hrs, Volume= 0 d
Routed to Reach 2R : Offsite Southeast
Routing by Dyn-Stor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Peak Elev= 963.33' @ 12.59 his Surt.Area= 3,760 sf Storage= 8,152 d
Plug -Flow detention time= (not calculated: curlew precedes inflow)
Center -of -Mass det. time= 640.1 min ( 1,411.3 - 771.2 )
Volume Invert Avail.Storage Storage Description
#1 960.00' 36,766 d Custom Stage Data (Prismatic) Listed below (Recalc)
Device
Routine
Invert
Outlet Devices
#1
Primary
962,00'
15.0" Round Culvert
L= 23.0' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 962.00' / 961.00' S= 0.0435'r Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 1.23 sf
#2
Device 1
965.70'
4.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s)
#3
Device 1
962.00'
4.0" Vert. 4" Orifice C= 0.600 Limited to weir Flow at low heads
#4
Device 1
963,00'
8.0" Vert. 8" Orifice C= 0.600 Limited to weir Flow at low heads
#5
Secondary
966.62'
15.5' long x 6.0' breadth Broad -Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50 5.00 5.50
Coe(. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65
2.65 2S6 2.66 2.67 2.69 2.72 2.76 2.83
#6
Discarded
960.00'
0.500 in/hr Exflllmtion over Surface area
Somerset Storage - Proposed MSE 24-hr 3 1-Year Rainfall=2.46"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCAD®10.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Pace 12
iscerded OutFlow Max=0.04 cfs @ 12.59 hrs HW=963.33' (Free Discharge)
7=Exfiltration (Estimation Controls 0.04 cfs)
dmary OutFlow Max=0.79 cfs @ 12.59 him HW=963.33' TW=0.00' (Dynamic Tailwater)
Culvert (Passes 0.79 cfs of 4.96 cfs potential Sow)
2-Sharp-Created Rectangular Weir ( Controls 0.00 cfs)
3=4" Orifice (Orifice Controls 0.45 cfs @ 5.19 fps)
-8" Orifice (Orifice Controls 0.33 of$ @ 1.95 fps)
ecendary OutFlow Max-0.00 cfs @ 0.00 Inns HW=960.00' TW=0.00' (Dynamic Tailwater)
Broad -Crested Rectangular Weir ( Controls 0.00 cfs)
Somerset Storage - Proposed MSE 24-hr 3 2-Year Rainfall=2.82"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD®10.20-2f sin 01934 ® 2022 HvdroCAD Software Solutions LLC Pace 13
Time span=0.00-240.00 hm, dt=0.01 Inns, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/lmperv.
Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment A: Runoff Area=49,803 sf 31.96% Impervious Runoff Depth=1.3Y
Flow Length=172' Tc=5.5 min CN=71/100 Runoff=2.49 cfs 5,601 A
Subcatchment B: Runoff Area=110,273 sf 59.13%Impervious Runoff Depth=l B4"
Flow Length=159' Tc=8.0 min CN=73/98 Runoff=6.99 cfs 16,881 d
Subcatchment C: Runoff Area=12,280 sf 0.00%Impervious Runoff Depth=0.75"
Flow Length=100' Slope=0.12007' Tc=7.4 min CN=73/0 Runoff=0.35 cfs 766 cf
Subcatchment D: Runoff Area=525 sf 0.00% Impervious Runoff Depth=0.80"
Flow Length=l2' Slope=0.05007 Tc=1.9min CN=74/0 Runoff=0.02cfs 35cf
Reach 1R: To Welland
Inflow=2.49 cfs 5,601 cf
Outflow=2.49 cfs 5,601 cf
Reach 211: Offshe Southeast Inflow=1.46 cfs 11,601 cf
Outflow=1.46 cfs 11,601 of
Pond 1P: Infiltration Basin Peak Elev-963.59' Storage=9,172 cf Inflow=6.99 cfs 16,881 cf
Discarded=0.05 cfs 6,081 cf Primary=1.36 cfs 10,800 cf Secondary=0.00 cfs 0 cf Outflow=1.41 cfs 16,881 cf
Total Runoff Area = 172,881 sf Runoff Volume = 23,283 cf Average Runoff Depth =1.62"
53.080/6 Pervious = 91,761 sf 46.92% Impervious = 81,120 sf
Somerset Storage - Proposed MSE 24-hr 3 2-Year Rainfall=2.82"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD®10.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Pace 14
Summary for Subcatchmerd A:
Runoff = 2.49 ds @ 12.13 hrs, Volume= 5,601 of, Depth= 1.35"
Routed to Reach 1 R : To Wetland
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr3 2-Year Rainfall=2.82"
Area (sf) CN Description
11.971 74 >75 % Grass cover, Good, HSG C
21.917 70 Woods, Good, HSG C
' 15.915 100 Wetland
Area
5 100
To Length Slope Velocity Capacity Description
Range n= 0.130 P2= 2.81"
1.2 72 0,1530 0.98 Shallow Concentrated Flow,
Forest w/Heavv Litter Kv= 2.5 fps
5.5 172 Total
Somerset Storage - Proposed MSE 24-hr 3 2-Year Rainfall=2.82"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCA0010.20-2f sin 01934 ® 2022 HydroCAD Software Solutions LLC Pace 15
Summary for Subcatchment B:
Runoff = 6.99 ds @ 12.15 hrs, Volume= 16,881 ct, Depth= 1.84"
Routed to Pond 1 P : Infiltration Basin
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr3 2-Year Rainfall=2.82"
38.965 98 Proposed Pavement
26.240 98 Proposed Building
35.558 74 >75% Grass cover,
Area
To
Length
Slope
Velocity
Capacity Description
(min)
(feet)
(R/R)
M/sec)
(of$)
2.4
36
0.2500
0.25
Sheet Flow,
Grass: Dense n= 0.240 P2= 2.81"
5.4
64
0.1094
0.20
Sheet Flow,
Grass: Dense n= 0.240 P2= 2.81"
0.2
59
0.1864
6.48
Shallow Concentrated Flow,
Grassed Waterwav Kv= 15.0 ins
8.0 159 Total
