Loading...
HomeMy WebLinkAbout008-1007-80-100 ORDINANCE DECISION TREND ANALYSIS Data Collection/Analysis Would Include: Initial Data Computer/Property I.D. # D /0 0 - 0 " Owner's Name -Sk Property Address Zoning District A2 AG C_"!/ RES COM IND Past Zoning A2 AG AR RE S COM IND Overlay District NONE SHORELAND WETLAND FLOOD PLAIN RIVERWAY Location Section, Town, Range, Lot• Acres__ ( N e N a Request Date " 3 0 - rp Disposition DENIED APPROVED WITHDRAWN POSTPONED Date Activity Rezoning / Varian Special Exception Type of Variance/Special Exception ~ru~ wr.O / ROAD/HWY. SETBACK WATER SETBACK BLUFFLINE SETBACK LOT RATIO DRIVEWAY SEPARATION NONCONFORMING LOT SIZE Ordinance Citation Supporting Evidence Description 01 PLOT MAP/PLAN SITE PLAN OWN APPROVAL LTR CSM PHOTOS MAPS SOIL TEST Hardship YES NO Linked to Rezoning YES NO Conditions EXPIRATION DATE COMPLETION ACCORDING TO PLAN ALL PERNUTS COMPLETE NING OFFICE ACCESS & NOTIFICATION UPON COMPLETION EROSION CONTROL Objections YES NO Parcel 008-1007-80-100 04/08/2010 02:56 PM PAGE 1 OF 1 Alt. Parcel 03.28.16.35C 008 - TOWN OF EAU GALLE Current 0 ST. CROIX COUNTY, WISCONSIN Creation Date Historical Date Map # Sales Area Application # Permit # Permit Type # of Units 00 0 Tax Address: Owner(s): O = Current Owner, C = Current Co-Owner TRAIL ST CROIX COUNTY 0 - ST CROIX COUNTY, TRAIL 1101 CARMICHAEL RD HUDSON WI 54016-7710 Districts: SC = School SP = Special Property Address(es): Primary Type Dist # Description SC 0231 BALDWIN-WOODVILLE AREA SP 1700 WITC Legal Description: Acres: 8.000 Plat: N/A-NOT AVAILABLE SEC 3 T28N R1 6W A STRIP OF LAND 200' IN Block/Condo Bldg: WIDTH EXTENDING OVER AND ACROSS THE S 1/2 OF THE NE 1/4 OF SD SEC 3; SD STRIP Tract(s): (Sec-Twn-Rng 40 1/4 160 1/4) BEING 100' IN WIDTH ON EACH SIDE OF SD 03-28N-16W ORGINIAL MAIN TRACK CENTER LINE TRAIL Notes: Parcel History: Date Doc # Vol/Page Type 07/23/1997 463/425 2010 SUMMARY Bill Fair Market Value: Assessed with: 0 Valuations: Last Changed: 06/21/2007 Description Class Acres Land Improve Total State Reason COUNTY X3 8.000 0 0 0 NO Totals for 2010: General Property 0.000 0 0 0 Woodland 0.000 0 0 Totals for 2009: General Property 0.000 0 0 0 Woodland 0.000 0 0 Lottery Credit: Claim Count: 0 Certification Date: Batch Specials: User Special Code Category Amount Special Assessments Special Charges Delinquent Charges Total 0.00 0.00 0.00 ST. CROIX COUNTY WISCONSIN ZONING OFFICE ° M"R p ■~r~i ST. CROIX COUNTY GOVERNMENT CENTER 1101 Carmichael Road - Hudson, WI 54016-7710 (715) 386-4680 October 30, 1996 File Ref: 76-96 Joseph G. Grant, Parks Director St. Croix County Parks Department 1049 Rustic Road 3 Glenwood City, Wi9consin 54013 Re: Board of Adjustment Decision Dear Mr. Grant: The St. Croix County Board of Adjustment has reviewed your application for a special exception use permit for filling and grading within 300 feet of a shoreland district and has approved your application with conditions. The enclosed document is the formal decision regarding your application. Should you have any questions or concerns, please do not hesitate in contacting me. Very truly yours, Thomas C. Nelson Zoning Administrator pe Enclosure cc: William Peavey, Clerk - Town of Eau Galle Dan Koich, WDNR 0 FINDINGS, CONCLUSIONS, AND DECISION OF THE ZONING BOARD OF ADJUSTMENT ST. CROIX COUNTY, WISCONSIN Case: 76-96 Complete Application Received: August 30, 1996 Hearing Notice Publication: Weeks of 9/9/96 and 9/16/96 Hearing Date: September 26, 1996 FINDINGS OF FACT Having heard all the testimony, considered the entire record herein, and conducted an on-site inspection, the Board finds the following facts: 1. The applicant is Joseph G. Grant, Parks Director for the St. Croix County Parks Department, whose address is 1049 Rustic Road 3, Glenwood City, State of Wisconsin. 2. The applicant on August 30, 1996 filed with the Zoning Office an application for filling and grading within the shoreland of the Carr Creek to install an aluminum box culvert on the Woodville Trail. 3. St. Croix County is the owner of the property which is the subject of the application which is located in the NE', of the NE, of Section 3, T28N-R16W, Town of Eau Galle, St. Croix County, Wisconsin. 4. The subject property is presently used for a public outdoor recreational trail. ~I 5. The property is zoned ag-residential under the current Zoning Code of the St. Croix County Zoning Ordinance. i 6. The Town of Eau Galle supports the application. 7. This is a request for filling and grading within 300 feet of a shoreland district of the Carr Creek. This particular activity is not a permitted use, but rather a special exception use. 8. The applicant plans to install an aluminum box culvert on the Woodville Trail to span a westerly branch of Carr Creek. This structure will improve the trail for use by hikers, bikers and snowmobiles. 