Loading...
HomeMy WebLinkAbout030-2048-40-000(2) 0 "' 0 ST. C R 0201�--; `� : /-(i �1/}■J i ,J� Planning&Land Land Information Resource Management Community Development Department September 26,2013 File Ref. #SE87991 Daryl Olson 1392 Hilltop Ridge Houlton,WI 54082 RE: Parcel#030-2048-40-000,Gov't Lot 2, Section 27,T30N,R20W,Town of St.Joseph Dear Mr. Olson: The St.Croix County Board of Adjustment(Board)has reviewed your request for the following items: Variance for reconstruction of a nonconforming accessory structure(deck)in the Lower St.Croix Riverway Overlay District pursuant to Section 17.36.I.3.b of the St. Croix County Zoning Ordinance. I i After the hearing on September 26,2013,the Board approved the variance request with conditions.The enclosed document is the formal decision regarding the application. You must obtain any other required local,state,and federal permits and approvals. Feel free to contact me with any questions or concerns. Pamela Quinn Land Use Specialist Enclosures: Formal Decision cc: Clerk,Town of St.Joseph Mike Wenholz, Wisconsin DNR Jim Barton,Barton Construction Services Phone 715.386.4680 Government Center, 1101 Carmichael Road, Hudson, WI 54016 Fax 715.386.4686 www.sccwi.us/cdd www.facebook.com/Stcroixcountyw cdd @co.sain t-Croix.wi.us RINGS, CONCLUSIONS, AND DECISION OF THE ZONING BOARD OF ADJUSTMENT ST. CROIX COUNTY, WISCONSIN File Number. SE87991 Applicant: Daryl Olson, property owner Parcel Number: 27.30.20.510P Complete Application Received: August 5, 2013 Hearing Notice Publication: Weeks of September 9 and 16, 2013 Hearing Date: September 26, 2013 FIlVDINGS OF FACT AND CONCLUSIONS OF LAW Having heard all the testimony, considered the entire record herein, and visited the site, the Board of Adjustment makes the following Findings of Fact and Conclusions of Law pertinent to the applicant's special exception requests: 1. The applicant is Daryl Olson, property owner. 2. The site is located at 1392 Hilltop Ridge Rd. in Part of Gov't Lot 2, Section 27, T30N, R20W in the Town of St. Joseph, WI. 3. The Town of St. Joseph Town clerk notified the department in an e-mail sent Sept. 16, 2013 that a formal letter will be sent with the Town Board's recommendation for approval from their September 12th meeting. 4. Mike Wenholz, Wisconsin Department of Natural Resources Shoreland Specialist, submitted his comments on September 19'h. The department recommends that this request be denied, however, if the Board finds the applicants have demonstrated meeting all three required variance criteria and approves the variance, the department recommends the applicants understand that since their deck is 400 square feet, they are only allowed a total of 100 square feet of additional accessory structure within the bluffline setback to comply with Section 17.36.I.3.b.4). 5. The applicant filed an application with the Board of Adjustment for a variance to reconstruct a nonconforming accessory structure (deck) within the bluffline setback area in the Lower St. Croix Riverway district pursuant to Section 17.36.I.3.b. of the St. Croix County Zoning Ordinance. The deck is in need of more than ordinary maintenance and repair to meet current Uniform Dwelling Code requirements and will meet the intent of the ordinance in that: • The reconstructed deck will be no larger than the existing one, which is approximately 400 sq. ft.; • No vegetation will be harmed during reconstruction; • The public interest would not be harmed by granting the variance; • The deck is and will continue to be inconspicuous from the river; • and property values will not be negatively affected. 6. When determining whether an unnecessary hardship exists, the Board of Adjustment must identify unique physical characteristics of the property that would otherwise prohibit the applicant from using the property for a permitted purpose, and then weigh the burden placed on the applicant in meeting the requirements of the Ordinance against the public interests being protected. The original house and its accessory structure (deck) were constructed less than 40 feet from the bluffline prior to the adoption of the Rverway ordinance and as such are legal nonconforming structures. The request will not increase the nonconformity of the structures since the deck will remain -25 ft. from the bluffline. 7. Literal enforcement of the ordinance prohibiting the reconstruction of a legal nonconforming accessory structure (except garages or sheds) would limit the applicant's continued use of the deck as a safe, structurally-sound platform for ingress and egress from existing doorways on the house. 8. In Chapter NR 118.08(3) ordinary maintenance and repair of nonconforming accessory structures is allowed, but "Nonconforming accessory structures may not be structurally altered, reconstructed or expanded". Ordinary maintenance and repair of the existing deck structure will not be sufficient to prevent further deterioration or meet decay prevention requirements in Comm 21.10 of Wisconsin Dept. of Commerce Chapter Comm 21 Construction - 1 - Standards. The applicant's re test would also bring the deck into complianfnth state specifications for safe handrails, footings, frost protection, and structural support/attachment to the principal structure. However, the applicant cannot comply with Comm 21.225 without reconstruction of the deck, which would be a violation of prohibitions contained in NR 118.08(3) and Section 17.36.I.3.b of the St. Croix County Riverway ordinance. Conflicting statutory requirements contained in separate state regulations is a hardship that was not self-created by the applicant. 