Somerset Storage - Proposed MSE 24-hr 3 2-Year Rainfall=2.82"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCADO 10.20-2f sin 01934 ® 2022 HydroCAD Software Solutions LLC Pace 16
Summary for Subcatchment C:
Runoff = 0.35 ds @ 12.16 hrs, Volume= 766 d, Depth= 0.75"
Routed to Reach 2R : Offsile Southeast
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr3 2-Year Rainfall=2.82'
To Length Slope Velocity Capacity Description
(min) (feet) (R/R) (R/sec) (of$)
7.4 100 0.1200 0.22 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.81"
Somerset Storage - Proposed MSE 24-hr 3 2-Year Rainfall=2.82"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCADO 10.20-2f sin 01934 ® 2022 HvdroCAD Software Solutions LLC Pape 17
Summary for Subcatchment D:
Runoff = 0.02 ds @ 12.11 hrs, Volume= 35 cl, Depth= 0.80"
Routed to Reach 2R : Offsile Southeast
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr3 2-Year Rainfall=2.82'
Area (sf) CN Description
525 74 >75 % Grass cover, Good, HSG C
525 74 100.00% Pervious Area
To Length Slope Velocity Capacity Description
(min) (feet) (R/R) (R/sec) (of$)
1.9 12 0.0500 0.10 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.81"
Somerset Storage - Proposed MSE 24-hr 3 2-Year Rainfall=2.82"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD010.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Pace 18
Summary for Reach 1R: To Wetland
Inflow Area 49,803 sf, 31.96%Impervious, Inflow Depth= 1.35" for 2-Year event
Inflow = 2.49 ofs @ 12.13 hrs, Volume= 5,601 of
Outflow = 2.49 cis @ 12.13 hrs, Volume= 5,601 of, Aaen= 0%, Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Somerset Storage - Proposed MSE 24-hr 3 2-Year Rainfall=2.82"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HVEroCADO 10.20-2f sin 01934 02022 HVdroCAD Software Solutions LLC Peas 19
Summary for Reach 2R: Offsits Southeast
Inflow Area 123,078 sf, 52.98% Impervious, Inflow Depth= 1.13" for 2-Year event
Inflow = 1.46 cfs @ 12.45 hrs, Volume= 11,601 of
Outflow = 1.46 cis @ 12.45 hrs, Volume= 11,601 of, Aden= 0 , Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Somerset Storage - Proposed MSE 24-hr 3 2-Year Rainfall=2.82"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdrOCADO 10.20-2f sin 01934 02022 HVdroCAD Software Solutions LLC Pace 20
Summary for Pond 1P: Infiltration Basin
Inflow Area 110,273 at, 59.13%Impervious, Inflow Depth= 1.84" for 2-Year event
Inflow = 6.99 ds @ 12.15 hrs, Volume= 16,881 d
Outflow = 1.41 ds @ 12.47 hrs, Volume= 16,881 d, Atten= 80%, Lag= 19.4 min
Discarded = 0.05 ds @ 12.47 hrs, Volume= 6,081 d
Primary = 1.36 ds @ 12.47 hrs, Volume= 10,800 d
Routed to Reach 2R : Offsile Southeast
Secondary = 0.00 ds @ 0.00 hrs, Volume= 0 d
Routed to Reach 2R : Offsite Southeast
Routing by Dyn-Stor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Peak Elev= 963.59' @ 12.47 his Surt.Area= 3,986 sf Storage= 9,172 d
Plug -Flow detention time= (not calculated: curlew precedes inflow)
Center -of -Mass det. time= 554.3 min ( 1,324.1 - 769.7 )
Volume Invert Avail.Storage Storage Description
#1 960.00' 36,766 at Custom Stage Data (Prismatic) Listed below (Recalc)
Device
Routine
Invert
Outlet Devices
#1
Primary
962,00'
15.0" Round Culvert
L= 23.0' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 962.00' / 961.00' S= 0.0435'r Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 1.23 sf
#2
Device 1
965.70'
4.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s)
#3
Device 1
962.00'
4.0" Vert. 4" Orifice C= 0.600 Limited to weir Flow at low heads
#4
Device 1
963,00'
8.0" Vert. 8" Orifice C= 0.600 Limited to weir Flow at low heads
#5
Secondary
966.62'
15.5' long x 6.0' breadth Broad -Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50 5.00 5.50
Coe(. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65
2.65 2S6 2.66 2.67 2.69 2.72 2.76 2.83
#6
Discarded
960.00'
0.500 in/hr Exflllmtion over Surface area
Somerset Storage - Proposed MSE 24-hr 3 2-Year Rainfall=2.82"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCAD@ 10.20-2f sin 01934 @ 2022 HVdroCAD Software Solutions LLC Pace 21
imad OutFlow Max=0.05 cfs @ 12.47 hrs HW=963.59' (Free Discharge)
7Exfiltration (EAltration Controls 0.05 cfs)
dmary OutFlow Max=1.36 cfs @ 12.47 his HW=963.59' TW=0.00' (Dynamic Tailwater)
Culvert (Passes 1.36 cfs of 5.81 cfs potential Sow)
2-Sharp-Created Rectangular Weir ( Controls 0.00 cfs)
3=4" Orifice (Orifice Controls 0.50 cfs @ 5.75 fps)
-8" Orifice (Orifice Controls 0.86 cfs @ 2.62 fps)
ecendary OutFlow Max-0.00 cfs @ 0.00 Inns HW=960.00' TW=0.00' (Dynamic Tailwater)
Broad -Crested Rectangular Weir ( Controls 0.00 cfs)
Somerset Storage - Proposed MSE24-hr3 10-Year Ramfall=4.12"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD®10.20-2f sin 01934 ® 2022 HvdroCAD Software Solutions LLC Pace 22
Time span=0.00-240.00 hm, dt=0.01 Inns, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/lmperv.
