HomeMy WebLinkAbout1984
i
Y
r
I
~9. i
1120,
i s I° o.
rr
,5G
CHICAGO AND NORTHWESTERN RAILROAD SYSTEM
^8e
~z,
e~ Cl
E 99.62°
°
6.67 ACRES E= 99.26
290, 427.8 SQ. FT
4
C T'ERLjkE C. THe u,
LOADING fC
AND RAMP
Em 98-63'
t4A
L1GH T R/W
POLE
NOTE=
BENCH MARK IS HAIL. IN FUEL
LIGHT POLE ASSUMED AT 100.00' LEGEND
SCALE 0 I°°X 24IRON PIPE SET
E= 88. 12 '
NOTE • _ FENCE CORNERS
SEE WARRANTY DEED VOLUME 439,
PAGE 526, FOR RIGHTS TO EXTEND
POWER POLE
SPUR TRACK.
x - CHAIN LINK FENCE
E= 9$.22" a: so ~ TELEPONE PEDISTAL
ST CROIX COUNTY MONUMENT
L, rsl le:'a[ 4. t Lt UV iI,. - 'y 15:. Y,L C4l .'Yd 5(.LV 115.E I1 _'~ci ilU SUL VUYOr®.. veyor, ao nerepy certiry
to the best -t
of my knowledge and belief, that on September 20, 1984, I
cr'be' and mapped property according to the official recor
map is a correctly dimensioned representation to scale of
buildings and improvements do not t0.8`on fence and 4' on
6®CT 1/4 rOPNFR
the boundary lines, and that no encroachments by adjoining
survey.
I
f