HomeMy WebLinkAbout018-1000-60-050(1)
ORDINANCE DECISION TREND ANALYSIS
Data Collection/Analysis Would Include:
Initial Data G
Computer/Property I.D. # - 0 - 10(3 A - 6 Q
Owner's Name
Property Address C,? 7
Zoning District A2 AG AR RES COM IND
Past Zoning A2 AG AR RES COM IND
Overlay District NONE CS:HHRELAND WETLAND FLOODPLAIN RIVERWAY
Location Section, Town, Range, Lot_ . a
Acres
Request Date_ 5 "
Disposition DENIE APPROVED WITHDRAWN POSTPONED Date
Activi
Rezoning / Varianc / Special Exception l
Type of Variance/Special Exception
ROAD/HWY. SETBACK WATER SETBACK BLUFFLINE SETBACK LOT RATIO
DRIVEWAY SEPARATION NONCONFORMING LOT SIZE
Ordinance Citation
Supporting Evidence Description
PLOT MAP/PLAN SITE PLAN TOWN APPROVAL LTR CSM PHOTOS MAPS SOIL TEST
Hardship YES NO
Linked to Rezoning YES NO
Conditions
EXPIRATION DATE COMPLETION ACCORDING TO PLAN ALL PERMITS COMPLETE
ZONING OFFICE ACCESS & NOTIFICATION UPON COMPLETION EROSION CONTROL
Objections YES NO
ST. CROIX COUNTY
WISCONSIN
ZONING OFFICE
IN up "of I n a rrrri ST. CROIX COUNTY GOVERNMENT CENTER
1101 Carmichael Road
Hudson, WI 54016-7710
(715) 386-4680
August 19, 1996
Mr. Glen Boldt
2076 - 117th Avenue
Baldwin, WI 54002
RE: Board of Adjustment Decision
File Ref: 40-96
Dear Mr. Boldt:
The St. Croix County Board of Adjustment has reviewed your
application for a special exception request for filling and grading
shoreland along the shore of Pine Lake. The enclosed document is
the formal decision regarding your application.
If you have any questions, please do not hesitate in contacting me.
Sincerely,
Thomas C. Nelson
Zoning Administrator
db
Enc.
cc: Marcia Ivy, Clerk
Town of Hammond
1993 County Road J
Baldwin, WI 54002
[ ~
Cmi
FINDINGS, CONCLUSIONS, DECISION
AND ORDER OF THE ZONING BOARD OF ADJUSTMENT
ST. CROIX COUNTY, WISCONSIN
Case: 40-96
Complete Application Received: 5/08/96
Hearing Date: 6/27/96
Dates of Publication: Weeks of 6/10/96 and 6/17/96
FINDINGS OF FACT
Having heard all the testimony, considered the entire record
herein, and conducted an on-site inspection, the Board finds the
following facts:
1. The applicant is Glen Boldt, whose address is 2076 117th
Avenue, Baldwin, Wisconsin 54002.
2. The applicant on May 8, 1996 filed with the Zoning Office an
application for a special exception request for filling and
grading shoreland.
3. Glen Boldt is the owner of the property which is the subject
of this application which is located in the NE', of the NE', of
Section 1, T29N, R17W, Town of Hammond, St. Croix County,
Wisconsin.
4. The subject property is currently used for residence.
i
5. Nelson stated this was a request for filling and grading on
the shore of Pine Lake as well as riprapping. Nelson noted
that this was not a permitted use, but rather permitted by a
special exception. Nelson introduced Exhibit #1, a letter
from the Town Board stating their approval; Exhibit #2, a site
plan of the proposed project.
6. Glen Boldt, being duly sworn, stated his address to be 2076 -
117th Avenue, Baldwin, Wisconsin. Boldt stated he obtained a
permit from the DNR in Eau Claire a year ago and this request
is the result of water erosion of about 200 feet.
7. Bradley asked how much shoreline Boldt intended to remedy.
Boldt stated about 500 feet.
CONCLUSION OF LAW
The Board Concludes that:
1. The Board of Adjustment has authority under Section 17.70 (5)
(c) 4 to approve special exception uses.