Reach routing by Dyn-Slor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment A: Runoff Area=49,803 sf 31.96% Impervious Runoff Depth=2.32"
Flow Length=172' Tc=5.5 min CN=71/100 Runoff=4.49 cis 9,635 A
Subcatchment B: Runoff Area=110,273sf 59.13%Impervious Runoff Depth=2.96"
Flow Length=159' Tc=8.0 min CN=73/98 Runoff=11.29 cfs 27,171 cf
Subcatchment C: Runoff Area=12,280 sf 0.00%Impervious Runoff Depth=1.6V
Flow Length=10T Slope=0.1200'f Tc=7.4 min CN=73/0 Runoff=0.79 cfs 1,652 cf
Subcatchment D: Runoff Area=525 sf 0.00% Impervious Runoff Depth=1.68"
Flow Length=12' Slope=0.0500 P Tc=1.9 min CN=74/0 Runoff=0.04 cfs 74 cf
Reach IR: To Wetland
Inflow=4.49 cfs 9,635 cf
Oufflow=4.49 cfs 9,635 cf
Reach 211: Offshe Southeast Inflow=2.86 cfs 22,527 cf
Outflow=2.86 cfs 22,527 of
Pond 1P: Infiltration Basin Peak Elev=964.63' Storage=13,782 cf In0cw=11.29 cfs 27,171 cf
Discarded=0.06 cfs 6,370 cf Primary=2.57 cfs 20,801 c1 Secondary=0.00 cis 0 cf Oufflaw=2.63 cfs 27,171 ci
Total Runoff Area = 172,881 sf Runoff Volume = 38,532 cf Average Runoff Depth = 2.67"
53.08%Pervious =91,761 sf 46.92% Impervious = 81,120 sf
Somerset Storage - Proposed MSE24-hr3 10-Year Rawfaft-4.12"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCA0010.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Pace 23
Summary for Subcatchmerd A:
Runoff = 4.49 ds @ 12.13 hrs, Volume= 9,635 of, Depth= 2.32"
Routed to Reach 1 R : To Wetland
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 10-Year Rainfall=4.12"
Area (sf) CN Description
11.971 74 >75 % Grass cover, Good, HSG C
21.917 70 Woods, Good, HSG C
' 15.915 100 Wetland
Area
5 100
To Length Slope Velocity Capacity Description
Range n= 0.130 P2= 2.81"
1.2 72 0,1530 0.98 Shallow Concentrated Flow,
Forest w/Heavv Litter Kv= 2.5 fps
5.5 172 Total
Somerset Storage - Proposed MSE24-hr3 10-Year Rawfall=4.12"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCA0010.20-2f sin 01934 ® 2022 HydroCAD Software Solutions LLC Pace 24
Summary for Subcatchment B:
Runoff = 11.29 ds @ 12.15 hrs, Volume= 27,171 of, Depth= 2.96"
Routed to Pond 1 P : Infiltration Basin
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 10-Year Rainfall=4.12"
38.965 98 Proposed Pavement
26.240 98 Proposed Building
35.558 74 >75% Grass cover,
Area
To
Length
Slope
Velocity
Capacity Description
(min)
(feet)
(R/R)
M/sec)
(of$)
2.4
36
0.2500
0.25
Sheet Flow,
Grass: Dense n= 0.240 P2= 2.81"
5.4
64
0.1094
0.20
Sheet Flow,
Grass: Dense n= 0.240 P2= 2.81"
0.2
59
0.1864
6.48
Shallow Concentrated Flow,
Grassed Waterwav Kv= 15.0 ins
8.0 159 Total
Somerset Storage - Proposed MSE24-hr3 10-Year Rawfall=4.12"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCADO 10.20-2f sin 01934 ® 2022 HydroCAD Software Solutions LLC Pace 25
Summary for Subcatchment C:
Runoff = 0.79 ds @ 12.15 hrs, Volume= 1,652 cf, Depth= 1.61"
Routed to Reach 2R : Offsile Southeast
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 10-Year Rainfall=4.12"
To Length Slope Velocity Capacity Description
(min) (feet) (R/R) (R/sec) (of$)
7.4 100 0.1200 0.22 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.81"
Somerset Storage - Proposed MSE24-hr3 10-Year Rawfall=4.12"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCADO 10.20-2f sin 01934 ® 2022 HvdroCAD Software Solutions LLC Pace 26
Summary for Subcatchment D:
Runoff = 0.04 ds @ 12.10 hrs, Volume= 74 of, Depth= 1.68"
Routed to Reach 2R : Offsile Southeast
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 10-Year Rainfall=4.12"
Area (sf) CN Description
525 74 >75 % Grass cover, Good, HSG C
525 74 100.00% Pervious Area
To Length Slope Velocity Capacity Description
(min) (feet) (R/R) (R/sec) (of$)
1.9 12 0.0500 0.10 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.81"
Somerset Storage - Proposed MSE24-hr3 10-Year Rainfall=4.12"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCAD010.20-2f sin 01934 ® 2022 HvdroCAD Software Solutions LLC Peas 27
Summary for Reach 1R: 7o Wetland
Inflow Area 49,803 sf, 31.96% Impervious, Inflow Depth= 2.32" for 10-Year event
Inflow = 4.49 cfs @ 12.13 hrs, Volume= 9,635 cf
Outflow = 4.49 cis @ 12.13 hrs, Volume= 9,635 cf, Aaen= 0 , Lag= 0.0 min
Routing by Dyn-Slor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Somerset Storage - Proposed MSE24-hr3 10-Year Rainfaft-4.12"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCADO 10.20-2f sin 01934 02022 HvdroCAD Software Solutions LLC Peas 28
