Loading...
HomeMy WebLinkAboutResolution 1992 (56) RESOLUTION NO. „,VD (- COUNTY AID CONSTRUCTION AND MAINTENANCE DURING THE CALENDAR YEAR 1993 SECTION I. The County Board of Supervisors of St. Croix County, Wisconsin, regularly assembled, does hereby ordain that such funds as may be made available to the county for highway work in the year 1993 under the provisions of Section 20.395 and Chapter 86 of the Statutes, and the additional sums herein appropriated, shall be expended as hereinafter set forth: SECTION II. COUNTY TRUNK HIGHWAY ALLOTMENT: WHEREAS, the Division of Highways has notified the County Clerk that sum of money estimated to be eight hundred thirty thousand dollars ($830,000.00) will be available at the end of the fiscal year under the provisions of Sections 86.30 and 20.935 of the Statutes, for the county trunk highway system in the county, but the actual amount will not be known until the close of the fiscal year ending June 30, 1993. NOW, THEREFORE, BE IT RESOLVED that the County Highway Committee is authorized and directed to expend the said sum to the extent required to match and supplement Federal aid for construction, right of way, and other costs on any Federal projects located on the county trunk highway system of said county, which are not recovered from Federal funds, and to expend any balance for constructing, repairing and maintaining such county trunk highway system and the bridges thereon, including snow and ice removal and control, as directed in Section 86.30 (7) of the Statutes, and to reimburse the general fund for any expenditures that may be made therefrom pursuant to Section 83.01 (6) of the Statutes. The distribution to such purposes is estimated, but not specifically directed, to be as follows: SECTION III. WHEREAS, it appears that certain additional highway improvements in the county are necessary and warranted. NOW, THEREFORE, BE IT RESOLVED that the County Board does hereby appropriate the following sums for the purpose hereinafter set forth: (1) The sum of three hundred thirty one thousand two hundred dollars ($331,200.00) to match Federal Funds for construction on the County Trunk Highway System, to be used toward the following projects as far as funds will permit: CTH ESTIMATED CO. PROJECT LENGTH TYPE OF IMPROVEMENT SHARE 1. 90 -C -1 2.40 miles Complete construction $ 0.00 2. 93 -I -1 2.25 miles Complete construction 116,000.00 3. 93 -H -1 2.00 miles Spot improve & overlay 44,000.00 4. 93 -E &T -1 Bridge Replacement 38,000.00 5. 93 -M -1 (HH) Bridge Deck replacement 11,200.00 6. 93 -Y -1 Bridge Deck replace & substructure 116,000.00 7. Safety RR Crossings Safety enhancement projects 6,000.00 (2) The sum of two hundred twenty five thousand dollars ($225,000.00) for construction on the County Trunk Highway System toward the following projects as far as funds will permit: CTH ESTIMATED CO. PROJECT LENGTH TYPE OF IMPROVEMENT SHARE 1. 92 -N -1 1.75 miles Project completion $ 0.00 2. 93 -D -1 1.25 miles Project completion 140,000.00 3. Engineering Future projects 85,000.00 (3) For the maintenance of the County Trunk Highway System, the sum of one million five hundred and nine thousand dollars ($1,509,000.00). (4) For administration, including Highway Department- sa.14J ies, office and travel expense, the County Highway Commissioner,. clerks and assistants not paid from construction ors09taintenance fun ; the sum of three hundred thirty three thousand one hed dollars ($3,,100.00). 124