9. The specifications of the aluminum box culvert are 2011" wide by 18' long with a height of 616". 10. Plans for the aluminum box culvert were submitted by Gregory H. Haig, Sales Engineer with Contech Construction Products on June 22, 1996. Included with said correspondence were S construction plans, estimated quantities, plans for establishing and maintaining vegetation. 11. The Wisconsin Department of Natural Resources supports the proposal. CONCLUSIONS OF LAW The Board concludes that: 1. The Board of Adjustment has authority under sec. 17.70(5) (c)4, St. Croix County Zoning Ordinance, to approve or deny a request for a special exception use. 2. Special exception use permits may be terminated pursuant to sec. 17.70(7)(d)5, St. Croix County Zoning Ordinance, if the conditions of the decision are not followed. 3. Section 17.29(2) allows a special exception for filling and grading of the shoreland. DECISION On the basis of the above Findings of Fact, Conclusions of Law, and the record herein, the Board approves the applicant's request for a special exception use for filling and grading shoreland on the following vote: N. Golz Yes J. Neumann Yes T. Filipiak Yes A. Jensen Yes Chairman J. Bradley Yes with the following conditions: 1. This decision expires on October 30, 1997. No construction may begin or continue after this date unless an extension is granted in writing by the Board of Adjustment prior to the expiration date. 2. The applicant must complete this project according to the plans submitted and the conditions stated herein. Minor changes in the project must be submitted to and approved in writing by the Zoning Office before the project starts or continues. Major changes must be brought back to the Board of Adjustment for review and approval. 3. The applicant is responsible for obtaining any permit or approval required for the project by municipal, town, county 2 or state laws, rules or regulations before starting the project. 4. The applicant must provide confirmation to the County Zoning Department that all other permits or approvals have been received. 5. The applicant must allow free and unlimited access to the site during construction and operation at any reasonable time to any Zoning Department employee to check for compliance with this decision. 6. This decision has been issued with the understanding that any construction equipment used is the right size to o the job and can be brought to and removed from the project site without unreasonable harm to vegetative cover or fish and/or wildlife habitat. The removal of vegetative cover and exposure of bare ground shall be restricted to the minimum amount necessary for construction. Areas where soil is exposed must be protected from erosion by seeding and mulching, sodding, diversion of surface runoff, installation of straw bales or silt screens, construction of settling basins, or similar methods as soon as possible after removal of the original ground cover. 7. No portion of the bank or upland which is altered, disturbed, and/or unstable may remain unprotected for more than ten (10) hours. 8. If filter fabric silt fences are utilized as the upland erosion control method used to prevent sediment from washing into the river, there should be a double-row of fences parallel to each other about ten (10) feet apart. Someone shall be designated to monitor the effectiveness of these silt fences and maintain them before the work crew leaves the work site at the end of each work day. Tom Nelson shall be notified of that designee. 9. The applicant must keep a copy of this decision at the site during construction. 10. Tom Nelson, Zoning Administrator, shall be notified prior to beginning the project. Call him at 715/386-4680 so that compliance inspections can be made. 11. The Board of Adjustment may change or revoke this decision if the project becomes detrimental to the public interest. 12. Accepting this decision and beginning the project means that the applicant has read, understands, and agrees to follow all conditions of this decision. 3 APPEAL RIGHTS This decision may be appealed by any person aggrieved by filing an action in certiorari in the circuit court of this County within 30 days after the date of filing shown below. The County assumes no liability for and makes no warranty as to the legality of any construction commenced prior to the expiration of this 30-day period or the identity of any person who may claim to be aggrieved by this decision. ZONING BOARD OF ADJUSTMENT Signed / Chairperson A Zoning Administrator Dated: 10/30/96 Filed: 10/30/96 4 s cn O )Nil N O MEMO= N N, N, Railroad 34 F Q BB Ave. B ITE- N ul O 3 '2 I 50th s Ems' .a~~