9. The applicant is requesting minimal relief from the standards in the Ordinance. The proposed reconstruction of the deck will not expand the existing nonconforming accessory structure's footprint of -400 sq. ft. or increase its encroachment into the 40' bluffline setback. 10. Substantial justice would be done by allowing continued use of a deck attached to the principal structure, which is allowed in the Lower St. Croix Riverway District, and which will be reconstructed within the footprint of the original deck. The reconstruction will not expand the existing nonconforming accessory structure's foundation/footprint or increase its encroachment into the bluffline setback. The deck will be rebuilt to current Wisconsin building code standards. With conditions that mitigation measures will include a stormwater management plan to comply with requirements and standards in Section 17.36.H.7 and that an affidavit will be recorded to describe the approved stormwater management plan and discloses its maintenance requirements pursuant to Section 17.36.H.7.g,1) & 2), the reconstructed deck will meet the spirit and intent of the Ordinance and comply with mitigation requirements in Section 17.36.I.5.a., b., and c.3). DECISION On the basis of the above Findings of Fact, Conclusions of Law, and the record herein, the Board granted the applicant's variance request, with the following conditions: 1. The variance will allow the applicant to reconstruct a deck attached to the principal structure within the same footprint as the original deck in accordance with the plans submitted on August 5, 2013 and as provided in the conditions below. This approval does not include any additional structures, impervious coverage, filling and grading, or other activities. 2. The applicant shall secure all necessary permits and approvals from the Town of St. Joseph and obtain any other required local, state, or federal permits and approvals, including but not limited to a building permit. 3. In compliance with the mitigation requirements in Sections 17.36.I.5.c.3) &4), the applicant will direct stormwater runoff from the house gutters away from riverward slopes into approved stormwater infiltration structures and protect existing trees within the bluffline setback to maintain slope stability and visual screening of the house from the river. Prior to commencing demolition and reconstruction of the deck, the applicant must submit to and have approved by the Land Use Administrator the following items: • A storm water management plan designed to infiltrate runoff from the house roof, including redirecting discharge from downspouts away from the bluffline. 4. As indicated in the plans submitted, the proposed project will be visually inconspicuous, will comply with requirements for earth-tone building materials, and will not require removal of existing mature trees that screen the house from the river. Within 30 days of completion of the deck reconstruction, the applicant shall provide certification that the deck was constructed according to the approved plans and in compliance with state UDC code. 5. Within 30 days of the Board's decision, the applicant shall record an affidavit against the property referencing the decision and stormwater management plan for approved runoff infiltration structures. The applicant shall submit a recorded copy of the affidavit to the Land Use Administrator at this time. The intent is to make future owners aware of the limitations and responsibilities incurred as part of the Board of Adjustment's variance decision. -2- 0 6. Any minor change or addition to the project, including but not limited to design of the project, shall require review and approval by the Land Use Administrator prior to making the change or addition. Any major change or addition to the originally approved plan will have to go through the variance approval process. 7. The applicant shall have one (1) year from the issuance of these approvals to commence reconstruction of the deck and two (2) years to complete the project. Failure to do so may result in expiration or revocation of this decision, after which time the applicant will be required to secure a new variance before starting or completing the project. 8. These conditions may be amended or additional conditions may be added if unanticipated circumstances arise that would affect the health and/or safety of citizens or degrade the natural resources of St. Croix County. Conditions will not be amended or added without notice to the applicant and an opportunity for a hearing. 