HomeMy WebLinkAbout038-1017-40-000 (2) ORDINANCE DECISION TREND ANALYSIS
Data Collection/Analysis Would Include:
Initial Data Screen
Property I.D. # 6 3 ' /D - `
Owner's Name azV Al
Property Address
Zoning District A2 AG AR RES COM IND
Overlay District NONE SHORELAND WETLAND FLOODPLAIN RIVERWAY
Location -- Section, Town, Range, Lot—
Acres
Request Date L,
Denied Approve / Withdrawn Date
Rezoning Screen
Past Zoning A2 AG AR RES COM IND
Variance Screen
Type of Request z fir;
Ordinance Citation
Supporting Evidence Description
Hardship (YES NO
Conditions / , /
Objections YES NO
Snecial Exception Screen
Type of Request
Ordinance Citation
Supporting Evidence Description
Linked to Rezoning YES NO
Conditions
Objections YES NO
ST. CROIX COUNTY
ti WISCONSIN
------� ZONING OFFICE
1 t r r N N r r■ ■...i ST. CROIX COUNTY GOVERNMENT CENTER
1101 Carmichael Road
Hudson, WI 54016-7710
(715) 386-4680
October 20, 1995 File Ref: 68-95
Mr. James A. Meister
1176 County Road H
New Richmond, Wisconsin 54027
RE: Board of Adjustment Decision
Dear Mr. Meister:
The St. Croix County Board of Adjustment has reviewed your
application for a setback variance from a Class C road and has
approved your application with conditions. The enclosed document
is the formal decision regarding your application.
If you have any questions, please do not hesitate in contacting me.
Sincerely,
Thomas C. Nelson
Zoning Administrator
mz
Enclosure
cc: Ruth A. Johnson, Star Prairie Town Clerk
2125 County Road CC
New Richmond, Wisconsin 54017
FINDINGS, CONCLUSIONS, DECISION
AND ORDER OF THE ZONING BOARD OF ADJUSTMENT
ST. CROIB COUNTY, WISCONSIN
Case: 68-95
Complete Application Received: 8/02/95
Hearing Date: 9/28/95
Dates of Publication: Weeks of 9/11/95 and 9/18/95
FINDINGS OF FACT
Having heard all the testimony, considered the entire record
herein, and conducted an on-site inspection, the Board finds the
following facts:
1. The applicant/owner is James A. Meister, whose address is 1176
County Road H, New Richmond, Wisconsin 54017.
2. The applicant on August 2, 1995 filed with the Zoning Office
an application for a setback variance from a Class C road.
3 . The applicant is the owner of the property which is the
subject of the application which is located as Part of
Government Lots 5 and 6 in Section 3, T31N-R18W, Town of Star
Prairie, St. Croix County, Wisconsin.
4. The subject property is presently used for residential
purposes.
5. The property is zoned Ag.-Residential under the current Zoning
Code of the St. Croix County Zoning Ordinance.
6. The Town of Star Prairie supports the application.
7. Tom Nelson, Zoning Administrator, stated this is a request for
a setback variance from a Class C road. Introduced as Exhibit
#1, a site plan of the property showing the existing residence
being 77' from the centerline of Highway H and a request for
a setback for a garage measuring 24' wide by 28' long which
would be set back 63' from the center of County Road H. The
property sits between County Trunk H and Cedar Lake. Nelson
recalled that the ordinance requires any structure to be set
back 100' from the right-of-way line or 133' from the center
of the road; Exhibit #2, a signed permission agreement from
Pearl Walsh, an adjacent landowner; Exhibit #3, a signed
permission agreement from Paul Raddatz, an adjacent landowner;
Exhibit #4, correspondence from the Town of Star Prairie
signed by Ruth Johnson, Clerk, in support of this request.
8. Sandy Meister and James Meister, being duly sworn, stated the
reason the were before the Board was to request a variance to
Y qu
build a garage. Nelson questioned why the garage couldn't be
moved further to the north and closer to the existing
structure. Ms. Meister replied if it were closer it would
block the only existing window in a room in which it would be
located next to.
9. Supervisor Mehls questioned where the garage door would be
located. Mr. Meister said the door would be facing south.
10. Chairman Bradley inquired on the property lines. Mr. Meister
stated the fence is not the property line and said they would
mark the lines for them to see.
CONCLUSIONS OF LAW
The Board concludes that:
1. The Board of Adjustment has authority under Section
17.70(5) (c) 3 to approve or deny an application for a variance.
2 . Section 17.64 (1) (c) requires a setback from a Class C road to
be 133 feet from the center of said road.
3. A literal enforcement of the terms of the Zoning code would
result in unnecessary hardship to the applicant.
4. A variance would not be contrary to the public interest and
would be in accord with the spirit of the Zoning Code.
5. The variance is requested due to limiting physical
characteristics of the property.
DECISION
On the basis of the above Findings of Fact, Conclusions of Law, and
the record herein, the Board approves the applicant's request for
a setback variance from a Class C road on the following vote:
Chairman Bradley Yes
T. Filipiak Yes
A. Jensen Yes
J. Neumann Yes
C. Mehls Yes
with the following conditions:
1. This decision expires on September 28, 1996. No construction
may begin or continue after this date unless an extension is
granted in writing by the Board of Adjustment prior to the
expiration date.
2 . The applicant must complete this project according to the
plans submitted. Minor changes in the project must be
submitted to and approved in writing by the Zoning Office
before the project starts or continues. Major changes must be
brought back to the Board of Adjustment for review and
approval.