Summary for Reach 2R: Offsits Southeast
Inflow Area 123,078 sf, 52.98% Impervious, Inflow Depth= 2.20" for 10-Year event
Inflow = 2.86 cfs @ 12.21 hrs, Volume= 22,527 of
Outflow = 2.86 cis @ 12.21 hrs, Volume= 22,527 of, Aden= 0 , Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Somerset Storage - Proposed MSE24-hr3 fO-Year Rainfall=4.12"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD1v10.20-2f sin 01934 02022 HVdroCAD Software Solutions LLC Pace 29
Summary for Pond IP: Infiltration Basin
Inflow Area 110,273 at, 59.13%Impervious, Inflow Depth= 2.96" for 10-Year event
Inflow = 11.29 ds @ 12.15 hrs, Volume= 27,171 d
Outflow = 2.63 ds @ 12.43 hrs, Volume= 27,171 d, Atten= 77%, Lag= 16.5 min
Discarded = 0.06 ds @ 12.43 hrs, Volume= 6,370 d
Primary = 2.57 ds @ 12.43 hrs, Volume= 20,801 d
Routed to Reach 2R : Offsile Southeast
Secondary = 0.00 ds @ 0.00 hrs, Volume= 0 d
Routed to Reach 2R : Offsile Southeast
Routing by Dyn-Stor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Peak Elev= 964.63' @ 12.43 his Surt.Area= 4,913 sf Storage= 13,782 d
Plug -Flow detention time= (not calculated: curlew precedes inflow)
Center -of -Mass det. time= 382.2 min ( 1,148.0 - 765.8 )
Volume Invert Avail.Storage Storage Description
#1 960.00' 36,766 d Custom Stage Data (Prismatic) Listed below (Recalc)
Device
Routine
Invert
Outlet Devices
#1
Primary
962,00'
15.0" Round Culvert
L= 23.0' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 962.00' / 961.00' S= 0.0435'r Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 1.23 sf
#2
Device 1
965.70'
4.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s)
#3
Device 1
962.00'
4.0" Vert. 4" Orifice C= 0.600 Limited to weir Flow at low heads
#4
Device 1
963,00'
8.0" Vert. 8" Orifice C= 0.600 Limited to weir Flow at low heads
#5
Secondary
966.62'
15.5' long x 6.0' breadth Broad -Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50 5.00 5.50
Coe(. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65
2.65 2S6 2.66 2.67 2.69 2.72 2.76 2.83
#6
Discarded
960.00'
0.500 in/hr Exflllmtion over Surface area
Somerset Storage - Proposed MSE 24-hr 3 10-Year Rahafaft-4.12"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCAD®10.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Pace 30
iscemost OutFlow Max=0.06 cfs @ 12.43 hrs HW=964.63' (Free Discharge)
7=Exfiltration (Estimation Controls 0.06 cfs)
dmary OutFlow Max=2.57 cfs @ 12.43 hrs HW=964.63' TW=0.00' (Dynamic Tailwater)
Culvert (Passes 2.57 cfs of 8.37 cfs potential Sow)
2-Sharp-Created Rectangular Weir ( Controls 0.00 cfs)
3=4" Orifice (Orifice Controls O.66 cfs @ 7.56 fps)
-8" Orifice (Orifice Controls 1.91 cfs @ 5.48 fps)
ecendary OutFlow Max-0.00 cfs @ 0.00 Inns HW=960.00' TW=0.00' (Dynamic Tailwater)
Broad -Crested Rectangular Weir ( Controls 0.00 cfs)
Somerset Storage - Proposed MSE24-hr3 100-Year Rainfalf=6.89"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD u 10.20-2f sin 01934 ® 2022 HvdrOCAD Software Solutions LLC Pace 31
Time span=0.00-240.00 hm, dt=0.01 Inns, 24001 points
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv.
Reach routing by Dyn-Slor-Ind method - Pond routing by Dyn-Stor-Ind method
Subcatchment A: Runoff Area=49,803 sf 31.96% Impervious Runoff Depth=4.67"
Flow Length=172' Tc=5.5 min CN=71/100 Runoff=9.23 cfs 19,392 cf
Subcatchment B: Runoff Area=110,273 sf 59.13%Impervious Runoff Depth=5.50"
Flow Length=159' Tc=8.0 min CN=73/98 Runoff=20.97 cfs 50,564 cf
Subcatchment C: Runoff Area=12,280 sf 0.00%Impervious Runoff Depth=3.84"
Flow Length=10T Slope=0.1200'f Tc=7.4 min CN=73/0 Runoff=1.88 cfs 3,930 cf
Subcatchment D: Runoff Area=525 sf 0.00% Impervious Runoff Depth=3.95"
Flow Length=l2' Slope=0.0500'f Tc=1.9min CN=74/0 Runoff=0.10cfs 173cf
Reach 1R: To Wetland
Inflow=9.23 cfs 19,392 cf
Oufflow=9.23 cfs 19,392 of
Reach 211: Offshe Southeast Inflow=8.85 cfs 47,825 cf
Oufflow=8.85 cfs 47,825 cf
Pond 1P: Infiltration Basin Peak Elev=966.19' Storage=22,619 cf Inffow=20.97 cfs 50,564 cf
Discarded=0.07cfs 6,842cf Primary=8.10cfs 43,722cf Secondary=O.00cfs Ocf Oudlcw=8.17cfs 50,564cr
Total Runoff Area = 172,881 sf Runoff Volume = 74,059 ef Average Runoff Depth = 5.14"
53.O80/6Pervious =91,761 sf 46.92% Impervious = 81,120 sf