2. Special Exception uses may be terminated as per 17.70 (7) (d)
of the St. Croix County Zoning Ordinance if the plan or the
conditions of the decision are not followed.
3. Section 17.29 (1) (a) allows a special exception for filling
and grading shoreland.
DECISION
On the basis of the above Findings of Fact, Conclusion of Law, and
the record herein, the Board approves the applicant's request for
a special exception use for filling and grading shoreland on the
shore of Pine Lake on the following vote:
Chairman Bradley yes
A. Jensen yes
C. Mehls yes
G. Menter yes
with the following conditions:
1. This decision expires on June 27, 1997. No construction may
begin or continue after this date unless an extension is
granted in writing by the Board of Adjustment prior to the
expiration date.
2. The applicant must complete this project according to the
plans submitted. Minor changes in the project must be
submitted to and approved in writing by the Zoning Office
before the project starts or continues. Major changes must be
brought back to the Board of Adjustment for review and
approval.
3. The applicant is responsible for obtaining any permit or
approval required for the project by municipal, town or county
zoning ordinances or by the U.S. Army Corps of Engineers
before starting the project.
4. The applicant must provide confirmation that he/she has
completed permit process with all other regulatory agencies.
5. The applicant must allow free and unlimited access to the
project site at any reasonable time to any Zoning Office
employee who is overseeing the project's construction,
operation, or maintenance.
6. The applicant shall perform the removal under the direction of
the Zoning Office if it becomes necessary to protect the
navigable waters involved.
7. The Board of Adjustment may change or revoke this decision if
the project becomes detrimental to the public interest.
8. This decision has been issued with the understanding that any
equipment used is the right size to do the job and can be
brought to and removed from the project site without
unreasonable harm to vegetative cover and/or wildlife habitat.
The removal of vegetative cover and exposure of bare ground
shall be restricted to the minimum amount necessary for
construction. Areas where soil is exposed must be protected
from erosion by seeding and mulching, sodding, diversion of
surface runoff, installation of straw bales or silt screens,
construction of settling basins, or similar methods as soon as
possible after removal of the original ground cover.
9. The applicant must keep a copy of this decision at the project
site at all times until the project has been completed.
10. Tom Nelson, Zoning Administrator, shall be notified prior to
beginning the project. Call him at (715)386-4680 so that
compliance inspections can be made.
11. Accepting this decision and beginning the project means that
the applicant has read, understands, and agrees to follow all
conditions of this decision.
APPEAL RIGHTS
This decision may be appealed by any person aggrieved by filing an
action in certiorari in the circuit court of this County within 30
days after the date of filing shown below. The County assumes no
liability for and makes no warranty as to the legality of any
construction commenced prior to the expiration of this 30-day
period or the identity of any person who may claim to be aggrieved
by this decision.
ZONING BOARD OF ADJUSTMENT
Singed
Chairperson
Dated: 8/19/96
Filed: 8/19/96
v o C con
((DD (OD '36 :0 h.
(D F
m 3
0
Z O V W 2 0° ,t
s 3 3 c~ ° a 3 N CO h.
° rn a Z Z w 3 (O o M
A C O O O O O V° C 1
j o a 0 0 m a ° ^t
° cn 3 c°n
rn o °
V
CD Lo
m co o D
N 3 7 O N
0) w
lot
O ro j W
z (D (o
O pp
rn rn ~ ° r (n
c NJ
v M
j OOO
~y~~i
C03
n 3\, N N N O D
N Q ` v v °
d d !r
.do y _
\ 3 m w
(D O
N
ZWO o
o D 0.
CD CD ter
ro
_N
d
C O N
m a
3
(D ! --1 N
~O !',i A Z
N c ;o _
c p z O
! a N 3
N ~
a M (0
Z
3 A
p Z
3 m
z _
CD
W
I I
p a
7 d a G
o:
- O m T
O
N
sp~3 - ~
7
~ Z
co a
!
co o 0
d N
L ~n Iron
-o
m
_ n
v
3 ' N O _
r
o c~
ro Oro c
d (D
O a O
w
00
Dy o
N
O J
O
(OD ^b ti
USG b
6A O c
O d y