HomeMy WebLinkAbout004-1022-95-000 (5)
A nr' IGINAL~
soon n SOIL EVALUATION REPORT #2383
Department of Commerce in accordance wit m 85, Wis. Adm. Code Page 1 of 3
Division of Safety and Buildings Certified Soil Testing, LLC
County
Attach complete site plan on paper not less than 8'/z x 11 inches in ' e. mu St. Croix
include, but not limited to: vertical and horizontal reference point (BM , irecti
percent slope, scale or dimensions, north arrow, and location and distan to ne st rA&d Parcel I.D.
lot 5
Please p u R"i wed By
D t Personal information you provide may be e u d for s~j d~~c{Rslvacy L w, s. 15.04 (m)). ~j t6106
Property Owner roperty Location
Ofstie, Darin AUG 0 3 M7 ovt. Lot NE1/4, SE1/4, S10, T28N, R15W
Property Owner's Mailing Address of # Block # Subd. Name or CSM#
2104 Pierce/St. Croix Road ST. CROIX COUNTY 5 Pond View Acres
City State ❑ City Village ® Town Nearest Road
Baldwin WI 54002 715-684-3299 Cady 310Th St.
New Construction Use: Residential / Number of bedrooms 3 Code derived design flow rate 450 GPD
Replacement Public or commercial - Describe:
Parent material loess over till Flood plain elevation, if applicable NA ft.
General comments install 3.75'x 120' rock cell mound on 100.0 contour as upslope edge of rock w/ 2.5' sand fill w/
and recommendations: state/county approval for interpretive determination
Boring
Boring # I
1
X Pit Ground surface elev. 99.2 ft, Depth to limiting factor 0 in. Soil Application Rate
Horizon Depth Dominant Color, Redox Description Texture Structure Consistence Boundary Roots GPD/ft=
in. Munsell Qu. Sz. Cont. Color Gr. Sz. Sh. 'Eff#1 •Eff#2
1 0-9 7.5YR 3/3 - sil 2 f sbk mvfr cs 1M .6 .8
2 9-13 10YR 4/4 f2d 7.5YR 4/6 sil 2 f-m pi mvfr gs 1M 0 .2
3 13-18 7.5YR 4/4 f2d 7.5YR 4/6 sil 1 m sbk mvfr gs lm .4 .6
4 18-22 7.5YR 4/4 f2d 7.5YR 4/6,5/3 sl 0 m mvfr gw 1m .2 .6
5 22-26 10YR 4/4 c2d 7.5YR 4/6,5/3 Ifs 0 sg ml gs - .5 1.0
6 26-34 5YR 4/6,5/8 cap 10YR 6/2 fsl 0 m mvfr - - .2 .5
lacks A+4"; presumptive limit is 0"; deep chisel plow to reorient H2 platy structure
-'Boring
❑ Boring # -
X Pit Ground surface elev. 99.9 ft. Depth to limiting factor 0 in. Soil Application Rate
Horizon Depth Dominant Color Redox Description Texture Structure Consistence Boundary Roots GPD/ft'
in. Munsell Qu. Sz. Cont. Color Gr. Sz. Sh. •Eff#1 •Eff#2
1 0-7 7.5YR 3/2 - sil 2 m gr mvfr cs lm .6 .8
2 7-12 7.5YR 3/2 f1f 7.5YR 3/4 sil 1 m sbk mvfr Cs im .4 .6
3 12-20 10YR 4/3 1 m2OYR 6/ 6/3 4/6 sil 1 m p1 mvfr gs lm .4 .6
4 20-24 7.5YR 4/3 f2d 7.5YR 4/6,5/3 sl 0 m mvfr cs 1m .2 .6
5 24-36 7.5YR 5/2 m3p 7.5YR 5/8 sicl 0 m mfi - if 0 0
lacks A+4"; presumptive limit is 0"; H2 sbk occasionally parts to 1 f pl; 1 f roots to 32"
Effluent #1 = BOD5 > 30 < 220 mg/L and TSS >30 < 150 t #2 = BOD < 30 mg/L and TSS < 30 mg/L
CST Name (Please Print) Signatu 4:7N CST Number
Henry F. Grote 222774
Address Certified Soil Testing, LLC Date Evaluation Conducted Telephone Number
E. 4366 353rd Ave. Menomonie, WI 54751 10/10/2005 715-233-0398
SBD-8330 (R.07/00)
Property Owner OfStle, Darin Parcel ID # lot 5 Page 2 of 3
w
3 Boring
❑ Boring # n pit Ground surface elev. 100.1 ft. Depth to limiting factor 26 in. Soil Application Rat
Horizon Depth Dominant Color Redox Description Texture Structure Consistence Boundary Roots GPD/ft2
in. Munsell Qu. Sz. Cont. Cola Gr. Sz. Sh. `Eff#1 'Eff#2
1 0-6 7.5YR 3/3 - sil 2 m gr mvfr gs lm .6 ! .8
2 6-11 7.5YR 3/3 - sil 1 f-m sbk mvfr CS 1m .4 .6
3 11-17 7.5YR 4/3 - sil 1 m sbk mvfr gw lm .4 6
4 17-26 7.5YR 4/6 - sl 0 m mfr gw lm .2 .6
5 26-45 7.5YR 4/6 - sl 0 m mfi - lm .2 .6
H6 is very tight w/ lots of gr & cob; effective BR
4 Boring
Boring # Pit Ground surface elev. 99.5 ft. Depth to limiting factor 0 in.
