Loading...
HomeMy WebLinkAbout002-1059-30-000(3) S"f CROIX COUN"I &A IL WPLANNING ZONING { September 21, 2012 File#: LU87595 Dan Luckwaldt 2606 County Highway D ' Woodville WI 54028 Re: Land Use Permit for an animal waste storage facility located in the SWof section 24, T29N, R16W, Town of Baldwin. Code A&ninistmaon 715-386-4680 Dear Mr. Luckwaldt: Land Information This letter confirms zoning approval for a Construction Permit according to the plans you Planning have submitted for an animal waste storage facility at the location referenced above. Your 715-386-4674 permit application for a livestock facility is not approved yet. Staff finds that the proposed project meets the requirements of the St. Croix County Animal Waste Storage Facility Real Property Ordinance and the St. Croix County Zoning Ordinance with the following findings: 715-3f G-44677 1. An animal waste storage facility is subject to the Animal Waste Storage Facility 1 9 Y Re clue g 715-386-4675 Ordinance and Zoning requirements. 2. An animal waste storage facility is allowed with a land use permit in the Agricultural District pursuant to Section 11.3 A. of the St. Croix County Animal Waste Storage Facility Ordinance. . 3. The proposed storage facility meets the required setbacks.-pursuant to section 17.12 (13) of the St. Croix County Zoning Ordinance. 4. The applicant submitted a manure storage facility plan that includes; DNR approval, engineered plans, project descriPtion well information management and site assessments, soils investigation, design calculations operation and maintenance plan, . 1 and a construction observation plan. 5. The proposed manure storage facility is not located in a floodPlain or shoreland area. 6. The St. Croix County Land and Water Conservation Department has reviewed the above information listed under #4 and recommends conditional approval of the land use permit. Based on these findings, approval of the land use permit is subject to the following conditions: 1. After completion of the structure the applicant shall provide an as built drawing certified by an engineer that the structure meets standards. The applicant must 5. provide the as-built prior to use of the structure and obtain an operations permit from the County. 2. The applicant shall supply the LWCD with a certified 590 nutrient management plan annually. 3. Any modifications require approval from the Code Administrator. 4. Upon transfer of ownership a written notice shall be submitted to the Zoning Administrator. 5. This permit is valid for one year. A request can be made for one additional year. 6. If this operation ceases operations for a period of 24 months this pit shall be closed according to 11.3 E of the Animal Waste Storage Facility Ordinance. ST. CRO/X COUNTY GovERNMENT CENTER 1 101 CARMICHAEL ROAD, HUDSON, Wi 54016 7153864686 FAX PQ?C0.64INTLCR01X. W1. U5 W W W.CO. SAINT-CROIX. W I. US i i This approval does not allow for any additional construction, structures or structural changes, grading, filling, or clearing of vegetation beyond the limits of this request. Your information will remain on file in the St. Croix County Planning and Zoning Department. It is your responsibility to ensure compliance with any other local, state, or federal rules or regulations, including obtaining a building permit from the Town of Baldwin. Please feel free to contact me with any questions or concerns. Sincerely, Ax Alex Blackburn Zoning Specialist/Zoning Administrator Enc: Land Use Permit Cc: Dennis Marquardt, Tiry Engineering Inc., PO box 44, Chippewa Falls, WI 54729 Town of Baldwin Clerk Steve Olson, St. Croix County Land and Water Conservation Department Bob Baczynski, Wisconsin Department of Natural Resources, 890 Spruce St. Baldwin WI 54002