7/27/2017
Trevor & Alison Schug
1224 Wren PL
New Richmond, WI 54017
RE: Conditional Approval: Land Use Permit, File# LUP-2017-022
Project Location: 13.30.19.1203, Town of Somerset
Project Address: 1597 84th Street
Dear Trevor & Alison Schug,
Community Development staff have reviewed the Land Use Permit application for the construction
of a new Single Family Dwelling and land disturbance >2,000 sq. ft. within the Shoreland Overlay
District, Chapter 17.30. The request has been conditionally approved based on the application
submission and following findings.
• The proposed project meets all applicable setbacks; there is not a bluffline on the
property.
• The Impervious Surface calculation is less than 15% (40/o); therefore, mitigation is not
required.
• Vegetation will not be disturbed 35-feet inland to the Ordinary High Water Mark (OHWM).
• The erosion and sediment control plan submitted meets WDNR Technical Standards.
• The property received a State Sanitary Permit (#597424); coverage is valid for two years.
Based on these findings, approval of the Land Use Permit is subject to the following conditions:
1. Proposed erosion and sediment control (silt fence) shall be installed prior to any land
disturbance activity, excavation and/or soil placement.
2. A tracking pad shall be installed prior to any land disturbance or construction activities.
Wisconsin DNR Conservation Practice Standard 1057, Stone Tracking Pad shall be
followed; this standard is enclosed.
3. The 100-foot building setback from the road shall be flagged prior to construction.
4. St. Croix County reserves the right to require additional sediment and erosion control
measures to be installed during construction and/or land disturbance activities due to site
conditions.
5. Phosphorus fertilizer shall not be used to establish and/or maintain vegetation, unless a
soil test confirms phosphorous is needed.
Phone 715.385.4680 Government Center, 1101 Carmichael Road, Hudson, Wl 54016 Fax 715.386.4685
www.sccwi.us/cdd www.facebook.com/Stcroixcountyw i cdd@co.saint-croix.wi.us
• Land Use
11 U :1 T Y Planning 8 Land Information
ST. C R O I---
Resource Management
la(
Community Development Department
6. Permanent vegetation shall be established once final grade is reached. A temporary cover
crop such as oats, winter wheat or rye shall be applied on all disturbed areas if seeding
cannot occur prior to freeze-up (generally Sept.15th).
7. The applicant shall be responsible to secure any other required local, state or federal
permit(s) and approval(s) prior to land disturbance activity.
Failure to comply with the terms or conditions above may result in the revocation of this
permit by the Zoning Administrator according to Chapter 17.30(13).
This approval is subject to the conditions listed above; it does not allow for any additional
construction, structures, grading, paving, filling or clearing of vegetation beyond the limits of this
request. Your information will remain on file at the St. Croix County Community Development
Department suite. It is your responsibility to ensure compliance with any other local, state, or
federal permitting or regulations, including contacting the Town of Somerset and the Wisconsin
Department of Natural Resources to inquire if additional permissions are required.
This permit is valid for one year, with the possibility of up to two (2) six month extensions if the
applicant submits the appropriate permit extension fee and documentation to the Zoning
Administrator. The permit card must be posted on the job-site and visible from public view.
Please feel free to contact me with any questions or concerns. I am typically available Monday-
Friday from 8:00-5:00 PM. If you would like to schedule an inspection, please call the main office
so they can direct the next available staff member to accommodate your request as soon as
possible; (715) 386-4680.
Respectfully,
Sarah Droher
Land Use Technician II
EC: townsom@somtel.net
trevorschugC@Qmail.com
1anekleaf(Igmail.com
CC: File
Enclosure: Standard 1057, Stone Tracking Pad
Phone 715.386.4680 Government Center, 1101 Carmichael Road, Hudson, Wl 54016 Fax 715.386.4686
www.sccwi.us/cdd www.focebook.com/stcroixcountywi cdd@co.saint-croix.wi.us
Stone Tracking Pad and Tire Washing
(1057)
Wisconsin Department of Natural Resources
Conservation Practice Standard
1. Definition
3. The aggregate shall be placed in a layer
A stabilized pad of stone aggregate or tire at least 12 inches thick. On sites with a
washing station located at any point where traffic high water table, or where saturated
will egress a construction site. conditions are expected during the life
of the practice, stone tracking pads shall
II. Purpose be underlain with a WisDOT Type R
geotextile fabric to prevent migration of
The purpose of this standard is to reduce off-site underlying soil into the stone.
sedimentation by eliminating the tracking of
sediment from construction sites. 4. The tracking pad shall be the full width
III. Conditions Where Practice Applies of the egress point. The tracking pad
shall be at a minimum 50 feet long.