Somerset Storage - Proposed MSE24-hr3 100-Year Rainfaff=6.89"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD®10.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Pace 32
Summary for Subcatchmerd A:
Runoff = 9.23 ds @ 12.13 hrs, Volume= 19,392 of, Depth= 4.67"
Routed to Reach 1 R : To Wetland
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 100-Year Rainfall=6.89"
Area (sf) CN Description
11.971 74 >75 % Grass cover, Good, HSG C
21.917 70 Woods, Good, HSG C
' 15.915 100 Wetland
Area
5 100
To Length Slope Velocity Capacity Description
Range n= 0.130 P2= 2.81"
1.2 72 0,1530 0.98 Shallow Concentrated Flow,
Forest w/Heavv Litter Kv= 2.5 fps
5.5 172 Total
Somerset Storage - Proposed MSE24-hr3 100-Year Rainfaff=6.89"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCA0010.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Pace 33
Summary for Subcatchment B:
Runoff = 20.97 ds @ 12.15 hrs, Volume= 50,564 cf, Depth= 5.50"
Routed to Pond 1 P : Infiltration Basin
Runoff by SCS TR-20 method, UH=SCS, Split Perviousflmperv., Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 100-Year Rainfall=6.89"
38.965 98 Proposed Pavement
26.240 98 Proposed Building
35.558 74 >75% Grass cover,
Area
To
Length
Slope
Velocity
Capacity Description
(min)
(feet)
(R/R)
M/sec)
(of$)
2.4
36
0.2500
0.25
Sheet Flow,
Grass: Dense n= 0.240 P2= 2.81"
5.4
64
0.1094
0.20
Sheet Flow,
Grass: Dense n= 0.240 P2= 2.81"
0.2
59
0.1864
6.48
Shallow Concentrated Flow,
Grassed Waterwav Kv= 15.0 ins
8.0 159 Total
Somerset Storage - Proposed MSE24-hr3 100-Year Rainfaff=6.89"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydrOCAD 10.20-2f sin 01934 ® 2022 HydroCAD Software Solutions LLC Pace 34
Summary for Subcatchment C:
Runoff = 1.88 ds @ 12.15 hrs, Volume= 3,930 of, Depth= 3.84"
Routed to Reach 2R : Offsile Southeast
Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 100-Year Rainfall=6.89"
To Length Slope Velocity Capacity Description
(min) (feet) (R/R) (R/sec) (of$)
7.4 100 0.1200 0.22 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.81"
Somerset Storage - Proposed MSE24-hr3 100-Year Rainfaff=6.89"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCADO 10.20-2f sin 01934 ® 2022 HvdroCAD Software Solutions LLC Pace 35
Summary for Subcatchment D:
Runoff = 0.10 ds @ 12.10 hrs, Volume= 173 of, Depth= 3.95"
Routed to Reach 2R : Offsile Southeast
Runoff by SCS TR-20 method, UH=SCS, Split Perviousflmperv., Time Span= 0.00-240.00 hrs, dt= 0.01 hrs
MSE 24-hr 3 100-Year Rainfall=6.89"
Area (sf) CN Description
525 74 >75 % Grass cover, Good, HSG C
525 74 100.00% Pervious Area
To Length Slope Velocity Capacity Description
(min) (feet) (R/R) (R/sec) (of$)
1.9 12 0.0500 0.10 Sheet Flow,
Grass: Dense n= 0.240 P2= 2.81"
Somerset Storage - Proposed MSE24-hr3 100-Year Rainfall=6.89"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD010.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Pace 36
Summary for Reach 1R: To Wetland
Inflow Area 49,803 sf, 31.96% Impervious, Inflow Depth= 4.6T for 100-Year event
Inflow = 9.23 cfs @ 12.13 hrs, Volume= 19,392 of
Outflow = 9.23 cis @ 12.13 hrs, Volume= 19,392 of, Aaen= 0 , Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Somerset Storage - Proposed MSE24-hr3 100-Year Rainfall=6.89"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydroCADO 10.20-2f sin 01934 02022 HVdroCAD Software Solutions LLC Peas 37
Summary for Reach 2R: Offsite Southeast
Inflow Area 123,078 sf, 52.98% Impervious, Inflow Depth= 4.66" for 100-Year event
Inflow = 8.85 cfs @ 12.29 hrs, Volume= 47,825 of
Outflow = 8.85 cfs @ 12.29 hrs, Volume= 47,825 of, Aden= 0 , Lag= 0.0 min
Routing by Dyn-Stor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Somerset Storage - Proposed MSE24-hr3 100-Year Rainfall=6.89"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HvdroCAD1v10.20-2f sin 01934 02022 HVdroCAD Software Solutions LLC Pace 38
Summary for Pond IP: Infiltration Basin
Inflow Area 110,273 at, 59.13%Impervious, Inflow Depth= 5.50" for 100-Year event
Inflow = 20.97 ols @ 12.15 hrs, Volume= 50,564 cf
Outflow = 8.17 cis @ 12.30 hrs, Volume= 50,564 cf, Aren= 61 %, Lag= 9.2 min
Discarded = 0.07 ols @ 12.30 hrs, Volume= 6,842 cf
Primary = 8.10 cis @ 12.30 hrs, Volume= 43,722 cf
Routed to Reach 2R : Offsile Southeast
