HomeMy WebLinkAbout030-1079-60-000
ST CROIX COUNTY
PLANNING & ZONING
March 16, 2012 File#: LU87423
Y St. Croix County Parks
3 c/o Bob Heise, LWCD
r 19608 th Ave..
Baldwin, WI 54002
Code Administration Re: Land Use Permit, Filling and Grading < 10,000 sq. ft. in the Shoreland District
715-386-4680 Homestead Parklands, 550 Perch Lake Rd.
Land Information Parcel #28.30.19.288, Town of St. Joseph
Planning
715-386-4674 Dear Mr. Heise:
Real Prope This letter confirms zoning approval according to the plans you have submitted for
715-3$ 677 filling and grading an area of 6800 square feet within 300 feet of the Ordinary High
Water Mark (OHWM) of Perch Lake to construct trail, a shelter building, and steps for
Regis cling structural erosion control on the property referenced above in the Town of St.
M-386-4675 Joseph.
Staff finds that the proposed project meets the spirit and intent of the St. Croix County
,l Zoning Ordinance and Shoreland District with the following findings:
1. Filling and grading less than 10,000 square feet in area less than 300 feet from
the OHWM on slopes less than 25 percent measured over a horizontal distance
of 50 feet is allowed with a land use permit in the Shoreland District pursuant to
Sections 17.29(2)(c) of the St. Croix County Zoning Ordinance;
2. Land disturbance activities for public improvements affecting slopes 25 to
29.9% measured over horizontal distance of 50' requires a land use permit
pursuant to Sections 17.12(8) and 17.12(9) of the St. Croix County Zoning
Ordinance;
3. A 16' x 20' shelter building is proposed for this project,
4. Project will include filling and grading of -850 linear feet of trail and timber stairs
will be built in highly erodible sections of trail, which will utilize a combination of
crushed rock and timber steps anchored into the ground that will prevent
erosion on steeper sections of foot trail;
5. The shoreline of the lake is currently unimproved and is vegetated with trees
and typical woodland undergrowth. A rain garden plan was submitted, which
will have the capacity to infiltration 48 cubic feet of stormwater runoff from the
shelter roof. With conditions for maintaining the current level of native
vegetative cover along the shoreline to preserve wildlife habitat and provide
infiltration of storm water runoff from impervious surfaces and any disturbed
areas consistent with the standards in the Shoreland District, the natural beauty
and ecology of Perch Lake will be protected;
6. The St. Croix County Land and Water Conservation Department has been
responsible for developing the plans and will oversee the excavation of the trail,
installation of erosion and sediment control mats, and construction of the
ST.CRO/X COUNTY GOVERNMENT CENTER
110 1 CARMICHAEL ROAD, HUDSON, Wl 54016 715386,4686 FAx
PZ@CO.SA/NT-CROIX.WI. US WWW.CO.SAINTCROIX.WI.US
S, r, rain gar en, an im er steps. i con i ions a s a ,
in'
.tallation of matting and steps, and ensure that appropriate stabilization for exposed soil is applied
immediately after completion, the water quality of Perch Lake will not be impaired ; and
7. a Wisconsin Department of Natural Resources has been sent a copy of the application for review.
A permit will not be required unless the grading were to exceed 10,000 sq. ft. within the 75-foot
setb om the OHWM of Perch Lake.
8. Wit itions stipulated above, this project will meet the spirit and intent of the county ordinance
Se 7.26.(3)(b) to prevent and control water pollution and Section 17.02 since it will not
ne y affect the public health, safety and welfare of County residents.
Based on th findings, approval of the land use permit is subject to the following conditions:
1. Prr to commencing construction, the applicant shall obtain any permits required by Federal,
St' , or town regulations for this project.
2. The pplicant shall be responsible for supervision of any laborers and implementation of the
ap oved project plan in compliance with these conditions.
3. a applicant shall install approved stormwater management device (rain garden) that will
infiltrate runoff from the shelter roof as required in 17.29(2)(c)3.
