r January 18, 2013 File#: LU87749
Wahlquist Bros., LLC
c/o Charles Wahlquist
5892001h Street
Baldwin, WI 54002
Y
Code Admimstrati Re: Land Use Permit for filling & grading in floodfringe area
715-386-4680 $ ` Parcel #01.28.17.6A, Town of Rush River
Land Information Dear Mr. Wahlquist:
Planning
715-386-4674 This letter confirms zoning approval according to plans submitted on January 2, 2013
for the following activities that require a land use permit:
Real Prope
715-3t6--4677
To fill and grade in a floodfringe area and erect an accessory structure pursuant to
A
Rec y Section 17.40.G.2.b. and 17.40.G.3.c. of the St. Croix County Zoning Ordinance.
cLng
5-386-4675 The grading was required to create a building pad for the accessory structure and
gravel driveway and parking areas.
w _ Staff finds that the proposed activities meet the Floodplain Ordinance requirements based
.. on the following findings:
1. The property is located in the NW 1/4 of the NW1/4 of section 1, T28N, R17W, in
the Town of Rush River and the site address is 2017 60t'Ave. This property is
�Y
zoned Agricultural with Shoreland and Floodplain overlay zoning districts.
2. The fill and grading occurred along a tributary of the Rush River after the applicant
received a building permit for the accessory structure. The grading was necessary
to construct a concrete pad foundation, driveway and parking area adjacent to the
building. The structure will meet the 75' setback from the OHWM of the tributary in
�y
compliance with Section 17.31 of the county ordinance.
3. David Hon, WDNR Storm Water Mgt. Specialist, issued the Wahlquist Bros. a
WPDES General Permit for construction site storm water runoff on November 21,
2012. The permit included requirements for implementation of the erosion control
and storm water management plan submitted with the application.
4. The Land and Water Conservation Department reviewed the application in
conjunction with an after-the-fact special exception and submitted comments that
applied to both zoning applications as follows
• The rip-rap shall be maintained and cleared of woody debris to ensure
structural integrity.
• Remove the debris pile on the west side of the shed and the east bank of
the navigable stream. It appears the debris pile falls within the floodplain
and the 75' setback of the ordinary high watermark.
Sr.CRO1X COUNTY GOVERNMENT CENTER
1 101 CARMICHAEL ROAD,HUDSON, W1 54016 715-386-4686 Fs x
PZPCO.SAINTCROIX.W1.US WWW.CO.SAINT-CROIX.WI.LIS
the si fence shall"be mamtamed until self-sustaining vegetation is established on all disturbed
areas.
• Any erosion that occurs prior to and after the establishment of the permanent vegetation shall
be repaired.
*+► Mow or treat any noxious weeds that may try to establish on site.
• �11,he use of phosphorous fertilizer shall be restricted unless a soil test confirms the need for
W
[A ;vegetation establishment.
This land u'96-permit approval is for filling and grading in a flood fringe area as indicated in the plans
submitted, ancf as provided in the conditions below:
1. The a licants shall comply with requirements contained any other permits that have been
obtained, including but not limited to the WPDES General permit.
2. The applicant shall verify that the accessory structure foundation is at or above the regional flood
elevation.
All P,
3., Sediment and erosion control measures must be maintained until all disturbed areas are fully
stabilized and vegetated.
4. Applicants shall document compliance with the items specified in finding #4 above within upon
completion of the project.
a
All activities approved as part of this land use permit shall commence within one year from the date
`"of approval and be substantially completed within two years, after which time the permit expires.
P�tor to expiration, the applicant may request extensions of up to six months from the Zoning
Adinistrator. The total time granted for extensions shall not exceed one year.
This a roval does not allow for any additional construction, grading, filling, or clearing of
vegetation beyond the limits of this request. Any remaining site work above and beyond what is
ified
identas part of this land use permit application shall be subject to the review and approval of
the Zo 'hg Administrator.