9. Accepting this decision means that the applicant has read, understands, and agrees to all conditions of this decision and has no objections if county staff conducts unannounced onsite inspections to check for compliance with the conditions of this permit. The following vote was taken to approve the request: Chairman Malick, yes; Peterson, yes; Sontag, yes; Nelson, yes; McAllister, yes. Motion carries. III APPEAL RIGHTS Any person aggrieved by this decision may file an appeal in St. Croix County circuit court within 30 days after the filing date shown below, pursuant to Sec. 59.694(l 0), Wisconsin Statutes. St. Croix County assumes no responsibility for action taken in reliance on this decision prior to the expiration of the appeal period. St. Croix County does not certify that the identity of all persons legally entitled to notice of the Board of Adjustment proceedings, which resulted in this decision, was provided to the County. If an appeal is taken of this decision, it is the responsibility of the appellant to submit at his/her expense a transcript of the Board of Adjustment proceedings to the circuit court. The Community Development Department can be contacted for information on how to obtain a transcript. It is the responsibility of the Board of Adjustment to submit its record (file) of this matter to the circuit court. ZONING BOARD OF ADJUS MENT Signed: Clarence W. "Buck" Malick, Chairman Date Filed: September 27, 2013 -3- 0 St. Poix County Board of Adjustment Hearing Date. Sep tember 26, 2013 APPLICATION #2: Variance Applicant: Daryl Olson,property owner Site Address: 1392 Hilltop Ridge Property#s: 27.30.20.510P Computer#s: 030-2048-40-000 Location: Gov't Lot 2, Section 27,T30N,R20W,Town of St.Joseph Zoning: Ag Residential and Lower St. Croix Riverway Districts Parcel Size: 1.1 acres Requests: Variance for reconstruction of a nonconforming accessory structure (deck) in the Lower St. Croix Riverway Overlay District pursuant to Section 17.36.I.3.b of the St. Croix County Zoning Ordinance. Exhibits: 1) Staff Report 2) Variance Application submitted August 5,2013 3) Photo page 4) Town of St.Joseph Town clerk e-mail,received Sept. 16,2013 5) Wisconsin Dept. of Natural Resources comments pending-as,of 9/19/13 ftej 6) Steve Olson review comments,received Sept. 6,2013 7) Olson stormwater runoff mitigation plan BACKGRQUNb: The applicant is the owner of a legal nonconforming principal structure situated on a riparian lot in the Lower St. Croix Riverway District in the Town of St.Joseph. The house and a majority of the deck were originally constructed within the 40-foot bluffline setback prior to adoption of the county Riverway ordinance. On May 26, 1987 prevous owner Brian Sigstad received Board approval for an addition on the house that included an extension of the deck,all of which was parallel to the bluffline. The applicant purchased the property in 2012 and found that the entire deck is in need of more than ordinary maintenance and repair to meet current Uniform Dwelling Code structural requirements for safe use as ingress/egress into the house. The variance request is to allow reconstruction of a deck attached to a legal nonconforming principal structure that does not meet the 40' setback from the bluffline. The proposed deck reconstruction will not increase the existing footprint nor encroach further into the bluffline setback. (Exhibit 2) GovERNWNTAL AGENCY REVIEW: Town of St.Joseph: The Town Clerk has been sent a copy of the variance application for review by St. Joseph Town Board. (Exhibit 4) Wisconsin Department of Natural Resources: Mike Wenholz, Shoreland Zoning Specialist,has been sent a copy of the variance application for review and will be submitting comments prior to the Board hearing. They were not submitted in time for inclusion in the staff report. (Exhibit 5) Community Development Department: Steve Olson has reviewed the variance application with regard to stormwater and erosion control and has no comments with regard to the request. (Exhibit 6) SITE REUTEW: The site is located Hilltop Ridge Rd. in the Town of St.Joseph within the Lower St. Croix Riverway District. The riverward side of the house(where the deck is to be reconstructed) is within the 40 ft.bluffline setback and is greater than 200' from the river OHWM. The surrounding properties feature similar residential and recreational uses. - 1 - Exhibit 1 0 Mr Section 17.36.L3.a. of the St. Croix County Zoning Ordinance states that"ordinary maintenance and repair of nonconforming accessory structures is allowed." Section 17.3 6.1.3.b. states"Nonconforming accessory structures may not be structurally altered,reconstructed or expanded,except that garages and storage sheds may be structurally altered,reconstructed or expanded if all of the following requirements are met where applicable:" The Board of Adjustment has the authority to issue a variance to dimensional standards only when the Ordinance and statutory criteria are satisfied. Those criteria are prescribed by the St. Croix County Zoning Ordinance, Section 17.70(5)(c)3,and Wisconsin State Statutes §59.694 as follows: Section 17.70(5)(c)3: Grant variances from the strict terms of this chapter as will not be contrary