3 . The applicant is responsible for obtaining any permit or
approval required for the project by municipal, town or county
zoning ordinances or by the U.S. Army Corps of Engineers
before starting the project.
4. The applicant must provide confirmation that he has completed
the permit process with all other regulatory agencies.
5. The applicant must allow free and unlimited access to the
project site at any reasonable time to any Zoning Office
employee who is overseeing the project's construction,
operation, or maintenance.
6. The Board of Adjustment may change or revoke this decision if
the project becomes detrimental to the public interest.
7. The applicant must keep a copy of this decision at the project
site at all times until the project has been completed.
8. Tom Nelson, Zoning Administrator, shall be notified prior to
beginning the project. Call him at 715/386-4680 so that
compliance inspections can be made.
9. Accepting this decision and beginning the project means that
the applicant has read, understands, and agrees to follow all
conditions of this decision.
APPEAL RIGHTS
This decision may be appealed by any person aggrieved by filing an
action in certiorari in the circuit court of this County within 30
days after the date of filing shown below. The County assumes no
liability for and makes no warranty as to the legality of any
construction commenced prior to the expiration of this 30-day
period or the identity of any person who may claim to be aggrieved
by this decision.
ZONING
///_1 BOARD OF ADJUSTMENT
v� ^��
Signed Y
Chairperson
Dated: 10/20/95
Filed: 10/20/94
i
. . �
__
-- .:
_.
.._ _ .
. ; _
� _
E
_ _
. .� �_ _
_ � .
. _..T: .__....- __
*__ r_ _�_, ..
, .� , - . .
�:.
,��
__ -�
. ._ _ ._.
�m ....� __ � _
_ . _.. ._
_, _ .. _
_ _ _ ,.
_ _ ,�� __
,� - . ,
/..
,.,._ _ _
_ �
..
� � . .
._ _... .
__ _ _
` � ..
_.-- -
_.
__--r- f ._. _ _-__
_.._ _ __
r. ` ._....._.._,`._.._ _ _ .....
_ ---
__ ..._
__.__ ..
._.
'... ....�_._.-e......_.__.._....
__:_ ,
•
Voi-A
0 •
Postic reassured the Board that the banks that have been washing
into the adjoining landowner's property have changed direction and
most would percolate onto the JP Golf property. He noted there is
some grass growth exceeding 8" in some areas, but with the amount
of rain and the severity of the slopes, most of what was
established in those areas has washed out.
Filipiak questioned the stages of development and asked if July was
still the projected opening month. Postic stated there would
definitely be 9 holes open in July, depending on the balance of the
fall and next spring.
Jensen questioned if there was a dedicated wetland on the property.
Postic said no, and that it was not considered an issue.
Nelson stated he had visited these problem sites and had some major
concerns with regard to the stabilization of these slopes in a
timely manner. Nelson questioned the difficulty of the slopes and
what the critical seeding period would be. Nelson asked Postic if
he had the same concerns. Postic stated yes, he had and introduced
Kevin Clunis, the superintendent of the course overseeing the
project on behalf of JP Golf. Postic asked Mr. Clunis to address
this question.
Kevin Clunis, being duly sworn, stated seeding can be difficult
when you get into this time of year and it is all dependent upon
soil temperatures. He said seeding in late fall is okay as long as
the seeds are protected and covered. If some seeds die they simply
over seed and take care of the problems next spring.
Postic put the issue back into perspective stating that three areas
of the golf course have been stabilized and only one was in
question. The one in question is the one area where silt is being
washed onto an adjoining landowner's property.
John Strese and John Strese Jr. , being duly sworn, stated their
concern is with the silt runoff onto their property. Strese stated
three areas have been silted in, two of which are in the CRP
program. He said the water has run off into 3 to 5 of his acres.
Strese Jr. stated JP Golf has installed a culvert, but he doesn't
feel this will solve the problem. Strese said he would like to see
them divert the water. Nelson suggested these two parties work
together and resolve this matter. Mehls and Bradley agreed the two
parties need to cooperate. Nelson suggested working with Land
Conservation to help find a solution to this problem.
Bradley stated the Board would visit the site.
UNFINISHED BUSINESS
Roger/Dorene German
Zoning Administrator Nelson read the Board's decision to
refamilarize them with their past decision on this permit request.
Chairman Bradley added that this permit is currently under appeal
and papers were served upon himself 48 hours ago.
s � •
BOARD OF ADJUSTMENT MEETING AND HEARING
St. Croix County Government Center, Hudson, Wisconsin
(This meeting was recorded by a court reporter. )
Thursday, September 28 , 1995
The meeting was called to order by Chairman Bradley at 8: 34 a.m.
A role call was made. All were present.
Filipiak motioned to approve the agenda as amended, seconded by
Neumann. Motion carried.
Filipiak noted changes to previous minutes of August 25th. Neumann
motioned to adopt minutes as amended, seconded by Filipiak. Motion
carried.
The Board set October 26th as the next meeting date and November
30th, the fifth Thursday, as the subsequent meeting date.
REVIEW OF PREVIOUS PERMITS:
JP Golf Management, Inc.
Nelson recalled this request was reviewed by the Board back in
March and the Board had granted a permit for a golf course. Some
of the concerns the Board had were erosion control with the massive
amount of grading that has been done. There was concern that this
should be stabilized as quickly as possible. Nelson noted this was '
a very unusual summer with some rain falls near the 7" mark which
made it next to impossible to correct some of these problems.
