Michael and Sharon Kroll
736 72" Street
Somerset, WI 54025
RE: Conditional Approval: File# LUP-2018-005
Project Location: 24.31.19327D; Town of Somerset
-Dear Michael and Sharon Kroll,
Community Development staff have reviewed the Land Use Permit application for construction of a
ne.y accessory structure (shed - no interior plumbing) and land disturbance (approximately 14,000
square feet) within the Shureland Overlay District, Chapter 17.30. The request has been
conditionally approved based on the application submission and the following findings. Please see
;he enclosed site plan to reference the general erosion control and grading notes.
• Height of the accessory stn.cture according to Chapter 17.09 254. Structure Height Measurement,
will be 15-feet; therefore compliant w'th the ordinance.
• Erosion and Sediment Control plans have been submitted that meet Wisconsin Department of
Natural Resources Technical Standards. Best Management Practices will be incorporated.
Vegetation will not be removedjdisturbed within 35-feet of the Ordinary High Water Mark (OHWM).
• Impervious Surface (IS) is not proposed within 300-feet of the OHWM, therefore IS standards do
not apply.
• One driveway access is allowed per residential president al land use lot; this requirement has been
in effect since the 1978 St. Croix County Zoning Ordinance.
Based on these findings, approval of the Land Use Permit is subject to the fo lowing conditions:
1. A pre-construction inspection is required to discuss the construction timeline and verify the silt
fence nas been installed per plan prior to any land disturbance activity. Please call the inspector at
(715) 386-4683 to schedule this inspection.
a. The road setback (50' form right-of-way) shall be flagged to the closest
point of the road prior to road construction.
2. St. C-oix County reserves .he right to require additional sediment and erosion control measures to
be installed if found necessary due to site-specific concerns.
3. Permanent vegetation shall be established once final grade is reached or as soon as applicable. A
temporary cover crop such as oats, wir,te- wheat or rye, OR, mulching may be necessary if the site
is not stabilized by September 15, 2018.
Pion' 715 386_a680 Government Cente; 1101 Cc,rmichco >cl Rood, Hudson, W/ 54016 Fox 715.386.4685
, ~ wu 1 S4 1_ r, WS/( Jri L IVIVI[l ,-C! r (d COrr,_ r , Cot;;) 'y'nvr Crio' c t7llrr r x I"; t:`,
• • Land 1!+r
S'7-. C, ~KOI;X UNT Y Plunnin,/ xI ruu! Information
1 Re tour, a Nanaelemenr
Tom...
Community Development Department
4. A secondary driveway access shall be removed prior to closing out this Land Use Permit. Per
discussion with the property owner on February 13, 2018, the northern access will be. abandoned.
An internal loop is permissible, outside of the road right-of-way.
5. All temporary erosion contra measures shall be left in place and maintained until the site has reached
a point of at least 70% permanent vegetation.
6. A post-construction inspection is required prior to removing the temporary sediment and erosion
control measures. Please call -.he inspector at (715) 386-4683 to schedule this Inspection.
7. It is the applicant's responsibility to secure any other required local, state or federal permit(s) and
approval(s) prior to land disturbance activity. i
8. Failure to comply with the terms or conditions above may result in the revocation of this permit by
the Zoniro Administrator according to Chapter 17.30 (13).
This approval is subject to the conditions listed above; it does not alloy for any additonal
construction, structures, or buildings beyond the limits of this request. Your information will remain
on file at the St. Croix County Community Deveopment Department suite. It is your responsibility
to ensure compliance with any other local, state, or federal permitting or regulations, including
contacting the Town of Somerset and the Department of Natural Resources to inquire if additional
permissions are required. This permit is valid for one year, with the possibility of up to two (2) six-
nionth extensions i` the applicant submits the appropriate permt extension fee and documentation
to the Zoniro Administrator. A copy of the Land Use Permit placard should be submitted to the local
B-ilding Inspector for the town upon application for the building permit. The orange placard must
be posted on the job-site and visible from public view.
Please feel free to contact me with any questions or concerns; I am typically available Monday-
=riday from 8:00 a.m. - 5:00 p.m.
Respectfully,
;l l
y j"O /114, jox)~
Sarah'Droher
I and Use Technician 11
C: File
er: iskroll2ragmail coml Property Owner
bellstrku smemc(Wcomc ist.net, Contractor/Agent
turyn~ lgrk : lownofsomcrset wi. cnm• Town of Somerset
P.ir Lard -In{;rdscow.got, Land Use Technician
enclosure: Site. Plan and Erosion Central Notes
phone 715.380'.4680 Government Center, 1101 Carmichael Road, Hudson, WI 54016 Fox 715.386.4686
vpe• / " nvi vs/-dd '+vwLvfacebook_rw 'S_[rowcuuntym Cd.-JV( -Jail). C rC aX' a _uc
• • / Lt~'ratilb-•%'J~
Standard Erosion Control Man
for 1- & 2-Family Dwelling Construction Sites
According to Chapters Comm 20 & 21 o` the V%isconsin Uniform D,.velling Code, soil erosion
control information needs to be included on the plot plan which is submitted and approved prior
to the issuance of building permits for 1- & 2-family dwelling units in those Jurisdictions where
the soil erosion control provisions of the Uniform Dwelling Code are enforcee. This Standard
Erosion Control Plan is provided to assist in meeting this requirement.