Soil Application Rat
Horizon Depth Dominant Color Redox Description Texture Structure Consistence Boundary Roots GPD/ft'
in. Munsell Qu. Sz. Cont. Cola Gr. Sz. Sh. 'Eff#1 `Eff#2
1 0-4 7.5YR 3/2 - SO 2 m gr mvfr gs 1m .6 .8
2 4-8 j 7.5YR 3/2 fld 7.5YR 3%4 sil 1 m sbk mvfr cs lm .4 .6
--r-
c2d 7.5YR 4/6
3 8-17 1 10YR 5/4 10YR 6/2 sil 1 f-m pl mvfr gs lm .4 .6
4 17-22 ! 10YR 5/4 c2d 7.5YR 4/6 fsl 0 m mvfr cs lm .2 .5
10YR 6/2
5 22-32 7.5YR 3/3 c2d 7.5YR 4/6 sicl 1 m-c sbk mfi - if .2 .3
lacks A+4"; presumptive limit is 0"; avoid this area
5 Boring
Boring # Pit Ground surface elev. 100.0 ft. Depth to limiting factor 0 in.
Soil Application Rat
Horizon Depth Dominant Color Redox Description Texture Structure Consistence Boundary Roots . GPD/ft=
in. Munsell Qu. Sz. Cont. Cola Gr. Sz. Sh. •Eff#1 `Eff#2
1 0-6 7.5YR 3/3 - sil 2 m gr mvfr gs lm .6 1 .8
2 6-8 7.5YR 3/3 - A 1 f-m sbk mvfr cs im ,4 6
3 8-13 10YR 4/3 f1f 7.5YR 4/6 sil 1 m sbk mvfr gs lm .4 .6
c2d 7.5YR 4/6
4 13-18 I 10YR 4/3 lOYR 6/2 fsl 0 m mvfr gs lm 1 .2 5
5 18-38 10YR 4/3 m2p 7.5YR 4/6 fSl 0 m mfr - - 2 5
-
I
lacks A+4"; presumptive limit is 0'; H3 has f2d 7.5YR 4/6 - 10YR 6/3 redox below 10"; H5 has some inclusions sicl & scl
` Effluent #1 = BODJ > 30 < 220 mg/L and TSS >30 < 150 mg/L ' Effluent #2 = BOD5 < 30 mg/L and TSS < 30 mg/L
The Department of Commerce is an equal opportunity service provider and employer. If you need assistance to access services or
need material in an alternate format, please contact the department at 608-266-3151 or TTY 608-264-8777.
SBD-8330 (R.07/00) Certified Soil Testing, LLC
~oww~, Cw
CL
I4 sib
117
0 4-,o
~~i z.q b~
Safety and Buildings
commerce.wi.gov 4003 N KINNEY COULEE RD
RECEIVED LACROSSE Wl 54601-18311
TDD (608) 264-8777
iscon'sin JUN 2 5 2007 "~"'"cowww.wis onsn.gov
t)ep irtment of Commerce
ST. CROIX COUNTY Jim Doyle, Governor
Mary P. Burke, Secretary
March 10, 2006
CUST ID No. 222774 A7TN: POWTS Inspector
HENRY F GROTE ZONING OFFICE
CERTIFIED SOIL TESTING ST CROIX COUNTY SPIA
E4366 353RD AVE 1101 CARMICHAEL RD
MENOMONIE WI 54751 HUDSON WI 54016
CONDITIONAL APPROVAL
PLAN APPROVAL EXPIRES: 03/10/2008 Identification Numbers
Transaction ID No. 1240465
SITE: Darin Ofstie Site ID No. 709674
Town of Cady, St Croix County Please refer to both identification numbers;
NEIA, SE1/4, S10, T28N, R15W above, in all corres ondence with the agency-
Proposed Lots: 1-3, 5, 7, 8, and 25
FOR: Object Type: Soil Saturation Determination Regulated Object ID No.: 1062716
The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes
and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in
chapter 101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements.
The following conditions shall be met during construction or installation and prior to occupancy or use:
1. Approval is hereby granted pursuant to s. Comm 85.60(2), Wis. Adm. Code, to estimate the depth to seasonal soil
saturation based on an interpretive determination process. Approval of the interpretive determination negates the
requirement in s. Comm 85.30(2)(b), Wis. Adm. Code to designate the ground surface as the highest level of soil
saturation when redoximorphic features are less than 4 inches below the bottom of the A horizon.
2. The estimated highest level of prolonged soil saturation approved under this determination is 6 inches below
grade. At least 30 inches of sand lift on top of 6 inches of unsaturated, in-situ soil is required for adequate treatment.
and dispersal.
3. The basal soil application rate for the mound shall be 0.2 gpd/sf, and the linear loading rate <3.5 gpd/ft for lots 1,
2, 5, 7, and 8, and <4.0 gpd/ft for lots 3 and 25.
4. Note that lot 7 has a restricted area for mound installation and is limited to a 2-bedroom home (300 gpd design
flow).
5. Chisel plowing to a depth of 16 inches immediately prior to sand placement is required to improve vertical water
movement into the soil solum.
6. Landscaping up slope of the mound shall be incorporated into the POWTS design to prevent surface water from
concentrating along the up slope edge of the mound and to divert surface water drainage away from the system. See
comments by the Certified Soil Tester regarding landscaping requirements for each lot.
7. This approval shall remain valid unless the site is altered in such a way that the depth to soil saturation would
change or if saturated conditions are observed for seven consecutive days at depths less than 3 feet below the
infiltrative surface of the POWTS distribution component.
8. This approval in no way relinquishes the use of color patterns to estimate the depth to high groundwater on any
other parcels or portions of parcels.
9. A copy of this approval letter and attachments must accompany the mound system design for this site for purposes
of plan approval and sanitary permit issuance.
10. Even though lots 4, 27, and 28 are discussed in the attached report, they have not been approved for a POWTS.