Nelson said he had visited the site with Bob Heise and they noted
some concerns when they were there. They have received some
complaints from neighbors in the area as well as other concerns
from the township. Nelson told the concerned parties he would
bring this issue back on the agenda to see where JP Golf was at
with this project and to see what is being planned to take care of
these problems.
Representatives of JP Golf were on hand. Being duly sworn by
Chairman Bradley, Frank Postic stated he is the owner of JP Golf,
and Rick Korpela stated he is with Northern Clearing, the
contractor building the golf course. Postic also noted this has
been an unusual summer and they have indeed had some problems. He
said they have complied with the permit stipulations and have
stabilized all the slopes that have washed down. Postic said they
have spent extra dollars on a type of material that is to be
guaranteed by Warehauser Corporation, the manufacturer, in some
locations, but not all . The material had washed out and Warehauser
did not guarantee it because it was an act of God. The slopes have
been rebuilt with mulch, purlex mats and sod and it has taken an
incredible amount of time.
Transportation dated 9-11-95 stating German is operating in
violation.
The Board took a 10 minute recess at 9 : 30 am.
1996 BOARD OF ADJUSTMENT BUDGET
During the recess, the Board went back on record to approve a
proposed budget for a para-legal for the Board of Adjustments.
Budget read as follows: St. Croix County Expenditure Budget
Worksheet - Department. Proposed for 196 budget based on estimate
of approximately 4 days per month of para-legal assistance, 8 hours
per day, $14 per hour. The budget would be used to fund the cost
of writing and distribution of decisions of the Board of
Adjustments. The budgeted amount was for $5, 000. Motion by Mehls,
seconded by Jensen to approve the budget as proposed.
The Board reconvened at 9: 53 am.
Roger/Dorene German, continued.
Todryk stated he reviewed Exhibits #1 thru #6. Todryk stated
Exhibit #1, letter from Pioneer, was based on contingencies and did
not constitute a binding contract; Exhibit #2 had no terms stated;
Exhibit #3, letter regarding the reclamation of freon. His concern
since it was a hand written letter and was not on company
letterhead and dated September 27, 1995, Todryk questioned the
validity of this letter; Exhibits #4 & #5, Certificate of Insurance
from OSI in Todryk's opinion, these two exhibits were wide open
contingencies and did not comply with the requirements of the
Board.
Todryk introduced his client, Heather Landin. Landin, being duly
sworn, stated she is an adjoining landowner on two sides of the
German property and that those two areas are fenced. She also
stated she doesn't feel there is a 4 foot buffer area around the
fence line. Landin addressed her concern about the storage of
materials being hazardous and the testing of those materials. She
was concerned about spillage and storm water runoff. German's
property is uphill from her property. Todryk noted there is a
navigable waterway downhill from the German property as well as a
dry run area close to the German fence. Landin also stated her
concern about the materials being burned on the German property.
Todryk reiterated his client feels the Germans have not complied
with the conditions set forth and they believe the 60 day permit
should not be extended and should be ended.
Chairman Bradley asked Todryk what conditions the Board could
impose to make this matter acceptable. Todryk replied "none, we
want it removed. "
In closing, Landin mentioned her concern about the burning of
rags, containers and toxic by-products and the possibility of those
items being burned by German. She said she has spoken with the DNR
and they also share this same concern.
Roger German, being duly sworn, stated he has met all but one of
the conditions which was required of him from his previous hearing.
German stated Heather Landin had made a complaint to the State that
he was operating an illegal junk yard. Two gentlemen from the
State visited his property and informed him he needed a permit to
have junk vehicles hauled onto his property. German stated he was
unaware he needed a license to do this. He also stated he has some
scrap material within his fenced area that he needs to dispose of.
Other than that, he feels he has complied with all the conditions
required of him.
Chairman Bradley questioned German whether the license from the
State is dependent upon the Board of Adjustment's decision. German
replied yes, it was.
Supervisor Filipiak inquired if the fence was up and what the other
conditions were. German stated the fence was up and that he had
obtained letters from companies implying contractual agreements.
Nelson presented copies of these letters and introduced as Exhibit
#1, a letter from Pioneer Tank Lines, Inc. addressing the anti-
freeze issue; Exhibit #2 , a letter from Disposal of America in
Ellsworth, addressing the tire problem; Exhibit #3, correspondence
from Mark Springbourne, owner of Springbourne Specialties, stating
they will reclaim R-12 freon from vehicles brought to their
location at 920 -10th Avenue in Baldwin, Wisconsin, according to
Statute 100. 45 from Roger's Auto Salvage, Registration No. 62-10021
and certified through Hedgeforce Imica. Vehicles will be recorded
by VIN Number and billed on Springbourne Specialties invoices,
letter signed by Mark Springbourne; Exhibit #4, Certificate of
Insurance insuring the property; Exhibit #5, Notification of
Regulated Waste Activity. Nelson was not sure if this was an
application form or a confirmation form; Exhibit #6, correspondence
from Sara Keller from OSI Environmental Inc. stating OSI
Environmental, Inc. is the largest transporter/recycler of non-
hazardous used oil and petroleum products. After testing, OSI will
collect non-hazardous used oil in quantities of greater than 200
gallons at no charge. The letter also states OSI follows strict -
environmental guidelines to ensure the customers of compliance of
cradle to grave tracking of all materials.