Instructions:
1. (-:)-nplctc .his plan by filling in requested information, completing the site diagram and marking
aporopriate boxes on the inside of this form.
i. :n completing the site diacram, give consideration to potential erosion that may occur before, during, and
after grading. Water runoff patterns :.an change significantly as a site is reshaped.
me of building permit application.
3. Submit this plan at tqe ti
PROTECT LOCAIIUV _-7 / _L1 Please indicate nor'n
's ~1LV4'V I'L ,4~ZG e" cy eomp:eliny trio errcm,
BUILDER t- e o44 „E 1 O,JNER - "
WORKSHEET COMPLETED BY WL rlft<'•/ 15 DAf: r -7
4.r_ -
-N-
SITE DIAGRAM Scale: Vinch = _^^feet
` i +
W EROSION
CONTROL PLAN
-J~ f LEGEND
.i %r. _ -PROPERTY
LINE
ER'STRNG
TD IEMPORAH"
I _.r _~.I - DIVERSION
N i'
SL.-
T- ENC.r
i - STRX'N
-
GRA'': LL
f
`J=GEIATICN
SPECI-ICATION
TREE
PRESER\•YSION
STOCKPILED
• V
.3
Q
Cl) cn
C'
LU
a
N L ~ N
F- a) .W O L p
m o t0 N U tC
O d d y..
FL U m z
N N O O
V N N
c
O
C!.
O N E u 'a
U O F- >
1o U a ~
~ ~ z
cn Q ® v
E
0 3 n.
L)
(n J o CL
FO- ® Q
ST. CRO[~ UNT PERMIT + File#:
~I L~ND USE
6~2 APPLICATION Office Use Only
y" Revised May 2016
i
vJn . , L IZ~ t "yes _:OV~~.
Property Owner: L ,S
I~Cl~ C 4A4 d ,S/~i#/'4C kky(,LContractor/Agent:
Mailing Address: 7( [ 3 l Z 14 5/ Mailing Address: ? 7 ? 5~
Daytime Phone: (7~) Z~ 7 - .5 s--7 7 Daytime Phone: (6 57/)
Cell: ( ( ) 7,~r' Cell: ( )
E-mail: PV l K12c L L. 60'r l E-mail: rz, (L, (`vry e,*5~ A)
Site Address: 7 -j fL i f,
Property Location: 1/4, 1/4, Sec. '-l 'T. N., R. _11_W., Town of Lase 74
Computer Parcel 0 3 2- 5 U 00
Zoning District (Check one): ❑ AG. ❑ AG. II ❑ RURAL RES. ❑ RESIDENTIAL ❑ COMMERCIAL ❑ INDUSTRIAL
Overlay District (Check all that apply): W SHORELAND ❑ RIVERWAY ❑ FLOODPLAIN ❑ ADULT ENTERTAINMENT
Type of Land Use Permit Request (Check one): Please refer to the current fee schedule on our website.
❑ Lower St. Croix Riverway District ❑ Wireless Communication Tower (Co-location)
0 Shoreland ❑ Temporary Occupancy
❑ Signage ❑ Nonmetallic Mining Operation
❑ Floodplain ❑ Animal Waste Storage Facility
❑ Grading & Filling, 12-24.9% Slopes ❑ Livestock Facility
❑ Other:
❑ Permit processed in conjunction with a Land Division, Special Exception or Variance
State the nature of your request: CK
qJ~~l~•.'~_~ ~ (kI~CM ~rie ~(_L~t I'Yl ~~"iQ-,~/.~l j~~i~L~L. ~c> ll i(-i ~l ~-,~'i J~~+~ f~'~-ts~ rJ tCL~. L. r'
Zoning Ordinance RefereKce
I attest that the information contained in thhis application is true and correct to the best of my knowledge.
Property Owner Signature: Date r~
Contractor/Agent Signature: Date
Complete Application Accepted: By:
Fee Received: )L'
Recaap
W-N
715-386-4680 St. Croix County Government Cent( 715-381-4400 Fax
cdoL(c, s_ 1 cro X_W .us 1101 Carmichael Road, Hudson, wl 54 6J 1 N H2P6ARZMT "W'W Cwi sZcdd
t
C E ERA"
APPLICATION: f E
Applications will not be accepted until the applicant has: t
• Met with the Zoning Administrator to review the application;
• Submitted Original plus 2 copies of the entire packet including all supporting information, maps & diagrams;
• Resolved any land use violations and paid any outstanding fees owed to the Community Development Department;
• Signed the application form (the signatures of the property owners and agents acting on their behalf are required); and
• Submitted the appropriate application fee (nonrefundable) payable to: St. Croix County.