It is you sponsibility to ensure compliance with any other local, state, or federal rules or regulations that
apply to%s property. Your information will remain on file in the St. Croix County Planning and Zoning
Department s a matter of public record. Please feel free to contact me with any questions or concerns.
Sincerely,
Pamela Qu!
Zoning Sp `" ialist as Zoning Administrator
Enc: and Use Permit#LU87749
Cc: wn Clerk
ve Olson, LWCD
lvid Hon, WDNR
Sr.CRO1X COUNTY GOVERNMENT CENTER
1 101 CARMICHAEL ROAD,HUDSON, W1 54016 715-386-4686 FAx
PZ @CO.SAINT-CROIX.WI.US WWW.CO_SAINT_CROIX_ti'I US
iw 0 O CD
CD 0
•
0 y
O — C
cD (�
Z „- �
o �. ,
� N �
0-mm SEMEN
CD
CD
(D O -h y y y (D
n c
V ■ �D M M 0
O Q Cl) -h n XM
CL
�
2• M '� O
CD x ` � = M
0 r"L Q. '� --1
-�, o D =r
Immom y 0 �r. �� y
r. _= COL.
CD
0 co y CD
O �
CL
0
F cD
CL
Z
� n
V .
o �
c^
v
State of Wisconsin
DEPARTMENT OF NATURAL RESOURCES
Baldwin Service Center Scott Walker,Governor
VP;Spruce Street Cathy Stepp,Secretary
Baldwin,Wl 54002 Dan Baumann,Regional Director
Telephone (715)684-2914 WISCONSIN
FAX (715)684-5940 DEPT OF NATURAL RESOURCES
November 21,2012
Charles Wahlquist
Wahlquist Bros.
595 200th St
Baldwin,WI 54002
SUBJECT: Coverage Under WPDES General Permit No.WI-S067831-4:Construction Site Storm Water Runoff
Permittee Name: Wahlquist Bros.
Site Name: Wahlquist Implement Storage Sheds
FIN: 47797
Dear Permittee:
The Wisconsin Department of Natural Resources received your Water Resources Application for Project Permits or Notice of
Intent,on November 15,2012,for the Wahlquist Implement Storage Sheds site and has evaluated the information provided
regarding storm water discharges from your construction site. We have determined that your construction site activities will
be regulated under ch.283,Wis. Stats.,ch.NR 216,Wis.Adm.Code,and in accordance with Wisconsin Pollutant Discharge
Elimination System(WPDES)General Permit No.WI-S067831-4,Construction Site Storm Water Runoff. All erosion
control and storm water management activities undertaken at the site must be done in accordance with the terms and
conditions of the general permit.
The Start Date of permit coverage for this site is November 21,2012. The maximum period of permit coverage for this site
is limited to 3 years from the Start Date. Therefore,permit coverage automatically expires and terminates 3 years from the
Start Date and storm water discharges are no longer authorized unless another Notice of Intent and application fee to retain
coverage under this permit or a reissued version of this permit is submitted to the Department 14 working days prior to
expiration.
A copy of the general permit along with extensive storm water information including technical standards,forms,guidance
and other documents is accessible on the Department's storm water program Internet site. To obtain a copy of the general
permit,please download it and the associated documents listed below from the following Department Internet site:
http://dnr.mi.gov/topic/stormwater/construction/forms.html
• Construction Site Storm Water Runoff WPDES general permit No.WI-5067831-4
• Construction site inspection report form
• Notice of Termination form
If for any reason,you are unable to access these documents over the Internet,please contact me and I will send them to you.
To ensure compliance with the general permit,please read it carefully and be sure you understand its contents. Please take
special note of the following requirements(This is not a complete list of the terms and conditions of the general permit.):
1. The Construction Site Erosion Control Plan and Storm Water Management Plan that you completed prior to
submitting your permit application must be implemented and maintained throughout construction. Failure to do so may
result in enforcement action by the Department.
dnr.wLgov
disco nsln.g ov Naturally WISCONSIN
RAPER
2. The general permit requires that erosion and sediment controls be routinely inspected at least every 7 days,and
within 24 hours after a rainfall event of 0.5 inches or greater. Weekly written reports of all inspections must be
maintained. The reports must contain the following information:
a. Date,time, and exact place of inspection;
b. Name(s)of individual(s)performing inspection;
c. An assessment of the condition of erosion and sediment controls;
d. A description of any erosion and sediment control implementation and maintenance performed;
e. A description of the site's present phase of construction.