Secondary = 0.00 cis @ 0.00 hrs, Volume= 0 cf
Routed to Reach 2R : Offsile Southeast
Routing by Dyn-Stor-Ind method, Time Span= 0.00-240.00 hrs, dl= 0.01 hrs
Peak Elev= 966.19' @ 12.30 his Surt.Area= 6,422 sf Storage= 22,619 cf
Plug -Flow detention time= (not calculated: curlew precedes inflow)
Center -of -Mass det. time= 247.3 min ( 1,007.6 - 760.3 )
Volume Invert Avail.Storage Storage Description
#1 960.00' 36,766 cf Custom Stage Data (Prismatic) Listed below (Recalc)
Device
Routine
Invert
Outlet Devices
#1
Primary
962,00'
15.0" Round Culvert
L= 23.0' CPP, square edge headwall, Ke= 0.500
Inlet / Outlet Invert= 962.00' / 961.00' S= 0.0435'r Cc= 0.900
n= 0.013 Corrugated PE, smooth interior, Flow Area= 1.23 sf
#2
Device 1
965.70'
4.0' long Sharp -Crested Rectangular Weir 2 End Contraction(s)
#3
Device 1
962.00'
4.0" Vert. 4" Orifice C= 0.600 Limited to weir Flow at low heads
#4
Device 1
963,00'
8.0" Vert. 8" Orifice C= 0.600 Limited to weir Flow at low heads
#5
Secondary
966.62'
15.5' long x 6.0' breadth Broad -Crested Rectangular Weir
Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00
2.50 3.00 3.50 4.00 4.50 5.00 5.50
Coe(. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65
2.65 2S6 2.66 2.67 2.69 2.72 2.76 2.83
#6
Discarded
960.00'
0.500 in/hr Exflllmtion over Surface area
Somerset Storage - Proposed MSE24-hr3 100-Year Rainfalt-6.89"
Prepared by Larson Engineering Of MN Printed 9/13/2023
HydrOCAD®10.20-2f sin 01934 ® 2022 HVdroCAD Software Solutions LLC Pace 39
iscerded OutFlow Max=0.07 cfs @ 12.30 hrs HW=966.19' (Free Discharge)
7=Exfiltration (EAltration Controls 0.07 cfs)
dmary OutFlow Max=8.09 cfs@12.30 hrs HW=966.19' TW=0.00' (Dynamic Tailwater)
Culvert (Passes 8.09 cfs of 11.16 cfs potential Sow)
2-Sharp-Crested Rectangular Weir (Weir Controls 4.41 cfs @ 2.29 fps)
3=4" Orifice (Orifice Controls 0.84 cfs @ 9.66 fps)
-8" Orifice (Orifice Controls 2.84 cfs @ 8.14 fps)
ecendary OutFlow Max-0.00 cfs @ 0.00 Inns HW=960.00' TW=0.00' (Dynamic Tailwater)
Broad -Crested Rectangular Weir ( Controls 0.00 cfs)
PS thrum Catchment Model. Version 35
Case
Somerset Sunge EmWng.pk
ride
Wmersetsmage &istirq
Pi
MspW95.psy
Pi
rumNiu p
File Dlrecmry
P:WrgecLLll'i-W23tl3Ri
Casa Tgle
Smrereat Storage Eusting
Case File
Smrerwt_Smmga Exlatirg.p&
Partde File
num».pep
TempmWre File
MM6005bm
Strom File
MMN4M5.pap
Preaip Smle Fasi
1
Watersheds
z
Dnlcea
1
Pai
5
WO Ccnwrrenb
Still Dab
03I13M
Keep Dab
WI1391
Stop Daft
11roare5
310111) Court
No
Taal Fmrre
40875
Wa Hoare
4797
Pwip (in)
IN
Rain (in)
13a
Si (in)
10
srwmnelt (in)
10
EvaWTmnfln)
105
Drerall TS3 Removal(%)
0
Water Balame E"q%)
0
TS3 Man Babnw Error (%)
0
Run Dab
Oli
Alai
0311351
Frei
150.3
IaelDab
I1IOClaS
li
134.47
Events
no
Snisear)
1581
TdalWe
WK575
ToblYm
d.&
PS Man Cake WM. Va uun 35
Run
MI&M
Gse SamveelsbMs ExMng.pft
FiMOOe
0&1391
Mcip)in)
1503
Tlde Same tSMepe ExKting
L so
11IM95
Raln(h)
1MA7
PmFle MWN95.g
Events
3w
Snv n)
1551
PWRW nurl Op
TablHm
9 675
Towffm
d."
IST5
ens. Carnrauon Factor
Season Stan Month
Mtec�eM Molslum fmEltlon M1GII Main
Eeasm 1.w 2
.10
Wa"W 0.b
Wasserman Nam
Runoff to Device
InAltacan b Oavlw
WatwNM Area
ARHm, West)
Tarel Runoff
anti Soups
Total Runoff
t)
11596
1.]W3
6C6 once Nurox(Pervloas)
ictle racmr to- Pervious FiurcX Loved
Indirectly Connecletl Impact Function
]t
71
1
1
0
0
Unswapl Impervious Fraction
UnSMpi Oegesaon Storage(Ienhes)
UnSvepl lmlrerv. Rune CwNclenl
IlnSwepl scats return to PeNcle Iola
0.1617
0
OM
0M
1
1
0
I
None Impervious Fraaam
ii Depression stoma¢ arches)
mio In pact. Ri Cceltitlam
Svepl Sure Faoor far Pari LmOe
Sxeepng Four
Suaepin9 Efficiency
ismong start Date(MMOD)
meeong stop Date(MMDD)
0
0
O.M
0M
I
I
1
1
0
0
1
1
101
101
IMI
12%
PNtla Ca
PaWe Flk
nWW..Op
PMtle Cleaa
PO%
P10%
mm
P50%
POM
Fl4allcn Elllclanry (%)
6ewing vemclry(iMr)
P19l Omer Ceeey Rem(11day)
me Omer Oemy(veayppm)
80
100
103
103
103
0
003
03
15
15
a
0
0
0
0
0
0
0
0
0
Imparvlwa Randl cam(pW)
Parvicus RUM Cmc(ppm)
Pwvicus Dam Exp
Accu Rale(Ibfe q)
Panlde Removal Raie(1/Eay)
Waabo0 Coe01denl
Wash Exponar
Sreeper EMnerry
1
0
0
0
0
1
100
1W
I
300
0
1
1
1
1
0
115
135
175
&S
0
of
00
00
00
0
A
91
W
W
0
R
R
Y
R
0
0
0
5
15
W aim QutlXy Garpmenl Ced
Cmn{a T86 TP iKN W 19 ZN XC
QvW4Cmetle(pW)
bvelI
gel z
01
Cmbnl SWeFades
I 1 I 1
I 1 I 1
I 1
II
1
Palkle Cdnpcxl(mg&g)
�P0%
0
WOW
00WW
13PU.
