Loading...
HomeMy WebLinkAbout020-1395-48-000 (2) ST. CROIX COUNTY WISCONSIN slow" ZONING OFFICE ST. CROIX COUNTY GOVERNMENT CENTER -- i -- - 1101 Carmichael Road z. Hudson, WI 54016-7710 (715) 386-4680 • Fax (715) 386-4686 April 4, 2005 File 30-03 Mark and Kathleen Buechel 404 Orange Street Prescott, WI 54021 Re: St. Croix County Special Exception Permit Parcel#: 25.29.19.2442, Town of Hudson Dear Mr. and Mrs. Buechel, This letter confirms that you have met all of the conditions of your special exception permit approved by the St. Croix County Board of Adjustment on August 28, 2003. Within the last month, I have received from you copies of the following outstanding items: • Oak Savanna Restoration Plan, recorded against the deed for the property. • Stormwater management plan and drainage easement for the permanent storm water control structures recorded against the deed for the property. Thank you for your cooperation in meeting the conditions of your permit. If you have any questions or concerns, please feel free to contact me at 715-386-4680. Sincerely, Jenny hillcox � e Zoning Specialist Cc: Pete Kling, St. Croix County Land and Water Conservation Department Rita Horne, Town of Hudson ST. COW COUNTY WISCONSIN ZONING OFFICE F rrrrrrrrr - ..... ST. CROIX COUNTY GOVERNMENT CENTER 1101 Carmichael Road -`—� Hudson, WI 54016-7710 (715) 386-4680 r Fax (715) 386-4686 October 2, 2003 File Ref: 30-03 Mark T and Kathleen A. Buechel 404 Orange Street Prescott, WI 54021 Re: Board of Adjustment Decision Dear Mr. and Mrs. Buechel: The St. Croix County Board of Adjustment has reviewed your request for a special exception for a permit for filling and grading in excess of 1,000 square feet on slopes between 12-20% in a Shoreland District and has approved this application with conditions. The enclosed document is the formal decision regarding your application. Should you have any questions or concerns,please do not hesitate in contacting me. i Sincerel Steve Fisher Zoning Director dz Enclosure cc: Matt Hieb, ACA, w/enclosure Rita Horne, Clerk,Town of Hudson,w/enclosures Pete Kling,LWCD,w/enclosures DNR,w/enclosures submitted in favor of St. Croix County, to be held by the Zoning Office for the erosion control and grading activities(to ensure proper construction). The initial financial guarantee period shall be for a minimum of one year and shall automatically renew until the county releases any or all of the financial guarantee • Written estimates must be submitted to the Zoning office for review and approval. • No construction, including earth moving, shall take place prior to approval of the financial guarantees • The applicant shall have the engineer submit proof that the plans were installed as approved. This document can be submitted in the form of an as-built or other document that county staff can review to ensure the plans were installed in accordance with the original design. • Upon substantial completion of all required improvements, the applicant shall notify the County Zoning Administrator of the completion of the improvements in writing. The County Zoning Administrator, in consultation with appropriate experts, shall inspect the improvements. • The County may retain a portion of the guarantee, for a period not to exceed two years after final acceptance of an improvement to ensure the project has been stabilized, this amount is not to exceed 15%of the cost of the improvement(erosion control and grading activities). 4. The applicant must record a storm water management plan and a drainage easement for the permanent storm water control structures against the deed for the property. The applicant is responsible to provide a recorded copy to the Zoning Office. The intent is to make the current and future owners aware of the responsibilities associated with the storm water management plan as well as the limitations (filling, grading, etc.) the landowner incurs as a result of the plan. 5. The applicant is to submit an Oak Savanna Restoration Plan for County review and approval. This information will be placed on a deed, restricting this area to remain as is. 6. Prior to beginning any work,the applicant must schedule an on-site pre-construction meeting that includes the landowner, contractor, engineer, architect, and St. Croix County Zoning and LWCD staff members. Items to be discussed include but are not limited to coordinating installation of BMP's, construction timelines,roles and responsibilities of owner, engineer, architect, contractor, etc. 7. The applicant shall provide the Zoning Office with the name and phone number of the person responsible for installing and maintaining the erosion control plan. 8. The applicant shall obtain all necessary approvals from the Wisconsin Department of Natural Resources. 9. The applicant must secure a township building permit before commencing construction. 10. The Zoning office is to be notified at the start and the finish of the project. 11. Any minor change or addition to the project, including but not limited to design of the project, shall require review and approval by the Zoning Administrator and the Land and Water Conservation Department prior to making the change or addition. Any major change or addition to the originally approved plan will have to go through the special 2 exception approval process. 12. The applicant shall have one(1) year from the issuance of the special exception permit to commence construction. Failure to do so shall result in revocation of the special exception permit. If the special exception permit expires before construction commences, the applicant will be required to secure a new special exception permit before starting or completing construction on the project. 13. These conditions may be amended or additional conditions may be added if unanticipated conditions arise that would affect the health and/or safety of citizens or degrade the natural resources of St. Croix County. Conditions will not be amended or added without notice to the applicant and an opportunity for a hearing. 14. Accepting this decision means that the applicant has read,understands, and agrees to all conditions of this decision. The following vote was taken to approve: Krueger, yes; Marzolf, yes; Peterson, yes; Golz, yes; Chairperson Speer, yes. Motion carried. APPEAL RIGHTS Any person aggrieved by this decision may file an appeal in St. Croix County circuit court within 30 days after the filing date shown below,pursuant to sec. 59.694(10),Wisconsin Statutes. St. Croix County assumes no responsibility for action taken in reliance on this decision prior to the expiration of the appeal period. St. Croix County does not certify that the identity of all persons legally entitled to notice of the Board of Adjustment proceedings,which resulted in this decision, was provided to the County. If an appeal is taken of this decision, it is the responsibility of the appellant to submit at his/her expense a transcript of the Board of Adjustment proceedings to the circuit court,which is available from Northwestern Court Reporters,Hudson,Wisconsin. It is the responsibility of the Board of Adjustment to submit its record(file)of this matter to the circuit court. ZONING BOARD OF ADJUSTMENT Signed: ha erso Dated: 10/02/03 Attest: Filed: 10/02/03 Zoning Director 3