Attorney Phil Todryk, being duly sworn, stated he represents
Heather Landin in this matter. Bradley asked Todryk if he thought
it unusual to appeal the conditional permit before the Board had
had an opportunity to deny or approve the permit. Todryk replied
he didn't think it was. Todryk interpreted the written order from
a few months ago to be an appealable order and if they did not
appeal now, they would lose that right. Todryk stated they have
concerns with what has happened so far and they want to make sure
that all the conditions are met and that the rest of this matter
proceeds properly. Bradley stated he felt this appeal was a bit
premature. Todryk disagreed. Bradley allowed Todryk to examine
the previously presented exhibits at which time Todryk presented
Exhibit #7 , a letter to Mr. German from the Department of
The reason he is here today was because there was a problem with
the proposed pole barn (40' x 801 ) which was approximately 30 feet
from Towns Valley Road. The Board tabled the hearing to see if the
Town of Troy could relocate the building. Hense presented Exhibit
pole shed. The plan showed the
#1, a plan showing the proposed p P
fuel tank would be moved to a new location and the new building
would be located north of where the tank is now, going back on the
property, in line with the town shop. The salt shed is shown to be
105' from the right-of-way. Hense stated this would be a better
site for the building. Bradley suggested they inform the adjoining
landowners, Ruth Nelson and the Lennies. Hense said he would and
stated this new location of the building is less intrusive on the
adjoining landowners.
Bradley stated the Board would visit the site and render a decision
later this date.
NEW BUSINESS:
The hearing was called to order at 10: 39 a.m. by Chairman Bradley.
Nelson read the notice of the hearing as published:
PUBLIC HEARING
The St. Croix County Board of Adjustment has scheduled a public
hearing for Thursday, September 28, 1995 at 9:00 a.m. at the
Government Center, 1101 Carmichael Road, Hudson, Wisconsin, to
consider the following appeals to the St. Croix County Zoning
Ordinance. An on-site investigation will be made of each site in
question, after which the board will return for the purpose of
deliberating and voting on the appeals.
1. ARTICLE: 17.64 (5) (a) 2 Driveway Separation on a Class B
Road
APPELLANT: Gerald and Veronica Kusilek, James and Christine
Mikla/Thomas R. Schumacher
LOCATION: S; of the NW; of Section 19, T29N-R16W, Town of
Baldwin
2 . ARTICLE: 17 .64 (1) (c) Setback from a Class C Road
APPELLANT: James A. Meister
LOCATION: Part of Gov't Lots 5 & 6, Section 3 , T31N-R18W,
Town of Star Prairie
3 . ARTICLE: 17 . 36 (5) (c) 1 Setback form Bluffline of St. Croix
River
APPELLANT: Jana Paulson/Sanders Wacker Wehrman Bergly, Inc.
LOCATION: Gov't Lot 51 Section 27 , T30N-R20W, Town of St.
Joseph
4 . ARTICLE: 17 . 64 (1) (d) Setback from a Class D Road
APPELLANT: Richard Lovgren
LOCATION: SW, of the NE; of Section 7 , T30N-R19W, Town of
Somerset
Roger German, previously sworn, gave his response to Landin's
testimony. He stated he had no oils and no anti-freeze on-site.
Bradley asked German what he was burning and German replied he was
burning wood pallets and said he had obtained a permit from the
fire department. German addressed the issue of his property
sloping towards Landin's property and he said it doesn't, it slopes
south to Bob and Rex Hanson's property. He also stated the fence
to the north and the west border Landin's property and the fence is
6 feet in on his property and the backside is 8' to 10' inside his
property line. German stated he is having Pioneer Tank remove the
anti-freeze from his property and Thompson's Coolant and
Refrigeration will be removing the freon. He noted it is illegal
for anyone to come to his property to remove the freon. He said
the freon, from any vehicle being towed to his property, has to be
removed beforehand. Bradley asked German if he was aware of this
regulation 60 days ago and he stated he was not, not until the
gentlemen from the State were out to visit him. The DNR in Madison
gave him the name of Springbourne Specialties.
Supervisor Mehls questioned the removal of oil and asked if it was
removed beforehand or on site. German told him it is removed on-
site and the only oil stored on his property is the oil that is
removed from his own vehicles. German stated his oil will be
picked up by the people from OSI. They will pick it up for free,
200 gallons or more. Anything under 200 gallons they charge a
service fee. Mehls questioned the storage of this oil. German
pointed out that farmers store oil and there isn't a difference
between dirty or clean oil when it comes to storage.
Chairman Bradley asked German if he would abide by the decision and
conditions that the Board imposes if the Board grants his permit to
operate a salvage yard. German replied yes.
Supervisor Filipiak asked if German could obtain a better letter
from Springbourne on company letterhead. German said he would.
Todryk, on behalf of his client and being previously sworn, came
back with additional concerns regarding freon being removed off-
site and the regulations tied to that. He inquired on the distance
between the freon reclamation site and the German operation.
Todryk opined this was a regulation nightmare and every car on
German's property should be tracked to make sure those cars have
gone through the proper procedures. Todryk believes this business
is not an economically feasible business and German's permit should
be terminated.
Bradley stated the Board would visit the site and render a decision
later this date.
UNFINISHED BUSINESS:
Town of Troy
David Hense, Town of Troy Supervisor, being duly sworn, stated he
was before the Board last month and the Board has visited the site.
Tom Schumacher, Attorney, being duly sworn, stated he is
representing the Kusileks. He stated they were denied the special
exception use request last month. The Kusilek farm already has two
residences on it and Exclusive Ag. only allows for two sites on a
parcel . The Kusileks have requested a rezonement from Exclusive
Ag. to Ag.-Residential of the building site of the property located
in Section 7, one mile north of where they are asking for the
driveway variance. They are asking for the building site to be
rezoned to Ag. II which then gives them the possibility of having
a second building site on the Kusilek farm in Exclusive Ag. zoning
in Section 18. Schumacher stated he spoke with Dick Wendt who is
with the Wisconsin DOT in Eau Claire, and he has seen this site.
