HomeMy WebLinkAbout042-1004-95-000 (2) Land Use
ST. CRO NTY
`' �✓ Planning&Land Information
Resource Management
� g
Community Development Department
October 3, 2013 File#: LU88055
Tom Hubbard
Cedar Falls Building Systems, Inc. , y
705 Bay Street, Suite 2H
Chippewa Falls WI 54729
Re: Land Use Permit, Filling and Grading on slopes from 12% to 24.9%
1141120th Street, Roberts WI 54023
Parcel #03.29.18.39B and 42A-05 and 42B
Dear Mr. Hubbard:
This letter confirms zoning approval according to the plans you have submitted for filling and grading
an area on 12% to 24.9 % slopes to construct an approximate 150 foot by 80 foot building for
manufacturing and warehousing on the property referenced above in the Town of Warren. Staff finds
that the proposed project meets the spirit and intent of the St. Croix County Zoning Ordinance with
the following findings:
1. Filling and grading of 12 to 24.9% slopes is allowed with a land use permit in the
Industrial District pursuant to Section 17.12 (8) (a) through (f) of the St. Croix County
Zoning Ordinance.
2. The applicant submitted a stormwater management and erosion control plan that was
approved by the DNR for their storm water runoff permit. With conditions to follow the
approved plan this proposal will not be detrimental to the steep slopes or cause erosion.
3. Steve Olson from the Community Development reviewed the stormwater and erosion
control plan and concurred with the DNR's approval.
4. The proposed structure will be connected to an existing sanitary system.
5. The proposed structure has conditional approval from the State Building Inspector.
Phone 715.386.4680 Government Center, 1101 Carmichael Road, Hudson, W154016 Fax 715.386.4686
www.sccwi.us/cdd www.fqcebook.com/stcroixcountyw cdd @co.saint-Croix.wi.us
Community Developmeaepartment 16 page 2
Based on these findings, approval of the land use permit is subject to the following conditions:
1. Prior to commencing construction, the applicant shall install the approved erosion and
sediment control measures.
2. The applicant shall obtain all applicable permits and approvals required for construction of the
structure and a reconnect permit for the sanitary system.
3. The applicant shall maintain all erosion and sediment control measures until permanent, self-
sustaining vegetation is successfully established on all disturbed areas of the site.
4. No phosphorous fertilizers shall be used on the disturbed areas of the site, unless a soil test
confirms that phosphorous is needed for establishing permanent vegetative cover.
Within 30 days of completing the project, the applicant shall submit to the Zoning Administrator
photos of the stormwater infiltration devices and disturbed areas for documentation of compliance
with conditions. Photos may be sent electronically via e-mail attachment.
This approval does not allow for any additional construction, structures or structural
changes, grading, filling, or clearing of vegetation beyond the limits of this request. Your
information will remain on file in the St. Croix County Community Development
Department. It is your responsibility to ensure compliance with any other local, state, or
federal rules or regulations, including obtaining a building permit from the Town of
Warren.
Please feel free to contact me with any questions or concerns.
Sincerely,
AX 814
Alex Blackburn
Land Use and Conservation Specialist
Enc: Land Use Permit LU88055
Cc: Town of Warren
Karl Jensen, Fetter Logistics, PO Box 484, Hudson WI 54016
File
Phone 715.386.4680 Government Center, 1101 Carmichael Road, Hudson, Wl 54016 Fax 715.386.4686
www.sccwi.us/cdd www.facebook.com/stcroixcountywi cdd @co.soint-croix.wi.us
S '. SRO Y. &AND USE PERMIT File#: zdy
GSC(t/ZSGfZi t ` S Office Use Only
APPLICATION c Revised 6-2013
k e »i6s� r�v��r€r ssaaas i � �i i
Gr ,.j�eisch
Property Owner: Fetter Logistics Contractor/Agent: Cedar Falls Building systems, Inc.