31p0
01W0
RSCWO
I low" I 3M I loom I Sao I iW I 1500 I 2z500 I
F,,l�
Will
flilm si
fillip
hill
k,,,
F4l,5A
W,,,,
Llll
i liolig. Fi,,lif
%,,Aff
L,,,j
ElFb, E,d, lPlllkp
Fill
um
,,u v,p,q,,
Ni
lwl� I=" cw
Fixcr
F4," mm cl,,F
FIKACR
IIN'DE5 mmm m
A(01&18W�q �l .,,l,.rr 71 1,1 1 1111, 10 1 1 1 Ill 1 1 ill ill, 1
lqc1f"l�`llll 1 )a2 =Ri 71 0 ow 1 0 ow 1 1 0 0 m I 1 101 1231 1
PO Mm �h� �. V� 3
P�F�
M,��
P�ft
,W^
wnml�
N,I,, T�mmff
RM
W,, �� Tm
01 �wd l4w,
mw
4
mw��m
sw
4�
09��
4 �
lo��
�w
4 U
i2wmm�
5 �
4 �
wm �mw (%)
On
0 w
Flh�
�1�1
P�(1,)
1�s
11�5
�W
IUA?
��In)
15M
T�
4W?6
Tmyl
4m
P10%
P�
M%
M
�N
M
HC
lo�
lom
1065
21.n
�2a
0 m
3M
0 M
OM
032
2 a
1065
lom
1065
21 N
M23
am
301
om
ow
032
2M
lom
lo�
1066
21.�
�23
0 m
30
0 M
O.M
032
Z�
lom
Mm
1065
21 n
�2a
�m
1�
0 �
"Z
Z�
lo�ffi
iol�
1065
21�
�2s
olm
101
0 M
0�2
zM
om
0 N
000
On
000
0 N
om
0 w
O.M
ow
�w
PS Urnan Catchment Model, Version 35
Case Somerset 9bmge Proposed p&
True Somerset Storage Proposed
PrecFile WoSM)5.m
ParlFlle nurp50.pBp
nle Directory
P:1Progcts\Pralects 2023\12238114-Somerset Storage Garagil OealgnlCelculatlons\PI31
Case The
Somerset Storage Proposed
Case File
Somerset Stial Proposed.p3c
Inside File
nurp50.p8p
Temperature File
WP5095 term
Strom File
MV505.lteg
Preclp Scale Factor
1
Walersi
Devices
parl
WQ Components
PS Man Caleb WM, Var 35
Gse
Somvser5mms Propastl.p8c
Title
Samaser 5mrepe Pmpastl
PmFle
MWN95.g
PWFiW
nurl Op
ens. Celibratlon Fe r
Season SW Monty
MkctleM Molsrumf dlfion MIGII Main
Eeacm i.w 210
Wa"W 0.b
Waterman Nam
Runoff to Device
IM14acan b DBrlw
WatwNM Area
B
Infiltration Basin
25315
6C6 CLrva Nurox (Pervlou¢)
Seas racmr to- Parvlous Ri Load
Indirectly connected Impact Function
]<
I
0
Un3wap11mPon'uaa Fraction
Uni Oepre¢¢on Storage(ir"Fe¢)
UnSvepl Irma". Ri CoaMclent
UnSwapl Scala Pocbr to PeNrlelmis
0.5913
0W
1
I
swept Impervious wanton
ii Depression storage arches)
swept Inperv. Ri CaelriaemS pl Sul, Factor far Pari Lwd¢So,ai Framy Somong EMclencySkimp ng Start D ne (MMDD)m eong Stop Date(MNDER
0
din,
PNtla Ca
PaWe Flk
nWW..Op
PMtle Cleaa
PO%
P10%
mm
P50%
POM
Fl4allcn Elllclanry (%)
6ewing vemclry(iMr)
P19l Omer Ceeey Rem(11day)
me Omer Oemy(veayppm)
80
100
103
103
103
0
003
03
15
15
a
0
0
0
0
0
0
0
0
0
Imparvlwa Randl cam(pW)
Parvicus RUM Cmc(ppm)
Pwvicus Dam Exp
Accu Rale(Ibfe q)
Panlde Removal Raie(1/Eay)
Waabo0 Coe01denl
Wash Exponar
Sreeper EMnerry
1
0
0
0
0
1
100
1W
I
300
0
1
1
1
1
0
115
135
175
&S
0
of
00
00
00
0
A
91
W
W
0
R
R
Y
R
0
0
0
5
15
W aim QutlXy Garpmenl Ced
Cmn{a T86 TP iKN W 19 ZN XC
QvW4Cmetle(pW)
bvelI
gel z
01
Cmbnl SWeFades
I 1 I 1
I 1 I 1
I 1
II
1
Palkle Cdnpcxl(mg&g)
�P0%
0
WOW
00WW
13PU.
31p0
01W0
RSCWO
I low" I 3M I loom I Sao I iW I 1500 I 2z500 I
TON
M
*�
*N
W)w
o�.
",„
,.