Wendt had some concerns on how the driveway would hit Highway 63 .
He indicated he would like to see an easement from the Hops and the
driveway go back straight from Highway 63 so that when you actually
enter Highway 63 it would be a straight shot instead of entering at
an angle. Kusilek spoke with Hops and they agreed to provide him
with an easement that would be 20' wide and 115' from the
centerline of Highway 63 and about 82 1/2 ' from the right-of-way
line. The driveway would then come straight back from the existing
field driveway, and then it would curve over onto the Kusilek
property, back along the fence line and back to the building site.
Schumacher presented Exhibit #4, the easement from Hops and the
layout of the driveway. The easement from the Hops states it would
go east five rods from the right-of-way, which is 33 ' from the
centerline.
Supervisor Mehls questioned the effect on the culvert, which was
also a concern of the property owner to the north. Schumacher
stated the runoff that is there now will not change because the
culvert is to the north of where the driveway will be located.
Schumacher also stated that DOT has no problem with the driveway
location subject to the granting of the variance from the Board and
the easement from the Hops. The only concern the DOT has is the
access.
Jule Melby, being duly sworn, stated his concern is the driveway
running on the south side of the culvert going through Hops' pine
trees. Melby stated he doesn't oppose Kusilek building the
driveway, he is opposing the runoff of the dirty water during
construction.
Nelson suggested a stabilization plan that may include riprapping,
seeding and mulching, depending on the time of year the driveway is
installed.
Schumacher agreed that Melby's concern was a legitimate concern and
they would like to make sure that this sort of thing doesn't
happen.
Gerald Kusilek, being duly sworn, stated the field in which the
culvert is located is in CRP. He also said they are only building
a narrow driveway of 14 feet and the field slopes to the west and
north and there would be no water flow to the driveway.
5. ARTICLE: 226 (89) Non-Metallic Mining
APPELLANT: Fritz Anding/Town of Troy
LOCATION: NW', of the NE', , Section 10, T28N-R19W, Town of
Troy
6. ARTICLE: 17 . 18 (1) (r) Commercial Insulation Business
APPELLANT: Barry and Maureen Cicchese/Penguin Insulation, Inc.
LOCATION: NW, of the SE, of Section 22 , T30N-R20W, Town of
St. Joseph
7 . ARTICLE: 15.04 (3) (a) 3 Request for a Holding Tank
APPELLANT: Soldiers of Jesus Christ
LOCATION: SW; , NE; of Section 15, T28N-R15W, Town of Cady
All interested persons are invited to attend said hearing and be
heard. Additional information may be obtained from the office of
the St. Croix County Zoning Administrator, Hudson, Wisconsin at
715/386-4680.
John Bradley, Chairman
St. Croix County Board of Adjustment
Chairman Bradley introduced the other members of the Board as being
Art Jensen, Tim Filipiak, Jerry Neumann and Charles Mehls. Tom
Nelson, Zoning Administrator, was present to assist the Board with
the introduction of the materials as well as recommendations as to
how the ordinances applied. On call was Corporation Counsel Greg
Timmerman. In the alternative, if he is not available, then
Assistant Corporation Counsel Don Gillen.
Chairman Bradley explained the procedures of the hearing requesting
that individuals wishing to testify sign their name in the front of
the room on the sign up sheet provided.
Gerald and Veronica Kusilek, James & Christine Mikla/Thomas R.
Schumacher
Zoning Administrator Tom Nelson indicated this is a request for a
driveway separation variance on a Class B Road. Nelson reminded
the Board the applicants were before them last month requesting a
third residence on the property, which the Board did not approve.
Since that time the property has gone through a rezonement which
opens up the possibility for a second residence on this farm and
there is still the issue of the driveway not meeting the 500'
separation. There was a field access, but what the Kusileks want
to do is take the nonconforming access and put a use on it which
would increase the usage of that access. Introduced as Exhibit #1,
a copy of a plat map showing the location of where the property is
located; Exhibit #2 , a site plan of the property drawn by Tom
Schumacher; Exhibit #3 , a letter from Kevin Klanderman, Baldwin
Town Clerk, stating they are in support of the applicants' request
for a variance for a driveway in Section 18 . Nelson stated he was
at the rezonement hearing at which time the Town recommended
approval and the Planning and Development Committee approved the
rezonement before the County Board.
proposed structure; Exhibit #3 , a card showing color chips of the
structure, indicating the roof color would be sand dune (light
beige sand color) ; Exhibit #4 , a card with the chips for the trim
indicating a Navaho White; Exhibit #5, a card with chips for the
windows and soffits indicating the color Chamois; Exhibit #6, a
letter received by Nancy Reid; Exhibit #7, an easement agreement
for the carport and the septic system; Exhibit #8, a letter from
the Town of St. Joseph in support of this request. Chairman
Bradley inquired on the DNR's stand in this matter and Nelson
replied they are opposed and there was nothing in writing stating
that fact.
Nancy Reid, being duly sworn, stated she is a representative of
Sanders Wacker Wehrman Bergly, Inc. who represents Jana Paulson,
Josephine and Jim Brooksbank, property owners. She stated she is
a landscape architect. Reid said the 102 acre parcel is St. Croix
River shoreline property and in 1973 was legally subdivided to a
one acre parcel and this parcel was sold to their daughter, Jana.