to the public interest,where owing to special conditions a literal enforcement of the chapter will result in unnecessary hardship so that the spirit of the chapter shall be observed and substantial justice done. Variances shall be granted only subject to the provisions Sub(6). No variance shall have the effect of allowing in any district uses not permitted in that district. §59.694(7)(c): To authorize upon appeal in specific cases variances from the terms of the ordinance that will not be contrary to the public interest,where,owing to special conditions, a literal enforcement of the provisions of the ordinance will result in unnecessary hardship,and so that the spirit of the ordinance shall be observed and substantial justice done. i Section 17.70(6)(e)of the Ordinance states that a variance shall not: 1. Grant,extend or increase any use prohibited in the zoning district. 2. Be granted for a hardship based solely on an economic gain or loss. 3. Be granted for a hardship which is self-created. 4. Damage the rights or property values of other persons in the area. 5. Allow actions without the appropriate amendments to this ordinance or its associated map(s). 6. Allow any alteration of an historic structure, including its use,which would preclude its continued designation as an historic structure. Section 17.70(6)(f)of the Ordinance states that in granting a variance,the Board of Adjustment may prescribe appropriate conditions and safeguards which are in conformity with the purpose of this chapter.Violations of such conditions and safeguards when made a part of the terms under which the variance is granted shall be deemed a violation of this chapter. Board of Adjustment Direction The Board of Adjustment after contemplating all relevant information may do one of the following: 1. Recommend approval of the requests. 2. Recommend denial of the requests. 3. Table/postpone the decision to absorb information gathered or request additional information. The Board of Adjustment must stipulate findings to support their decision(for approval or denial). IM ft yry OsIb"A 09 006 Staff offers the following general findings of fact and conclusions of law pertinent to the requested variance for the Board's consideration: 1. The applicant is Daryl Olson,property owner. 2. The site is located at 1392 Hilltop Ridge Rd. in Part of Gov't Lot 2, Section 27,T30N,R20W in the Town of St.Joseph, WI. -2- 3. The Town of St.Joseph ToV*lerk notified the department in an e-mail sent Sept. 16, 2013 that a formal letter will be sent with the Town Board's recommendation from their September 12d'meeting. 4. The Wisconsin Department of Natural Resources comments will be submitted prior to the Board of Adjustment hearing,but were not available to be included in the staff report. 5. The applicant filed an application with the Board of Adjustment for a variance to reconstruct a pp pp J nonconforming accessory structure(deck)within the bluffline setback area in the Lower St.Croix Riverway district pursuant to Section 17.36.I.3.b. of the St. Croix County Zoning Ordinance. The deck is in need of more than ordinary maintenance and repair to meet current Uniform Dwelling Code requirements and will meet the intent of the ordinance in that: • The reconstructed deck will be no larger than the existing one,which is approximately 400 sq. ft.; • No vegetation will be harmed during reconstruction; • The public interest would not be harmed by granting the variance; • The deck is and will continue to be inconspicuous from the river; • and property values will not be negatively affected. 6. When determining whether an unnecessary hardship exists,the Board of Adjustment must identify unique physical characteristics of the property that would otherwise prohibit the applicant from using the property for a permitted purpose, and then weigh the burden placed on the applicant in meeting the requirements of the Ordinance against the public interests being protected. The original house and its accessory structure(deck) were constructed less than 40 feet from the bluffline prior to the adoption of the riverway ordinance and as such are legal nonconforming structures. The request will not increase the nonconformity of the structures since the deck will remain—25 ft. from the bluffline. 7. Literal enforcement of the ordinance prohibiting the reconstruction of a legal nonconforming accessory structure(except garages or sheds)would limit the applicant's continued use of the deck as a safe, structurally-sound platform for ingress and egress from existing doorways on the house. 8. In Chapter NR 118.08(3)ordinary maintenance and repair of nonconforming accessory structures is allowed, but"Nonconforming accessory structures may not be structurally altered,reconstructed or expanded". Ordinary maintenance and repair of the existing deck structure will not be sufficient to prevent further deterioration or meet decay prevention requirements in Comm 2 1.10 of Wisconsin Dept. of Commerce Chapter Comm 21 Construction Standards. The applicant's request would also bring the deck into compliance with state specifications for safe handrails,footings, frost protection,and structural support/attachment to the principal structure. However,the applicant cannot comply with Comm 21.225 without reconstruction of the deck,which would be a violation of prohibitions contained in NR 118.08(3)and Section 17.36.I.3.b of the St. Croix County Riverway ordinance. Conflicting statutory requirements contained in separate state regulations is a hardship that was not self-created by the applicant. 