SECTION I. The County Board of Supervisors of St. Croix County,
Wisconsin, regularly assembled, does hereby ordain that such funds as may
be made available to the county for highway work in the year 2002 under
the provisions of Section 20.395 and Chapter 86 of the Statutes, and the
additional sums herein appropriated, shall be expended as hereinafter set
forth:
SECTION II. COUNTY TRUNK HIGHWAY ALLOTMENT: WHEREAS, the Division of
Highways has notified the County Clerk that sum of money estimated to be
one million two hundred eighty -seven thousand two hundred dollars
($1,287,200.00) will be available at the end of the fiscal year under the
provisions of Sections 86.30 and 20.395 of the Statutes, for the county
trunk highway system in the county, but the actual amount will not be
known until the close of the fiscal year ending June 30, 2002.
NOW, THEREFORE, BE IT RESOLVED that the County Transportation Committee
is authorized and directed to expend the said sum to the extent required
to match and supplement federal aid for construction, right of way, and
other costs on any projects located on the county trunk highway system of
said county, which are not recovered from federal funds, and to expend any
balance for constructing, repairing and maintaining such county trunk
highway system and the bridges thereon, including snow and ice removal and
control, as directed in Section 86.30 (7) of the Statutes, and to
reimburse the general fund for any expenditures that may be made therefrom
pursuant to Section 83.01 (6) of the Statutes. The distribution to such
purposes is estimated, but not specifically directed, to be as follows:
SECTION III. WHEREAS, certain additional highway improvements in the
county are necessary and warranted.
NOW, THEREFORE, BE IT RESOLVED that the County Board does hereby
appropriate the following sums for the purpose hereinafter set forth:
(1) The sum of one hundred five thousand dollars ($105,000.00) to match
federal and state funds for construction on the County Trunk Highway
System, to be used toward the following projects as far as funds will
permit:
ESTIMATED CO.
PROJECT LENGTH TYPE OF IMPROVEMENT SHARE
1. CTH "E" Bridge Redeck /Reconstruction $ 210,000.00
2. CTH "GG" Bridge Redeck /Reconstruction 160,000.00
3. Previous year's engineering & ROW funds applied - 20,000.00
4. Previous year's engineering & ROW funds applied - 20,000.00
5. Surface Transportation Program (STP) funds - 225,000.00
(2) The sum of seven hundred nineteen thousand five hundred dollars
($719,500.00) for construction on the County Trunk Highway System toward
the following projects as far as funds will permit:
ESTIMATED CO.
PROJECT LENGTH TYPE OF IMPROVEMENT SHARE
1. CTH "TT" 4.00 miles Widening Construction 322,500.00
2. CTH "I" 2.50 miles Widening Construction 212,500.00
3. CTH "V" 2.60 miles Widening Construction 223,000.00
6. Engineering Various Future Projects 211,500.00
7. Transportation Aids Applied to Construction Projects - 250,000.00
(3) For the maintenance of the County Trunk Highway System, the sum of
one million six hundred twenty -two thousand five hundred four dollars
($1,622,504.00).
(4) For administration, including Highway Department salaries, office
and travel expense, the County Highway Commissioner, his clerks and
assistants not paid from construction or maintenance funds, the sum of
five hundred twenty -eight thousand one hundred eighty -seven dollars
($528,187.00).
(5) For surveying salaries, office and travel expenses, not paid from
Highway Department administration, construction, or maintenance funds, the
sum of one hundred sixty thousand six hundred eleven dollars
($160,611.00).
Total authorized in this section $3,135,802.00