3. A Certificate of Permit Coverage must be posted in a conspicuous place on the construction site. The Certificate
of Permit Coverage(WDNR Publication#WT-813)is enclosed for your use.
4. When construction activities have ceased and the site has undergone final stabilization,a Notice of Termination
(NOT)of coverage under the general permit must be submitted to the Department.
It is important that you read and understand the terms and conditions of the general permit because they have the force of law
and apply to you. Your project may lose its permit coverage if you do not comply with its terms and conditions. The
Department may also withdraw your project from coverage under the general permit and require that you obtain an individual
WPDES permit instead,based on the Department's own motion,upon the filing of a written petition by any person,or upon
your request.
If you believe that you have a right to challenge this decision to grant permit coverage,you should know that the Wisconsin
statutes and administrative rules establish time periods within which requests to review Department decisions must be filed.
For judicial review of a decision pursuant to ss.227.52 and 227.53,Wis. Stats.,you have 30 days after the decision is mailed,
or otherwise served by the Department,to file your petition with the appropriate circuit court and serve the petition on the
Department. Such a petition for judicial review must name the Department of Natural Resources as the respondent.
To request a contested case hearing pursuant to s.227.42,Wis. Stats.,you have 30 days after the decision is mailed,or
otherwise served by the Department,to serve a petition for hearing on the Secretary of the Department of Natural Resources.
All requests for contested case hearings must be made in accordance with s.NR 2.05(5),Wis.Adm. Code, and served on the
Secretary in accordance with s.NR 2.03,Wis.Adm. Code. The filing of a request for a contested case hearing is not a
prerequisite for judicial review and does not extend the 30-day period for filing a petition for judicial review.
Thank you for your cooperation with the Construction Site Storm Water Discharge Permit Program. If you have any
questions concerning the contents of this letter or the general permit,please contact David Hon at(715)839-3750.
Sincerely,
David Hon
West Central Region
Storm Water Management Specialist
ENCLOSURE: Certificate of Permit Coverage
Page 2
O �+
.y
L
E �
CL
� E cu cu
W W Ea' " °' o
L
CL 0
L
> � w F- Q
0 0 E Z
N CU
p c = — •� a!
0 J-
OZN � o I-- 00
W Lu � � � � � � : 00
a = � ° o � � a� 3 J
HD = � F O
W � p N 0 '0 C �.
LL
C) O � � _Z
Z I- Z = - �. s- L G� O
W > 'O � 0 ~ N N
W
= � 00 0 Q
0 L. = Z 0 �_ Q � m •a
Q +�
C d
H a o .Q •E z. 1 ,o cn 0 CD
CD
U a) p
•N C a) CU Z L� 0 a1 C N
O a) 0 O O '� r L �_ � N
LL H " � ca ,*� o o E 0 > `� N
tq E � c � c L. �, m =CU ,,�
Z Q 0 ,W E E 0 U) 00 C d Q U v N .�
OU ca o :5 I - E s E L
U; C v N y r C O O N d o
W Cl) 'N `� W w L L r
W c � = .0 E ti m E aEi
o Z E — d' r ''"' O > T
_ o = o � _
N .�
O
A N N �j 0 `*' Z •� N Z
co (D +-' CD d '�' � p o
p m +� U
C-4 Q CU Z V N (D }0r
'> p O L L L co
Z o tm cu 0 (D `
Q E
cu CO)
O
0 Z Z L +m+ E
Im 17
cu 00 d 0 O 0 C�
L t Z J
L v � t/? Q J U CL
Q �