HomeMy WebLinkAbout008-1008-50-000(2)
III
CROIX COUN"Pf
I
PLANNING & ZONING
September 7, 2012 File LU87575
Nicole Fulton
Global Signal Acquisitions
11 Grandview Circle, Suite 220
T a Canonsburg PA 15317
Y 7'Z' N
Re: Land use permit for a Sprint co-location,
Code Administracrori on an Existing tower at 553 County Hwy. BB,
715-386-4680 Baldwin WI 54002
Parcel # 008-1008-50-000
Land Information
Planning Dear Ms. Fulton:
715-386-4674
This letter confirms zoning approval according to the plans you have submitted to the
4677 Planning and Zoning Department to replace and add telecommunications equipment on an
715Real-33868G--4677
existing wireless communication tower located on property listed above. Staff finds that the
Recycling project meets the applicable tower provisions in Sections 17.82 17.85, 17.86, and 17.87, of the
7J5-386-4675 findings:
St. Croix County Zoning Ordinance based on the following 1. Approval of this land use permit includes the replacement and addition of
ti telecommunications equipment on a 250 foot existing tower. A list of these
replacements and additions is on pages 3 and 4 of the structural analysis report, dated
June 28, 2012.
2. The existing tower has the capacity to structurally support the proposed new
equipment according to the structural analysis that was prepared by Peter G.
Jernigan, Jr., professional engineer.
3. A certificate of liability of insurance has been submitted.
4. Co locating . on a tower is a permitted with a land use permit in the Ag. Residential
Zoning District.
5. The tower site is screened with trees.
6. Fencing appeared to be in good condition on my site visit in 2011.
7. The colors of the components are gray and will match the existing tower.
8. A letter from Waterford Consultants has been submitted verifying this facility will not
cause interference with public safety communication systems.
9. A site lease agreement between Crown Castle and Arthur Jensen has been submitted.
10. Parking and access are adequate for this site.
This permit has been issued to Global Signal Acquisitions with the following conditions;
1. The applicant shall contact the Planning and Zoning Department at least five days prior to
commencing installation of the proposed antennae and equipment.
2. The applicant shall inform the Zoning Administrator when construction is complete and
submit photos of the completed antennae and equipment.
3. The applicant shall have one (1) year from the issuance of this land use permit to complete
COriStfllGtiO]y,~~tll?rmit F+xni7ac the. anlLlantW'nyiradAQ. -
permit. ST. CROIX COUNTY GOVERNMENT CENTER
1 101 CARMICHAEL ROAD, HUDsoN, W1 54016 715386,4686 FAX
PZLaCO. SAINT-CROIX. WI. US W W W.CO. SAI NT-CROIX. W I.US
4. The applicant shall notify the Zoning Administrator of any change in name or ownership of the
approved facilities and provide new contact information for the purpose of keeping the file
updated.
5. Any minor change (or addition) in the project shall require prior review and approval by the
Zoning Administrator. Any major change and/or addition to the originally approved plans
will require the submittal of a new land use permit application.
6. Within 12 months of cessation of operation or use of the wireless facilities, all unused
antennas and equipment shall be removed at the applicant's expense. After the facilities are
removed, the site shall be restored to its original condition or an improved condition.
This approval does not allow for any structures (temporary or permanent), activities, or
development beyond the limits of this request. Your information will remain on file in the St.
Croix County Planning and Zoning Department. Please contact the Town of Eau Galle to obtain the
necessary building permits for the proposed construction. It is your responsibility to ensure
compliance with any other local, state, or federal rules or regulations.
Pleas call if you have any questions.
Sincerel
Alex Blackburn
Zoning Administrator/ Zoning Specialist
cc:
Kevin Provance (by e-mail)
Clerk, Town Eau Galle
Eric: Land Use Permit LU87575
III