She also stated the setback requirements have changed over the
years and the proposed house would have to be located off the
property in order to meet the current setback requirements. She
said the proposed house would be set back 5 feet from the bluffline
as shown on Exhibit #1. She also addressed the issue of the
existing drainfield stating it would have to be placed off of the
proposed property, referring to Exhibit #7.
Chairman Bradley questioned the possibility of creating additional
space to attach to this one acre parcel to allow for the bluffline
setback. Reid replied that that suggestion has never been brought
up. She then presented a picture of the existing Brooksbank home
showing a view from the river, stating the proposed home would be
built next to that site.
Supervisor Filipiak questioned if the proposed home would be
visible from the river. Reid stated no, it would not. Filipiak
inquired on the square footage of the proposed home without the
garage. Reid stated the square living space was 2200 feet and the
basement would not be considered as liveable space.
Nelson asked what the height of the proposed home would be. Reid
stated the total height would be 25 feet. Reid then went on to
list the requirements that were met. She stated they are 200 feet
away from the high water mark, are proposing a shared driveway and
any plants that are removed will be replaced.
Chairman Bradley questioned Reid if she had consulted with the
Zoning Office regarding this setback request. Reid stated yes, and
said she has walked the property with Jim Thompson and the
Brooksbanks. She said Thompson has been up front and honest about
their situation from the beginning and that he agreed they did have
a hardship with that one acre parcel. She noted at the time the
parcel was created, one acre was the minimum lot requirement in St.
Joseph Township. Since then, the minimum lot size has been
increased. Reid reiterated she feels they do have a legitimate
Bradley stated the Board would visit the site and render a decision
later this date.
The Board took a five minute recess at 11: 17 a.m.
James A. Meister
Zoning Administrator Nelson stated this is a request for a setback
variance from a Class C road. Introduced as Exhibit #1, a site
plan of the property showing the existing residence being 77' from
the centerline of Highway H and a request for a setback for a
garage measuring 24' wide by 28' long which would be set back 63 '
from the center of County Road H. The property sits between County
Trunk H and Cedar Lake. Nelson recalled that the ordinance
requires any structure to be set back 100' from the right-of-way
line or 133 ' from the center of the road; Exhibit #2 , a signed
permission agreement from Pearl Walsh, an adjacent landowner;
Exhibit #3 , a signed permission agreement from Paul Raddatz, an
adjacent landowner; Exhibit #4 , correspondence from the Town of
Star Prairie signed by Ruth Johnson, Clerk, in support of this
request.
Sandy Meister and James Meister, being duly sworn, stated the
reason they were before the Board was to request a variance to
build a garage. Nelson questioned why the garage couldn't be moved
further to the north and closer to the existing structure. Ms.
Meister replied if it were closer it would block the only existing
window in a room in which it would be located next to.
Supervisor Mehls questioned where the garage door would be located.
Mr. Meister said the door would be facing south.
Chairman Bradley inquired on the property lines. Mr. Meister
stated the fence is not the property line and said they would mark
the lines for them to see.
Bradley stated the Board would visit the site and render a decision
later this date.
Jana Paulson/Sanders Wacker Wehrman Bergly, Inc.
Tom Nelson, Zoning Administrator, stated this was a request for a
setback from a bluffline on the St. Croix River. Introduced as
Exhibit #1, a combination of a site plan and a building plan
identifying the request to build a residence on the parcel, showing
the proposed residence being approximately four feet from the
bluffline. The parcel itself is about one acre in size and there
is an existing carport on the property as well as an existing drain
field, both servicing the Brooksbank residence on the adjacent
parcel. The dimensions of the residence are parallel to the
bluffline measuring 73 ' with a depth of 621 . The drainfield, which
will be used to accommodate this residence, will actually be
located on an adjoining property. The person who owns the property
adjacent to this parcel also owns both of the parcels and that is
why his carport and drainfield are on this property; Exhibit #2, a
cross section of the bluff area showing the location of the
• .
Gary Wold, being duly sworn, stated he is a representative of
Cleary Building Corporation, representing the Lovgrens. Wold
stated the setback in question is off of 165th Avenue and is
basically the only location on the property in which the building
can be located due to the terrain. He stated it is very steep on
both sides parallel to the proposed site and is basically a valley.
Bradley inquired how long the Lovgrens have owned the property and
what the total size of the parcel was. Wold stated he did not know
how long the Lovgrens owned it, but the total acreage was 3 . 11
acres.
Nelson inquired if there was a garage currently with the house.
Wold stated no. Nelson also inquired if there was any way the
structure could be placed closer to the septic tank. Wold stated
no, because of the setback requirements and because of the
drainageway between the septic tank and the proposed structure.
Mehls inquired on the dimensions of the proposed building. Wold
stated it was 30' x 501 .
Nelson asked if the structure could be set back further from the
State Highway and closer to the house in order to avoid the 104'
setback from 165th Avenue. Nelson then referred to Exhibit #1.
Wold stated it could be moved eastward, away from the building, up
to 10' to 15' without creating a huge problem.
Bradley questioned the proposed driveway to the proposed garage and
asked how long it would be. Wold stated the driveway would be set
back approximately 15 feet.
Bradley stated the Board would visit the site and render a decision
later this date.
Fritz Anding/Town of Troy
Nelson stated this was a request for non-metallic mining.
Introduced as Exhibit #1, plans for non-metallic mining; Exhibit
#2 , correspondence received from Leonard and Margaret DesLauriers,
as adjacent landowners and private citizens, requesting the close
supervision of the requested operation. Presented as Exhibit #3,
a letter from adjacent landowner, Beth Enloe, stating opposition to
this operation.
