HomeMy WebLinkAbout040-1103-60-110
COUNTY
ST@C
PLANNING & ZONING
:.::.:}.sr .:...:L»::cpy:...\».:.::.:..GL»l:,.a:::.:C..,.S:f .x::...................r.,..,.»a....:.:.y:...:.... :.✓:>:.:w:i::kre>r:::e:..»::.u::::k?J'at?D3f'3:33.::::').:..:.','.q;La4'R§`.
':k:%':'I:X93.:::~:: y:<!;..O:t>SAR ::w:riQYCY/.av:Y:,-: F :..~~tY15:2keiYRD'~'
November 6, 2.,, 012 File LU87635
Global Signal Acquisitions 2 LLC
Nicole Fulton
'r 11 Grandview Circle, Suite 220
Can onsburg PA 15317
w . Re- Land use permit for a Sprint Tower co-location on an existing tower at 188A
Radio Road, River Falls WI 54022
Code Administratii Parcel # 040-1103-60-110
715-386-4680
Dear Ms. Fulton:
Land Information &J.?
Planning
715-386-4674 ' This letter confirms zoning approval according to the plans you have submitted to the
Planning and Zoning Department to replace and add telecommunications equipment on an
existing wireless communication tower located on property listed above. Staff finds that the
Real Presrty
715s s-4677 project meets the applicable tower provisions in Sections 17.82 17.85, 17.86, and 17.87, of the
St. Croix County Zoning Ordinance based on the following findings:
R clung
-386-4675
1. Approval of this land use permit includes the replacement and addition of
-f telecommunications equipment on a 250 foot existing Crown Castle tower. A list of
r<' these replacements and additions is on the page 3 of both of the structural analysis
reports, dated May 16, 2012. One structural analysis is for the tower with the newly
x : added components and the other is for the tower with the newly added equipment AND
<<., the deletion of some of the old equipment. Both of these reports show that the tower
will support the added equipment.
~xn
2. The installation plans were prepared by Aaron Poot, a professional engineer.
3. A copy of the lease has been submitted.
4. A certificate of liability of insurance has been submitted.
r 5. This is the only tower located on this property.
6. The tower is screened by the natural vegetation.
7. The tower is painted light blue.
ztt„ 8. Parking and access are adequate for this site.
t<>
9. Co locating on a tower is a permitted with a land use permit in the Agricultural Zoning
District.
10. A letter from David Kirk a Radio Frequency Engineer has been submitted verifying this
SM,
:L facility will not cause interference with public safety communication systems.
I:
This permit has been issued to Crown Castle with the following conditions;
1. The applicant shall contact the Planning and Zoning Department at least five days prior to
commencing installation of the proposed antennae and equipment.
2. The applicant shall inform the Zoning Administrator when construction is complete and
f ` submit photos of the completed antennae and equipment.
ST. CRO/X COUNTY GOVERNMENT CENTER
1101 CARM/CHAEL ROAD, HUDSON, W/ 54016 7153864686 FAX
PZPCO.SA/NT-CROIX. W. US wWNV. CO.SAI NT-CROIX. WI. US
5£9L8IYI;iUuad asfl puEZ :oug
at
i.3
ltEUt-a ,fg aoUenotd utnax
xo.zs, 3o umoZ `}Ii013
S£t,SS NW U012uiut0019 `OZ6 a;mS anuanV 0ouei3 09LL `2?uR3-0-4u00 pUei.tanp
:oo
;si oad SumoZ /3o;e.I;stujtuP`d 2uiu0
.i et S Z
uingxoujg xalV
,10.1aouls
soot;sanb Xue aneq noX 3t iieo seaid
•suot;Elaw .zo saltu IE.tapa3 .to `a;U;s `pool laq;o Xue q;inn aoum duioo
amsua o; ,44tligisuodsai moX si 11 •uoi;ongsuoo pasodoid oq; ioj s;iUUad 2uipitnq,Cmssaoau
aq; ute;go o; iotL jo unnol aq;;oe;uoo aseald •;uam;.tedaQ 2utuoZ pue 2utuuul l 44unoo xtozo
;S aq; Ui alg uo umula.t Ilion uot;euuojtn mok -Isanbaa sigj;o sl!mi aqj puofaq juawdolanap
qint;an l(juaueniaad ao f isaocIuia;) sa injan ids ~fuE .1 A& f8 you saop l8no 1dd8 sigy
.Io Isai
•UOi;ipuoo panoidutt ue 1o uoi;ipuoo luu 2uo s;t o; paio;sai oq llegs a;is aq; `panotUa.t
ase sat;tlioej aq;.tavv •asuadxa s jueotldde aq;;v panomai aq lings;uauzdmba put, sEUua;Ue
posnun lle `sDgMoej ssolwyA aq; jo asn so not;eiodo jo not;lssao jo sq;uout ZI utgpAA, •8
•uoi;Eoilddu ;tuuod asn puel nnau a jo lUuiuigns aq; a nnba t Ipm
sueld panotdde XIleutouo aq; o; uot;tppe io/puE a2uego io f7euz XUV •1o;e4stututpV 2utuoZ
aq; Xq lenoidde pus nnainai loud a.nnbw begs ;oofotd aq; ui (uoutppu to) afuego .toutra XUV -L
Tojupdn
alg aq; 2iuidaa3l jo asodmd aq;.toj uo!puuojtn;ouluoo maU aptnozd puE sagtli oej panotddn
aq; jo digs taunno zo auteu ut a2uetlo Xue 3o to;e lisnnutpVuittoZ aq; you pegs ;Ueoildde aq L • 9
;tuuad
asn puel enau a amoos o; pa.nnbaz aq ULA&;uuogdde xp `sandxa;tuuad aq;jj •uoi zisuoo
a;aldmoo o;;tuuod asn puel snp jo aouensst aq; mog leaf (l) auo aneg hugs ;ueotldde aq,L • S
u5mol aqj ga;eui o; anlq ~g II palure aq llugs s;uauo moa pappe aqs, •t,
•.ianso,L
oipEg 2iA3AA, uuogg iau aqj no 155ga on si aiagl os paunjap aq lings aaesol aq,L
Sprln.,
'~pr+ritTlextel David XJ rlc
622fl Spr -A'. ar kway, KSOPHD0514-56870 Rf Engineer 11 x
TvgefherwhlNIXTEL ai Overiand Park, XS 6625i Regulatory Cflmplrarrc~
} n s_ Jffice (913) 315-1878 fax: X913) 523-fK36 "
'.A 'r "„~iR 3 Skr
November 6, 2012
Mr. Alex Blackburn
Zoning Specialist
St. Croix County, Wisconsin
Planning & Zoning Department
1101 Carmichael Road
Hudson, WI 54016
RE: Sprint Nextel Site No. MS54XC099
188A Radio Road, River Falls, WI 54022
i
Dear Mr. Blackburn,
This responds to your request regarding the proposed Sprint Nextel wireless
telecommunications facility referenced above.
Sprint Nextel designs, constructs and operates its wireless telecommunications
facilities to comply with the Federal Communications Commission rules and regulations.
Sprint Nextel will undertake best efforts to prevent harmful radiofrequency interference
from its wireless telecommunications facilities to other authorized wireless
telecommunications operators in the surrounding area, including those related to public
safety.
Sprint Nextel is licensed to provide Broadband PCS radio service in St. Croix
County, Wisconsin.
If you have any questions, please call me directly.
Sincerely,
David Kirk
National RF Engineering