9. The applicant is requesting minimal relief from the standards in the Ordinance. The proposed reconstruction of the deck will not expand the existing nonconforming accessory structure's footprint of—400 sq.ft. or increase its encroachment into the 40' bluffline setback. 10. Substantial justice would be done by allowing continued use of a deck attached to the principal structure, which is allowed in the Lower St. Croix Riverway District,and which will be reconstructed within the footprint of the original deck. The reconstruction will not expand the existing nonconforming accessory structure's foundation/footprint or increase its encroachment into the bluffline setback. The deck will be rebuilt to current Wisconsin building code standards. With conditions that mitigation measures will include a stormwater management plan to comply with requirements and standards in Section 17.36.H.7 and that an affidavit will be recorded to describe the approved stormwater management plan and discloses its maintenance requirements pursuant to Section 17.36.H.7.g,1)&2),the reconstructed deck will meet the spirit and intent of the Ordinance and comply with mitigation requirements in Section 17.36.I.5.a.,b.,and c.3). -3- �-F If the Board can make the necessary findings to support the variance request(s),then the Board can consider granting the variance(s). If any of the findings cannot be made,the variance request(s)should be denied. In the event the Board approves the variance request, staff recommends the following conditions for the Board's consideration: 1. The variance will allow the applicant to reconstruct a deck attached to the principal structure within the same footprint as the original deck in accordance with the plans submitted on August 5,2013 and as provided in the conditions below. This approval does not include any additional structures,impervious coverage,filling and grading,or other activities. 2. The applicant shall secure all necessary permits and approvals from the Town of St.Joseph and obtain any other required local, state,or federal permits and approvals, including but not limited to a building permit. 3. In compliance with the mitigation requirements in Sections 17.36.I.5.c.3)&4),the applicant will direct stormwater runoff from the house gutters away from riverward slopes into approved stormwater infiltration structures and protect existing trees within the bluffline setback to maintain slope stability and visual screening of the house from the river. Prior to commencing demolition and reconstruction of the deck,the applicant must submit to and have approved by the Land Use Administrator the following items: • A storm water management plan designed to infiltrate runoff from the house roof, including redirecting discharge from downspouts away from the bluffline. 4. As indicated in the plans submitted,the proposed project will be visually inconspicuous,will comply with requirements for earth-tone building materials,and will not require removal of existing mature trees that screen the house from the river. Within 30 days of completion of the deck reconstruction,the applicant shall provide certification that the deck was constructed according to the approved plans and in compliance with state UDC code. 5. Within 30 days of the Board's decision,the applicant shall record an affidavit against the property referencing the decision and stormwater management plan for approved runoff infiltration structures. The applicant shall submit a recorded copy of the affidavit to the Land Use Administrator at this time. The intent is to make future owners aware of the limitations and responsibilities incurred as part of the Board of Adjustment's variance decision. 6. Any minor change or addition to the project, including but not limited to design of the project, shall require review and approval by the Land Use Administrator prior to making the change or addition. Any major change or addition to the originally approved plan will have to go through the variance approval process. 7. The applicant shall have one(1)year from the issuance of these approvals to commence reconstruction of the deck and two(2)years to complete the project. Failure to do so may result in expiration or revocation of this decision, after which time the applicant will be required to secure a new variance before starting or completing the project. 8. These conditions may be amended or additional conditions may be added if unanticipated circumstances arise that would affect the health and/or safety of citizens or degrade the natural resources of St.Croix County. Conditions will not be amended or added without notice to the applicant and an opportunity for a hearing. 