Dave Hense, being previously sworn, stated he is representing Fritz
Anding on behalf of the Town of Troy.
Bradley asked if trucks would be a problem at the exit pulling out
of the pit and what direction they would be traveling when they
exit. Hense stated they would be traveling west and the Town has
three to four projects taking about two years with Coulee being the
last one. Hense stated Coulee will require a great deal of sand
lift to bring it up to standards and this location has the best
sand for this project. The Township would have to drive to New
hardship due to the fact there is not sufficient space to build a
house.
Supervisor Neumann inquired on the 25 foot setback from the side
yard and questioned if there would be anything that would allow
them to build closer in that direction. Nelson then addressed the
issue stating that DNR shares some of these same concerns. He
stated when a variance is granted it is granted to provide minimum
relief and he felt this specific matter went beyond minimum relief
because of the size and dimensions of the structure. He stated the
issue of the 25' side yard setback as well as the 25' bluffline
setback are a requirement of the Riverway District. He also
mentioned the color chips were not considered true earth tones and
when a structure is erected along the Riverway District the colors
of that structure should blend in with its surrounding vegetation.
Chairman Bradley questioned the size of the house and the basement.
Supervisor Filipiak asked if it was a walkout basement. Reid
believed it was not a walkout basement. Nelson pointed out on
Exhibit #2 it did appear to be a walkout basement. Neumann agreed.
The Board questioned the total square footage of the proposed home.
Josephine Brooksbank, being duly sworn, addressed this concern and
stated the finished square footage of the home would be 2,490 feet,
exclusive of the garage, and said the plans for this structure are
not for a two story home.
Nelson questioned the door on the garage in reference to the height
of the proposed structure. Supervisor Filipiak made reference to
the Zoning Code stating the height of any structure shall not
exceed 25' from basement to peak of roof. Reid stated she
interpreted the lower level of the home to be the foundation and
not a basement.
The parcel of land in question was transferred to Jana Paulson on
July 31, 1991. At the time of this transfer, James and Josephine
Brooksbank owned property adjacent to this parcel.
Bradley stated the Board would visit the site and render a decision
later this date.
Richard Lovgren
Zoning Administrator Nelson indicated this is a request for a
variance for a setback from a Class D Road. Introduced as Exhibit
#1, a site plan of the property owned by Richard Lovgren
identifying the residence on the property and showing the request
for a proposed garage being 104 ' from the center of 165th Avenue
and 187' from the center of Highways 64 & 35. The diagram also
suggests there is a another driveway in the area. Nelson stated
Exhibit #1 is suggesting the garage is closer than the 100' right-
of-way line. Nelson pointed out there may be a double setback
problem in this situation; Exhibit #2 , correspondence dated
September 26, 1995, from the Town of Somerset stating the approval
of this request.
The third page identifying the floor plan made up of offices, a
conference room and storage area with the back part of the building
being the storage area. The last page identifying the four 10' x
14' overhead doors and one smaller 9' x 9' overhead door; Exhibit
#3 , a facility plan identifying the function of the business which
is for insulation materials to arrive by common carrier on a bi-
monthly basis. The plan also stated the number of employees would
be 11 and the working hours would be from 7: 00 am to 5:00 pm;
Exhibit #4 , a letter from the Town of St. Joseph stating approval
of the request.
Barry Cicchese, being duly sworn, stated he is currently operating
out of Stillwater and has outgrown the facility that they are in
now and would like to build the proposed facility in Wisconsin.
Filipiak asked Cicchese if he has plans for growth in the future
and if he could foresee growth five years from now. Cicchese
replied it has taken him 18 years to get to 11 employees. He also
stated growth is dependent upon the construction industry and he
would like to grow. He said he has planned the size of the
proposed facility to accommodate any growth.
Filipiak questioned if it was blown insulation. Cicchese stated it
was blanket insulation for walls and blown for ceilings. He also
mentioned the insulation is compression packaged to be handled by
fork lifts.
Bradley inquired if there were any chemicals or solvents to be
stored on site. Cicchese replied no.
Filipiak inquired where the trucks get their fuel and where they
are repaired. Cicchese stated the gas for their trucks is obtained
at local stations and the trucks are repaired by Valley Truck
Service in Bayport. He stated they do not have any fork lifts at
this time and he anticipates having LP powered lifts.
Neumann questioned the frequency of delivery. Cicchese stated
during the busy time of year they would probably have two
deliveries a week.
Nelson inquired if there would be any retail business occurring at
this location. Cicchese stated no, there wouldn't be, and he did
not anticipate any.
Bradley questioned if his products and services diminish in the
winter. Cicchese mentioned his slowest time is in the winter,
February to April.
Bradley inquired as to the fleet of his trucks. Cicchese stated he
has two small trucks for blanket insulation, three trucks licensed
@ 2200 gross weight and a total fleet of 10 trucks.
Bradley inquired on the number of acres he had purchased. Cicchese
stated he has a total of 3 acres.
Richmond or Minnesota at a great deal of expense if located
elsewhere.
Bradley questioned the completion of Highway 35 in two years.
Hense stated he didn't think it would be completed in that time and
had mentioned to Nelson he would like the option of a third year,
although the adjoining landowners would like to see it completed
within the two year time frame.
Hense addressed the issue of possibly stock piling the sand which
in turn would alleviate one problem and create another. He also
stated the pit, as it stands right now, is an eye sore. He
addressed the violations and problems with the pit when it was
opened for Kilkarney Golf Course. He stated the Town of Troy is
aware and sensitive to those problem issues and made a promise this
area would be reclaimed.