� , a
ON
,
, o
ae ,
o,
123I
iim
Smmlmm w.m �=m.nft
wroiw
�ew.,Ps
v.nini13447
s.sw
"Www
Tw
awre
.d,y,
4a
W"uw. ay.
tee.
aw• Mwt
-�
.,umww
1.=w.w.k
.wW Rw,wM)
o.w
rs.w
was
law
wai
w.eI
w.re
l"I
ww
wm
W2
w.w
e.v
State of Wisconsin
DEPARTMENT OF NATURAL RESOURCES
West Central Region Headquarters
1300 W. Clalremont Ave
Eau Claire, WI 64701
September 11, 2023
C.J. Randazzo
JACC Capital Site
3502 Novak Avenue
Stillwater MN 55082
Via email: cjtandazwQgmail.com
Tony Evers, Governor
Adam N. Payne, Secretary
Telephone (715)8393700
Toll Free 1-e80-9367453lu
T11
SUBJECT: Covemge Under WPDES General Permit No. WI-S06/831-06: Construction Site Storm Water RmoR
Penmince Name: JACC Capital Site
Site Name: JACC Capitol Garages
FIN: 89725
IARTi2�itlit1A
The Wisconsin Department of Natural Resources received you Water Resources Application for Project Permits or Notice of
Intent, on August 09, 2023, for the JACC Capitol Garages site and has evaluated the information provided regarding storm
water discharges Rom your construction site. We have determined Unit your construction site activities will be regulated
under ch. 283, Wis. Stars., ch, NR 216, Wis. Adm. Code, and in accordance with Wisconsin Pollutant Discharge Elimination
System (WPDES)General Permit No. WI-W6/831-06, Construction Site Smrm Water Runoff. All erosion control and
storm water management activities undertaken at the site most be done in accordance with the terms and conditions of the
general permit.
The Sun Date efferent coverage for this site is September 11, 2023. The maximum period of permit coverage for this site
is limited to 3 years from the Start Date. Therefore, permit coverage amomatically expires and terminates 3 years from the
Stan Date and storm water discharges are no longer authorized unless mother Notice of Intent and application fee m retain
coverage under this permit or a reissued version of &a permit is submitted to the Department 14 working days prior to
expiration.
A copy of the general permit along with extensive storm water information including technical standards, forms, guidance
and other documents is accessible on the Departments storm water program Internet site. To obmin a copy of the general
permit, please download it and the associated documents listed below from the following Department Internet site:
hUD://dnr.wLeov/tonic/stormwater/constructioWform&html
• Contraction Site Storm Water fail WPDES general permit No. WI-SO67831-06
• Construction site inspection report form
• Notice of Termination form
If, for my reason, you are unable to access these documents over the Internet, please contact me and I will send them to you.
To come compliance with the general permit, please read it carefully and be sue you understand its contents. Please take
special time of the following requirements (This B not a complete list of the terns and conditions of the general permit):
1. The Construction Site Erosion Control Plan and Storm Water Management Plan that you completed prior to
submitting you permit application most be implemented and maimminnd throughout construction. Failure to do so may
result in enforcement action by the Department.
dnr.mgov F�
materialNaturally WISCONSIN ar
2. The general permit requires that erosion and sediment controls be routinely inspected at least every 9 days, and
within 24 bours after a rainfall event of0.5 inches or greater. Weekly written reports of all inspections must be
maintained. The reports most contain the following infomtation:
a. Date, time, and exact place of inspection;
b. Name(s)of individual(s) performing inspection;
a An assessment of the condition of erosion and sediment controls;
d. A description of any erosion and sediment control implementation and maintenance pert rmsel;
e. A description of the site's present phase of construction.
3. ACertNcate of Permit Coverage must be posted in a conspicuous place on the construction site. The Certificate
of Permit Coverage (WDNR Publication # WT-813) is enclosed for your use.
4. When construction activities have ceased and the site has undergone final stabilization, a Notice ofTemrimation
(NOT) of coverage coder the general permit must be submitted on the Department.
It is important that you rend and understand the terms and conditions of the general permit because they have the force of law
and apply to you. Your project may lose its Permit coverage if you do not comply with its terms and conditions. The
Department may also withdraw, your project from coverage under the general permit and require that you obtain an individual
WPDES permit instead, based on the Departments own motion, upon the filing of a wnren petition by any person, or upon
your request.
If you believe that you have a right to challenge this decision to grant permit coverage, you should know that the Wisconsin
statutes and administrative tales establish time periods within which requests in review Department decisions must be filed.
For judicial review of decision Panamint to ss. 220.52 and 227.53, Wis. Stats., you have 30 days after the decision is mailed,
or otherwise served by the Depamnent, to file you petition with the appropriate circuit court and serve the petition on the
Ueparhnent. Such a petition forjudicial review most name the Department ofNaturnl Resources as the respondent.
To request a contested case hearing Pursuant to s. 227.42, Wis. Scats., you have 30 days after the decision is mailed, or
otherwise served by the Department to serve a petition for hearing on the Secretary of the Department of Natural Resources.
All requests for contested case hearings must be made in accordance with s. NR 2.05(5), Wis. Adm. Cade, and served on the
Secretary m accordance with s. NR 2.03, Wis. Adm. Code. The filing of a request for a contested case hearing is not a
prerequisite forjudicial review and does not extend the 30 day period for filing a petition for judicial review.
Thank you for your cooperation with the Construction Site Storm Water Discharge Permit Program. If you have any
questions concerning the contents of this letter or the general permit, please contact Michelle Asher at (915) 829-5344.
Sincerely,
p��
Teagan Wagner
Northern & West Central Region
Storm Water Program
ENCLOSURE: Certificateof Pemdt Coverage
Page 2
wuoxsix
OEVi.Or HgtUFIL R[SOURCB
UNDER THE
WPDES CONSTRUCTION SITE STORM WATER RUNOFF PERMIT
Permit No. WI-SO67831-06
Under s. NR 216.455(2), Wis. Adm. Code, landowners of construction sites with storm water discharges
regulated by the Wisconsin Department of Natural Resources (WDNR) Storm Water Permit Program are
required to post this certificate in a conspicuous place at the construction site. This certifies that the site
has been granted WDNR storm water permit coverage. The landowner must implement and maintain erosion
control practices to limit sediment -contaminated runoff to waters of the state in accordance with the permit.
EROSION CONTROL COMPLAINTS
should be reported to the WDNR Tip Line at
1-800-TIP-WDNR (1-800-847-9367)
Site Name: JACC Capital Garages
Address/Location: 273 Anderson Scout Camp Trail Town of SOMERSET
Landowner's Contact Person: C.J. Randazzo
Contact Telephone Number: (651) 472-3892
Permit Start Date: September 11, 2023 By: