Loading...
HomeMy WebLinkAbout002-1029-10-000commerce.wi,gov isconsin Department of Commerce Date of Inspection: July 9, 2009 INSPECTION REPORT Project Name: Vrieze Use: Residential Legal Description: SW, NW, 14, 29, 16W Site Number: 749818 Subdivision: Vriezkland II Municipality: Town of Baldwin County: St. Croix Plan Transaction Number: 1688798 Sanitary Permit Number: na Wastewater Flow: 450-600 gpd Persons Present: Jim Thompson SAFETY AND BUILDINGS DIVISION Integrated Services B.,reau 13 East Spruce Sueei Chippewa Falls WI 54725 www.comrnerce wi owsc i 5) 72 -2544 Richard J. Leirenkugei. secretary Plumber Name and Address: Unknown at this time. Certified Soil Tester Name and. Address: James K. Thompson, CST 3602 340 Paulson Lake Lane Osceola, WI 54;20 Owner fume and Address: John Vrieze (Vriezland II, LLC) 110 E. Third St. New Richmond, WI 54017 An onsite soils verification was conducted at the above referenced site as per district policy for all sites with less than four inches of unsaturated soil below the bottom of the A horizon. The intent of this investigation is to confirm initial observations by the certified soil tester (CST) relating to the presence or absence of redoximorphic features in the A horizon and/or subsoil. In -situ soil texture, structure, and consistence factors were also reviewed as they relate to wastewater application rates. Other site conditions such as percent and direction of slope, landscape position Jana surface contour length, and surface water hydrology may also be noted and their effects are factors considered in the recommendations and conclusions portion of this report. Near CST B-2 the soils conditions were found to be as follows: 00-04" 10YR 3/2 sill 2mgr, dsh, aw. 04-07' 10YR 5/3 sill 2msbk parting 1fpl, dsh, as. 07-16 ` 10YR 5/3 sil, 2msbk, dsh, cw, w/f3f 10YR 5/6 rmfs. 16-24" 5YR 4/4 sl till, lcsbk, dh, w/c3d 7.5R 5/8 and 6/2 rmfs. If a mound system is designed to overcome limitations of a high level of seasonal soil saturation and slow permeability, the linear loading rate should not exceed 4.5 gpolft and the basal wastewater application rated should not exceea 0 2 gpd/ftz In addition, on sites with slopes less than 3 percent, the down slope toe slope ratio should be increase to more than 3:1 The additional basal area will partially compensate for the gentle land slope and prevent wastewater leakage at the mound toe. At least 30 inches of sand lift is required when applying septic tank effluent to the distrieution cell of the mound to ensure proper treatment. The longest portion of the mound must be orientated along the contour The mound shall be constructed to divert surface water around the mound structure as much as possible In addition, an up slope drainage ditch should be considered if it is determined that surface or subsurface hydrology is improved by ntercepting water and diverting it away from the mound site. If there are any questions regarding this report, please contact me. Leroy Jane yk PSi, Wastewater Specialist cc: lerey iansky@wisconsin.gov E-mail 7151726-2544 Voice 715/726-2549 Fax ❑ County ❑ CST ❑ Other _ ❑ Plumber El owner