Loading...
HomeMy WebLinkAbout1979 A C 1/2 - 1/4-ICI/4  T28N,R18W 2"X30"IRON PIPE SET DESCIUPTIO C:E'Inii -A` C.1 1 VLI.L'11T T" o So=h half of Uhe Northeoot Quarter {S~tlttarA0 p Uhe as half az the SotzLr cuartexs of the North:' ost quay ter (El Suf.z x i'tRr1, the S arch hal.. of une orthea4 quarter of Southeast quarter (x1,k ilk;; SEs„) i also a parcel in the South half az .qT Northeast quarter of the Southeast quarter (SI AiEr SE-) described as fal.lo;'rs. tD Starting at the iIJort' ast corner of said half forty, thence South along the ' ni line of said half forty 200 feet° thence East paral?el v`h the North line of ua s cp said S;I ; NE .l SL y; 325-;,; f -wet, thence lartLi pa., al iel vn th. saiIlu d nse line 200 fare to sand north line, thence ;test along said North line 3252 feet to the paint beFinring, all in Section 28, Ta:'rnship 28 North, Range 18 Iestg 281.04' ~s ,MEMO 114 a 1'X24 '{1' 6f engineering o 1y PROJECT TITLE CIVIL ENGINEERING LAND SURVEYING • BUILDING DESIGN 101 North Main River Falls. Wisconsin SHEET TITLE N5929]