Hense noted Fritz Anding would like to see this project completed,
reclaimed and turned into a buildable lot when this project is
done.
Hense stated the working hours would be from 7 : 00 am to 3:30 pm in
the summer and 6:00 am to 2 : 30 pm in the winter. There would be no
working on Saturdays or Sundays, but they may run an hour over if
they need to meet a deadline. He said the township people would be
the only people who would be going in and out of the pit and the
only other people who would be hauling would be the people who are
hauling strictly for the Town of Troy. Bradley asked if any
private enterprises would be using this pit. Hense assured him the
Township would be the only user and that Mr. Anding understands
this.
Nelson stated he didn't feel the Town had a good reclamation plan
and recalled there not being a lot of topsoil in this area. Hense
stated they would probably have to haul some in and do some seeding
afterward.
Bradley questioned the location of the Enloe property. Hense said
he wasn't sure and also noted they weren't at the regular Board
meeting. Hense stated the Town wants to be good neighbors and keep
costs down.
Bradley stated the Board would visit the site and render a decision
later this date.
Barry and Maureen Cicchese/Penguin Insulation Business
Nelson indicated this is a request for a special exception use
permit. He stated the property is currently zoned Commercial and
the requested use is not one of the permitted uses. Introduced as
Exhibit #1, a map identifying the location of the property; Exhibit
#2 , a four page plan showing a picture of what the building will
look like. The second page showing a site plan identifying the
proposed building measuring 50' wide by 120' long, having a
driveway and a parking area approximately 65' wide and 75' long.
Jana Paulson/Sanders Wacker Wehrman Bergly, Inc.
Motion by Bradley, seconded by Neumann to deny the request of the
applicant for a setback variance from the bluffline of the St.
Croix River. The following vote was taken: Filipiak, yes; Jensen,
yes; Neumann, yes; Mehls, yes; Bradley, yes. Motion carried.
Richard Lovgren
This matter is postponed until the October Board of Adjustment
hearing as the Board members want more information.
Fritz Anding/Town of Troy
Motion by Filipiak, seconded by Bradley to approve the request of
the applicant for non-metallic mining and reclamation with the
conditions that the hours of operation are 7:00 a.m. to 4:30 p.m.
in the summer and 6:00 a.m. to 3:30 p.m. in the winter. There
would be no working on Saturdays or Sundays; no one except the
Township is to use this operation; a reclamation plan must be
submitted to the Zoning Office. The following vote was taken:
Filipiak, yes; Jensen, yes; Neumann, yes; Mehls, yes; Bradley, yes.
Motion carried.
Barry and Maureen Cicchese/Penguin Insulation, Inc.
Motion by Filipiak, seconded by Neumann to approve the request of
the applicant for a commercial insulation business with the
conditions that the hours of operation will be from 7:00 a.m. to
5:00 p.m. Monday through Friday and that no hazardous material is
to be stored. The following vote was taken: Filipiak, yes;
Jensen, yes; Neumann, yes; Mehls, yes. Bradley, yes. Motion
carried.
Soldiers of Jesus Christ
This matter was postponed until the October, 1995 Board of
Adjustment hearing.
Respectfully submitted:
Jerome Neumann, Secretary
mz
Nelson inquired where the trucks would be parked. Cicchese stated
they would be parked outside.
Bradley stated the Board would visit the site and render a decision
later this date.
The Board recessed at 12 :55 pm to visit the sites.
DECISIONS
Having completed the hearing testimony, the board visited each site
in question. Upon completion, the following decisions were
rendered:
Roger and Dorene German
Motion by Jensen, seconded by Mehls to approve the request of the
applicant for a special exception use for a salvage operation with
the following conditions: The applicant must clearly identify a
method of disposing tires, listing sources of disposal and written
agreements by sources and submit them to the Zoning Office; the
applicant must clearly identify a method of disposing solvents,
listing sources of disposal and written agreements by sources and
submit them to the Zoning Office; the Zoning Office has the right
to inspect the property at any time; the salvage items are to be
neatly stored within the fenced area; the facility must be code
compliant with all State and County regulations; all containers for
waste liquids are to be labeled and used to store only the material
on the label; the area of screening is to be maintained as built
within the property boundaries; contract agreements are to be
signed by the applicant and any contractor for removal and disposal
of solvents, freon, oil and batteries; the applicant can have no
more than 40 junk vehicles on the premises at any time; the
applicant is to establish a head quarter building; the applicant
has until November 20th, 1995 to meet all conditions imposed. The
following vote was taken: Filipiak, yes; Jensen, yes; Neumann,
yes; Mehls, yes; Bradley, yes. Motion carried.
Gerald and Veronica Rusilek, James and Christine Mikla/Thomas R.
Schumacher
Motion by Neumann, seconded by Jensen to approve the request of the
applicant for a driveway separation on a Class B road with the
conditions that the waterways are to be protected from erosion; a
36 inch culvert is to be used and seeding and mulching is to be
done upon completion of said driveway. The following vote was
taken: Filipiak, no; Jensen, yes; Neumann, yes; Mehls, yes;
Bradley, yes. Motion carried.
James A. Meister
Motion by Mehls, seconded by Filipiak to approve the applicant's
request for a setback variance on a Class C road as presented.
The following vote was taken: Filipiak, yes; Jensen, yes; Neumann,
yes; Mehls, yes; Bradley yes. Motion carried.