9. Accepting this decision means that the applicant has read,understands,and agrees to all conditions of this decision and has no objections if county staff conducts unannounced onsite inspections to check for compliance with the conditions of this permit. I -4- Pam Quinn From: Nicole Stewart <clerk @townofstjoseph.com> Sent: Monday, September 16, 2013 4:50 PM To: Pam Quinn Subject: RE: Sept. 12th Town Board comments Dear Pam, The Town Board made a motion that essentially states that the Town approves of the variance request made by the Olson's.A formal letter is being made and will be sent to the County office. Sincerely, .kale Stewart Nicole Stewart Clerk Treasurer Town of St.Joseph 1337 County Road V Hudson, WI 54016 (715) 549-6235 715 549 6249(fax) From: Pam Quinn ,[mailto:Pam.Quinn(a)co.saint-croix.wi.usl Sent: Monday, September 16, 2013 4:47 PM To: email(a>townofst-oseph.com Subject: Sept. 12th Town Board comments Hi Nicole, Not to rush you, but did the Town Board make any recommendations for or against the Daryl Olson (1392 Hilltop Ridge) deck variance at their meeting last week? I have to finish the staff report so that it can be scanned on Wednesday. If they didn't take any action yet, please let me know and I'll put that in the findings. Thanks! Pam Quinn, Land Use Specialist (POW73) St. Croix County Community Deveropment Dept. not Carmichael Road Hudson, 1NI 54o16 715-386-468o pam.quinnga,co.saint-croix.wi.us 1 Unfinished/Old Business discussion and possible action on: 11. Appointing members to the New River Crossing Committee 12. Appointment of an additional member to the Public Works Committee a. Public Works Committee Recommendation on additional Public Works Committee Member 13. Reconsideration of Resolution 2013-06 Establishing Resolution for the Public Safety Committee (ts) a. Amend it to include up to 7 members (dt) New Business discussion and possible action: 14. Declaration of Disaster Status from summer storm damage (dg) 15. Approval of the elimination of Paragraph 7 of the Joint Library Agreement, titled Reimbursements to Other Libraries (dg) 16. Fall Festival Planning (dg) 17. Clerk's Training Update 18. Plan Commission a. Town Survey Questionnaire and Cover Letter 19. Two residents request the Town Board to look into a property located on Old County Road E-East because it has an existing teepee, semi-truck trailer and storage tent on it. The residents state that no septic or water system have been placed on the property and they are concerned that the owners of the property want to change the zoning status to run a business there. 20. One resident request that the Town Board discuss snowplow damage on Hilltop Road, Hilltop Ridge and Hilltop Lane. 21. Two residents request that the Town Board consider there Variance Application with St. Croix County to reconstruct an existing deck on the same footprint with no expansion. 22. Extension of Premises for GP Ventures (Guv's Place) for 3`d Annual Bean Bag tournament on Saturday September 7`h until 10:00 p.m. To also include the south side inner parking lot to be rope flagged off same as what has been done in prior years (dt) Budget YTD Review: Items for next Plan Commission or Town Board Agendas Adjournment Meeting notice posted as follows: Emailed to the Hudson Star Observer and posted as required By Nicole Stewart Town of St. Joseph- 1337 County Road V - Hudson, WI 54016 Office 715-549-6235 Fax 715-549- 6249—clerk(c�townsfstaoseph.com www.townofstjosel2h.com Town of St. Joseph - St. Croix County, WI Hereby provided are written notice and the agenda of the public meeting as stated below. There is an opportunity for public comments as noted on the agenda upon recognition by the presiding officer. Regular Meeting of the Town Board—St. Joseph Town Hall—August 8, 2013, 6:00 P.M. AGENDA (Items on the agenda which are not scheduled for a specific time may be considered at any time with a motion by the Board.) Call to Order—Statement of Public Notice—Roll Call—Adoption of Agenda—Pledge of Allegiance Dates of Upcoming Meetings and Events: September 4' - Plan Commission September 12t' -Town Board Meeting Reports: 1. Building Inspector 5. EMS Chief 9. Bass Lake Rehab 2. Zoning Administrator 6. Joint Library 10. Internet/Broadband 3. Plan Commission 7. Parks 11. River Committee 4. Fire Chief 8. WTA 12.Assessor Update Public Comment: Opportunity to address the Town Board on subjects not on the agenda. Consent Agenda: 1. Approval of Fire Department/First Responder: 2. Payment of Bills,Vouchers and POs 3. Approval of Provisional/Operators License: Consolidated Energy Cooperative dba Burkhardt Convenience Store: Jessica Leticia Tallarcio GP Ventures, Inc. dba Guv's Place: Sam Jacob McGinnis 4. Approval of Minutes: July 11', July 25`h Public Works: updates, discussion and possible action on: 5. General Road Maintenance on Town Roads 6. Town Tractor Update; Maintenance and Personnel (dg) 7. Having Stantec originate and maintain a Town Road Maintenance Plan (bg) 8. Reclaiming Town roads that are driveways that have poor PASER ratings (bg) 9. Snowplowing Discussion 10. Authorization of Sign Maintenance (dg)