4. The applicant shall install and maintain erosion and sediment control measures as proposed
in plan submitted in order to prevent contaminated runoff from reaching Perch Lake until
permanent stabilization has been successfully established on all disturbed areas of the site.
Fns 5. The current level of native trees, shrubs, and groundcover along the shoreline shall be
maintained.
6. Within 30 days of completing construction of the shelter, the applicant shall submit to the Zoning
- Administrator photos of the completed project as viewed from all angles.
This X
a oval does not allow for any additional construction, structures or structural changes,
grading, ling, or clearing of vegetation beyond the limits of this request. Your information will
remain file in the St. Croix County Planning and Zoning Department. It is your responsibility
to ens tae compliance with any other local, state, or federal rules or regulations, including
obtaini a building permit from the Town of St. Joseph.
Please I free to contact me with any questions or concerns.
G2',liyvr.~-
Pamela QUi
Zoning Specarist/Zoning Administrator
Enc: Lan le Permit #LU87423
Cc: Tod Dolan, Building Inspector, Town of St. Joseph
teve Olson, St. Croix County Land and Water Conservation Department
ike Wenholz, Wl Department of Natural Resources
ST. CRO/X COUNTY GOVERNMENT CENTER
110 1 CARM/CHAEL ROAD, HUDSON, W/ 54016 7153864686 FAX
PZPCO. SAINT-CRO/X. W/. US W W W. C O.SAINT-CROIX. WI. US
sr er, rain gar en, an im er s eps. i con al ions ha CD s a s pervise e e ca ion,
i nstallation of matting and steps, and ensure that appropriate stabilization for exposed soil is applied
irpmediately after completion, the water quality of Perch Lake will not be impaired ; and
7. a Wisconsin Department of Natural Resources has been sent a copy of the application for review.
A permit will not be required unless the grading were to exceed 10,000 sq. ft. within the 75-foot
setba from the OHWM of Perch Lake.
8. Wit itions stipulated above, this project will meet the spirit and intent of the county ordinance
See ' 7.26.(3)(b) to prevent and control water pollution and Section 17.02 since it will not
negly affect the public health, safety and welfare of County residents.
T'K
Based on these findings, approval of the land use permit is subject to the following conditions:
1. Prier to commencing construction, the applicant shall obtain any permits required by Federal,
Stag, or town regulations for this project.
2. The pplicant shall be responsible for supervision of any laborers and implementation of the
ap roved project plan in compliance with these conditions.
3. a applicant shall install approved stormwater management device (rain garden) that will
infiltrate runoff from the shelter roof as required in 17.29(2)(c)3.
4. The applicant shall install and maintain erosion and sediment control measures as proposed
in plan submitted in order to prevent contaminated runoff from reaching Perch Lake until
permanent stabilization has been successfully established on all disturbed areas of the site.
5. The current level of native trees, shrubs, and groundcover along the shoreline shall be
maintained.
6. Within 30 days of completing construction of the shelter, the applicant shall submit to the Zoning
Administrator photos of the completed project as viewed from all angles.
This approval does not allow for any additional construction, structures or structural changes,
grading,, lling, or clearing of vegetation beyond the limits of this request. Your information will
remain o~nlfile in the St. Croix County Planning and Zoning Department. It is your responsibility
to ensue compliance with any other local, state, or federal rules or regulations, including
obtainui a building permit from the Town of St. Joseph.
Please eel free to contact me with any questions or concerns.
Pamela Qui n
Zoning Spe 1st/Zoning Administrator
Enc: Lan se Permit #LU87423
Cc: To -'d Dolan, Building Inspector, Town of St. Joseph
e Olson, St. Croix County Land and Water Conservation Department
ike Wenholz, WI Department of Natural Resources
ST. CRO/X COUNTY GOVERNMENT CENTER
1 10 1 CARM/CHAEL ROAD, HUDSON, Wi 54016 7153864686 FAX
RZ@CO.SA/NTCROX W. US W W W.CO.SAINTCROIX. WI. US