Either a stone tracking pad or tire washing 5. Surface water must be prevented from
station shall be used at all points of construction passing through the tracking pad.
egress. This standard applies where construction Flows shall be diverted away from
traffic is likely to transport sediment off site. tracking pads or conveyed under and
IV. Federal, State, and Local Laws around them by using a variety of
practices, such as culverts, water bars',
Users of this standard shall be aware of or other similar practices.
applicable federal, state, and local laws, rules,
regulations, or permit requirements governing B. Tire washing: If conditions on the site are
the use and placement of this practice. This such that the sediment is not removed from
standard does not contain the text of federal, vehicle tires by the tracking pad, then tires
state, or local laws. shall be washed utilizing pressurized water
before entering a public road.
V. Criteria
1. The washing station shall be located on-
This section establishes the minimum standards site in an area that is stabilized and
for design, installation and performance drains into suitable sediment trapping or
requirements. settling device.
A. Tracking Pad: 2. The wash rack shall consist of a heavy
grating over a lowered area. The rack
1. The tracking pad shall be installed prior shall be strong enough to support the
to any traffic leaving the site vehicles that will cross it.
2. The aggregate for tracking pads shall be C. Rocks lodged between the tires of dual
3 to 6 inch clear or washed stone. All wheel vehicles shall be removed prior to
material to be retained on a 3-inch leaving the construction site.
sieve.
Conservation Practice Standards are reviewed periodically and updated if needed. To obtain the current version of WDNR, WI
this standard, contact your local WDNR office or the Standards Oversight Council office in Madison, WI at (608) 833-1833. 08/03
Words in the standard that are shown in italics are described in IX. Definitions. The words are italicized the first time they are used in the text.
Z
VI. Considerations B. The tracking pad performance shall be
maintained by scraping or top-dressing with
A. Vehicles traveling across the tracking pad additional aggregate.
should maintain a slow constant speed.
C. A minimum 12-inch thick pad shall be
B. The best approach to preventing off-site maintained.
tracking is to restrict vehicles to stabilized
areas. IX. Definitions
C. It is always preferable to prevent sediment Water bar (V.A.5): A shallow trench or
from being deposited upon the road than diversion dam that diverts surface water runoff
cleaning the road later. Sediment on a road into a dispersion area.
can create a safety hazard as well as a
pollution problem.
D. Any sediment tracked onto a public or
private road should be removed by street
cleaning, not flushing, before the end of
each working day.
VII. Plans and Specifications
A. Plans and specifications for installing
tracking pads shall be in keeping with this
standard and shall describe the requirements
for applying the practice to achieve its
intended purpose. The plans and
specifications shall address the following:
1. Location of all points of egress with
tracking pad locations shown
2. Material specifications conforming to
standard
3. Schedule for installation and removal
4. Standard drawings and installation
details
5. Stabilization after removal
B. All plans, standard detail drawings, or
specifications shall include schedule for
installation, inspection, and maintenance.
The responsible party shall be identified.
VIII. Operation and Maintenance
A. Tracking pads and tire washing stations
shall, at a minimum, be inspected weekly
and within 24 hours after every precipitation
event that produces 0.5 inches of rain or
more during a 24-hour period.
WDNR
08/03
t
f
'
i
8
~mm ~ r
k
Xt
"I,
a
t s
i
r
C7
ST. CROIX CQUNTY * LAND USE P IT File#: LqV-dc117--61d9
APPLICA /G//V'nL Res duM°o Only
JUN 1 APPLICANT INFORMATION
ir~iCl~d~' I ,('~V a'~t u ~
Contractor/Agent: L Oc
~S4f~~
;ONIR U~~ D AEWLOPh ENT
Mailing Address: W l ~'~-t o1-- Mailing Address: 6?-74iZ 4616ah 67__
yl-e1N qE l c- .VWVu j 6d it V/0 15~1~~Z
Daytime Phone: (7S1~c~RZ ~3 !Z Daytime Phone: (J/~7 7
Cell: ( ) U~ Cell:
E-mail: e V a( Sc h" CO.~ q N'L4[ 1 • Cy'N'\-E-mail: jet r{ c' k_ 1-P XL7 C q W1a l ~ . Czr~~
SITE INFORMATION
Site Address: I S-q 7 Q q ,14-L 51
Property Location: IV C 1/4, 1/4, Sec. 1 . T. Z~O N., R. ! W., Town of SO "rS-e.4
Computer Parcel ~Z °Z i 3 ~o O b~
LAND USE INFORMATION
Zoning District (Check one): D AG. D AG. II D RURAL RES. D RESIDENTIAL D COMMERCIAL D INDUSTRIAL
Overlay District (Check all that apply): D SHORELAND D RIVERWAY O FLOODPLAIN D ADULT ENTERTAINMENT
Type of Land Use Permit Request (Check one): Please refer to the current fee schedule on our website.