Mailing Address: P.O.Box 484 Mailing Address: 705 Bay Street, Suite 2H
Hudson,WI 54016 Chippewa Falls, WI 54729
Daytime Phone: 612 791-0161 Daytime Phone: 715 723-5511
yt ( )
yt ( )
Cell: (612)791-0161 Cell: (715)308-0839
E-mail:_hrmcoglive.com E-mail:_tomhgcfbsi.com
ii� n hyl�
�MERSIN
00101
150- a .�
Site Address: 1141 120t"Street,Roberts, WI 54023
Property Location: SW 1/4,NW 1/4, Sec. 3, T. 29 N., R. 18 W., Town of Warren
Computer Parcel#: 03.29.18.39B, &42A-05, &42B
Zoning District(Check one): 0 AG. [3 AG.II 0 AG.RES. 13 RESIDENTIAL 0 COMMERCIAL kll INDUSTRIAL
Overlay District(Check all that apply): 0 SHORELAND [3 RIVERWAY [3 FLOODPLAIN 13 ADULT ENTERTAINMENT
Type of Land Use Permit Request(Check one):
0 Animal Waste Storage Facility $550 13 Wireless Communication Tower(Co-location) $550
13 Nonmetallic Mining Operation $550 13 Lower St. Croix Riverway District $350
E3 Signage $350 0 Shoreland $350
D Floodplain $350 13 Temporary Occupancy $350
IiB Grading&Filling, 12-24.9% Slopes $350 0 Livestock Facility $1,000
13 Other:
13 Permit processed in conjunction with a Land Division, Special Exception or Variance $50
State the nature of your request: Land Use Permit—For grading and construction of new building.
Zoning Ordinance Reference Sub Ch 2, Sec. 17.12(8)(a)through(f)
I attest that the information coat in in this application is true and correct to the best of my know dg
Property Owner Signature: Date
Contractor/Agent Signature: Date
iIatlyIpyyryyypp i 4 ii " :_ ime �rypp{y'I"apt .-� ',L) g i�h i,, y/yy, ��.wf.1 ;`■I ii �, - S ��i��NjB�r _ HhI ;q� , bl((j(88�,glkk'a; r t yp(djgp� + °
llgfl4�8HikfRixini B� IIINC I�PrnnL", 'r't{,��gllfiNApkt!wH Y 3is i. �, L'. ( ii� l, � ` � 1 _4�
Complete Application Accepted: _/_/_ By:
Fee Received: _L11f//3 $ Receipt#: g!575Z-
715-386-4680 ST.CROIX COUNTY GOVERNMENT CENTER 715-386-4686 FAX
CDD @CO.SAINT-CROIX.WI.US 1 10 1 CARMICHAEL ROAD,HUDSON,WI 54016 WWW.sccwi.Us1cd
CFIBSMenomonie: 715.235.3541
GENEIZAL DESIGN BUILD CONTRACTOR Chippewa Falls: 715.723.5511 C E DAR FALLS BUILDING Fax 190
www.: 715.235.235.9 190
SYSTEMS, INC
5455 Freitag Drive Menomonie, W154751
i
ST. CROIX COUNTY LAND USE PERMIT APPLICATION
Request Statement
The purpose of this request is to excavate/grade for a proposed 12,000 SF building on
the Enterprise Park property (see attached plat page showing location).The building is
I re-
proposed to be a slab on grade (except for the loading dock foundation wall), pre-
engineered a mason building,
engineered building. The grading will include demolishing masonry g,
excavating (including a borrow area on the property), slo a construction, borrow area
9 ( 9 p
restoration, storm sewer, biofilter bed construction, sanitary sewer, water lines, and
rough grading of salvaged top soil. The landscaping subcontractor will fine grade the top
soil, seed, mulch and place erosion mat as necessary.
The existing septic tanks and drain field will serve the new building. The existing septic
tanks and drain field were designed for the former military base, which served about 50
military personnel. The existing well and pump house will also be utilized for the new
building.
Project Schedule
The intent is to start the project this fall. Construction is expected to be completed by
the end of June. Seeding, fertilizing and mulching will take place in mid to late May
2014. Paving will take place in June 2014.
Contractor List
Cedar Falls Building Systems, Inc. is the Design/Build General Contractor.
TL Sinz Plumbing is the plumbing subcontractor.
Cedar Falls Heating &Air Conditioning is the HVAC subcontractor.
Landscaping subcontractor is RB Landscaping.
Paving subcontractor has not been selected yet.
Earthwork subcontractor has not been selected yet.
evr�ER