Loading...
HomeMy WebLinkAbout020-1374-03-000 (2) Phone 715.386.4680 Government Center, 1101 Carmichael Road, Hudson, WI 54016 Fax 715.386.4686 www.sccwi.us/cdd www.facebook.com/stcroixcountywi cdd@co.saint-croix.wi.us October 21st, 2015 File#: LUP-2015-008 Mark & Linda Sturtevant 625 Hickory Rd Hudson, WI 54016 RE: Land Use Permit – Construction of Principal Structure in Riverway District Site Address: 192 Starr Wood, Parcel # 020-1374-03-000, Sec. 12 T29N R20W, Town of Hudson Mr. & Mrs. Sturtevant, Your Land Use Permit application has been conditionally approved for the construction of a principle structure (dwelling) in the Lower St. Croix Riverway Zoning District. Be sure to review the conditions of the permit, as they must be followed implicitly. Failure to follow the conditions will resu lt in enforcement action and possible revocation of the permit. It is your responsibility to contact the Town of Hudson about any permits that may be required by the Town. Facts & Background Information: 1. The property is Lot 3 of Starr Wood, approximately 1.68 ac in size, and partially located in the Lower St. Croix Riverway Overlay Zoning District. 2. The lot is currently undeveloped and was purchased by the owner in July, 2015. 3. The proposal is to build a principle structure with an attached garage. No detached accessory structures are proposed. 4. The majority of the proposed structure will be located within the Lower St. Croix Riverway District, with a small portion that is located in the Town of Hudson jurisdiction (underlying zoning district). 5. The proposal within the Riverway District includes ≈ 9,736 ft2 of total land disturbance (POWTS, dwelling, driveway) 6. The proposed structure is approximately 25’ in height, well under the 35’ maximum allowable. 7. The structure is greater than 25’ from the east property line, and the west portion of the property is located outside the Riverway boundary, in the Town of Hudson jurisdiction. 8. The structure meets the required setback of 40’ from the bluffline/slope preservation zone (≈47’), and will meet all the required performance standards for the reduced setback. 9. The structure will be located will beyond 200’ from the OHWM of the St. Croix River. 10. All impervious surfaces have been identified in the plan and have infiltration devices/measures that will accommodate the runoff from a 1.5” rainfall event before any surface flow leaves the property. Based on these findings, approval of the land use permit is subject to the following conditions: 1. There shall be no land disturbance in excess of 10,000 ft2 in the Riverway District. Any limits imposed by the Town of Hudson are beyond the jurisdiction of St. Croix County. 2. The proposed principle structure shall be no taller than 35’, as measured according to the standards in SCC Section 17.09. 3. The structure shall meet the 25’ sideyard setback on the eastern property line. P a g e 2 Phone 715.386.4680 Government Center, 1101 Carmichael Road, Hudson, WI 54016 Fax 715.386.4686 www.sccwi.us/cdd www.facebook.com/stcroixcountywi cdd@co.saint-croix.wi.us 4. The structure must meet the performance standards detailed in Section 17.36(G)(5)(c)(2)(a); by not protruding above the bluffline when viewed from the midline of the St. Croix River, not being located in a slope preservation zone, being earth-toned in color, and remaining visually inconspicuous. 5. The structure shall be greater than 40’ from the bluffline setback, and no ground disturbance shall be done within 40’ bluffline setback. (Per phone conversation with Bruce L. on 10/21/15 @ 4:30p.m.) 6. All impervious surfaces shall be drained to designed retention/infiltration areas that will accommodate a 1.5” rainfall event. All design & maintenance requirements per the stormwater design plan shall be followed, and an affidavit must be recorded that stipulates the plan and this approval be followed in perpetuity, to insure their proper operation. 7. All vegetation proposed in the stormwater design plan shall be maintained in a manner that promotes the proper operation of the rain gardens, and all debris must be removed on a regular basis to prevent stormwater from leaving the intended detention/infiltration areas. 8. The construction of the stormwater retention/infiltration devices must be completed within 60 days of the final grading at the site, or as soon as weather permits. Contact this department if 60 days is not enough time to finish constructing them after final grading is finished. The owner or owner’s agent must contact this department for an onsite verification at the following times in the construction sequence: I. After erosion control has been put in place and before any land disturbance occurs. II. Before any erosion control measures are removed, as there must be at least 70% vegetative cover established. III. After the construction of the stormwater retention devices have been completed. This permit is valid for one year, with the possibility of up to two (2) extensions if the applicant submits a permit extension fee and documentation. This approval does not allow for any additional construction, structures or structural changes, grading, filling, or clearing of vegetation beyond the limits of this request. Your information will remain on file in the St. Croix County Community Development Department. It is your responsibility to ensure compliance with any other local, State, or Federal rules or regulations, including contacting the Town to inquire if they require a permit. Please feel free to contact me with any questions or concerns. I am available Monday-Friday from 8:00-5:00. Thanks, Craig Dantoin Land Use Technician Cc: Town of Hudson File Ecc: Brian Wert