D Lower St. Croix Riverway District D Wireless Communication Tower (Co-location)
D Shoreland D Temporary Occupancy
D Signage D Nonmetallic Mining Operation
D Floodplain D Animal Waste Storage Facility
D Grading & Filling, 12-24.9% Slopes D Livestock Facility
D Other:
D Permit processed in conjunction with a Land Division, Special Exception or Variance
State the nature of your request:
Zoning Ordinance Reference
SIGNATURE
! attest that the information contained in this application is true and correct to the best of my knowledge.
Property Owner Signature: Date
Contractor/Agent Signature: Date & - 5 7
OFFICE USE ONLY 1
Complete Application Accepted: & /dr), lAv I By: S"~Y<<~C~ ~ hrcr
Fee Received: _z~ gpw 7 $15 v u0 t
715-386-4680 St. Croix County Government Center 715-381-4400 Fax
cdd@co.saint-croix.wi.us 1101 Carmichael Road, Hudson, WI 5401E www.sccwi.us/cdd
standOld Erosion Co trol PICIM
for 1- & 2-Family Dwelling Construction Sites
~
According to Chapters Comm 20 & 21 of the Wisconsin Uniform Dwelling Code, soil erosion
control information needs to be included on the plot plan which is submitted and approved prior
to the issuance of building permits for 1- & 2-family dwelling units in those jurisdictions where
the soil erosion control provisions of the Uniform Dwelling Code are enforced. This Standard
Erosion Control Plan is provided to assist in meeting this requirement.
Instructions:
1. Complete this plan by filling in requested information, completing the site diagram and marking
appropriate boxes on the inside of this form.
2. In completing the site diagram, give consideration to potential erosion that may occur before, during, and
after grading. Water runoff patterns can change significantly as a site is reshaped.
3. Submit this plan at the time of building permit application.
PROJECT LOCATION /J- 1P J' -
Please indicate north
BUILDER Jtl p n- - LO&4-- ~'~6`rrr~~;;• OWNER Tires by completing the arrow.
WORKSHEET COMPLETED BY -eta Li-< DATE i~a ~=r7
SITE DIAGRAM scale: 1 inch = feet N
EROSION
CONTROL PLAN
LEGEND
-A P -1 PROPERTY
LINE
EXISTING
DRAINAGE
TD TEMPORARY
DIVERSION
FINISHED
DRAINAGE
LIMITS OF
GRADING
Q SILT
FENCE
STRAW
BALES
El GRAVEL
VEGETATION
1
SPECIFICATION
ARIN ® TREE
PRESERVATION
STOCKPILED
SOIL
d
F, x
Project schedule for Trevor and Alison Schug home
Tentative dates
Early July install silt fence
Mid July install driveway, excavate for basement
End of July backfill house
End of August final grade
September - seed
14
j~,y-e
i _
75
x LOT r," ~a,~.
SON-TEST, AM 1 56 SQ. FT. y~ 14 0
\ F TWICAL „ - z 7 f
3.00 ACRES m "0
z o mf3 Y u
O O m a ?
I . \ \ hry \ Y Z
\,JT OJ
.N 36 \ \ Q
t S \/~j/ S
1
I I W
& a co
82
SOT 2® _ a
/ 10
130812 SQ. FT, o j
o`~Q ~0 /ry CT 3.00 ACRES ° o
58945'56"E 64® B5B 0 o v °
435.64'
Z N Q
ez
u'
W w ta- V) Z
n" o vi Q./ _ I
/ 0 J L-Li
o- Lu
yob rW n ¢ F-
o6 Z (n 0
N _J D ~ W Q
OT 3fi ~N z J
W cn ° z
30$69 SQ, FT. W Z Q
3.00 ACRES a <
N89'53'59"E v w
612.05' go W m
y9 ® Z w
Q = U
1o
N W
l nT A
T ♦n