REVIEW:
The Zoning Administrator will review the application for completeness and assign a file number to the application. The Zoning
Administrator may require additional information and will notify the applicant of this within 10 days. Upon receiving a complete
application and supporting documents, the Zoning Administrator will:
• send copies of the applications to the appropriate reviewing agencies for comment. Applicants are encouraged to contact
their town to discuss their application and inquire about necessary building permits and approvals at the town level;
• schedule a site visit to the applicant's property, at which time the applicant shall flag all applicable property/project corners
and label the flags accordingly; and
• review the file and prepare findings for approval or denial of the permit within 60 days. Upon approval, the permit will be
mailed to the applicant or to the applicant's agent.
If approved, the land use permit will be valid for one year from the date of the permit issuance. The applicant may also be required
to apply through the Town for a local building permit. All site plans, pictures, and other materials submitted with the application
become the property of the Community Development Department and will remain in the file.
❑ Completed and signed application form with fee.
❑ Original plus 2 copies needed of the entire packet including ALL supporting information, maps & diagrams.
❑ A general written statement that specifically explains the request.
❑ A statement indicating whether or not a private water or sanitary system is to be installed.
❑ Recorded Warranty Deed (may be obtained at the Register of Deed's office).
❑ A complete site plan showing:
i project location in the town;
lot/parcel dimensions with total lot area, property lines, and all applicable setbacks;
location of existing access roads, right-of-way, road setbacks, and recorded easements;
• location of all existing and proposed structures with their square footage and distance from setbacks;
6 location of existing and proposed POWTS, wells, driveways, parking areas, access, signs, and other features;
• location of slopes 12% and greater (minimum contours to be determined by the Zoning Administrator);
• all blufflines and slope preservation zones (Riverway) and setbacks from blufflines;
• location of the OHWM of any abutting navigable waterways and all setbacks from the OHWM;
• location and landward limit of all wetlands, specifications and dimensions for areas of proposed wetland alteration;
• existing and proposed topographic and drainage features and vegetative cover;
• location of floodplain and floodway limits on the property; and
• any other unique limiting conditions of the property or information deemed necessary by the Zoning Administrator.
For projects that involve land disturbance requests, the following additional information may be required:
❑ Detailed drawings (scale should not be greater than 1 inch to 200 feet).
❑ Grading plan showing grading limits and pre and post contours.
❑ Project schedule and contractor list.
❑ Erosion control plan (Best Management Practices).
❑ Storm water management plan stamped by an engineer and including all runoff calculations.
❑ Vegetation plan including schedule, seeding rates, and species size, type and location.
❑ Other documents:
NOTE: All maps, plans, and engineering data shall be no larger than 11x17. No covers, binders, or
envelopes. Staple or paperclip your application in the upper left-hand corner.
w:\cdd\zonshare\administrative\application forms\zoning applications\land use permit application.docx Page 2
irk+' ,xc~,~-Ct~S
w
m
EROSION CONTROL PLAN CHECKLIST
H _J Check appropriate boxes below, and complete the site diagram `s
-a c
Q with necessary information.
U z Site Characteristics
q North arrow, scale, and site boundary. Indicate and name adjacent streets or roadways.
71 ❑ Location of existing drainageways, streams, rivers, lakes, wetlands or wells.
❑ ✓ Location of storm sewer inlets.
Location of existing and proposed buildings and paved areas.
The disturbed area on the lot.
jFJ Approximate gradient and direction of slopes before grading operations.
Approximate gradient and direction of slopes after grading operations.
J ❑ Overland runoff (sheet flow) coming onto the site from adjacent areas.
Erosion Control Practices
❑ ❑ Location of temporary soil storage piles.
Note: Soil storage piles should be placed behind a sediment fence, a 10 foot wide
vegetative strip, or should be covered with a tarp or more than 25 feet from
any downslope road or drainageway.
Location of access drive(s).
Note: Access drive should have 2 to 3 inch aggregate stone laid at least 7 feet wide
and 6 inches thick. Drives should extend from the roadway 50 feet or to the
house foundation (whichever is less).
d ❑ Location of sediment controls (filter fabric fence, straw bale fence or 10-foot-wide
vegetative strip) that will prevent eroded soil from leaving the site.
77 77 Location of sediment barriers around on-site storm sewer inlets.
❑ ~,U Location of diversions.
Note: Although not specifically required by code, it is recommended that concen-
trated flow (drainageways) be diverted (re-directed) around disturbed areas.
Overland runoff (sheet flow)from adjacent areas greater than 10,000 sq. ft.
should also be diverted around disturbed areas.
❑ Location of practices that will be applied to control erosion on steep slopes (greater than
12% grade).
Note: Such practices include maintaining existing vegetation, placement of additional
sediment fences, diversions, and re-vegetation by sodding or seeding with use
of erosion control mats.
❑ Q Location of practices that will control erosion on areas of concentrated runoff flow.
Note: Unstabilized drainageways, ditches, diversions, and inlets should be protected
from erosion through use of such practices as in-channel fabric or straw bale
barriers, erosion control mats, staked sod, and rock rip-rap. When used, a
given in-channel barrier should not receive drainage from more than two acres
of unpaved area, or one acre of paved area. In-channel practices should not be
installed in perennial streams (streams with year round flow).
❑ [{j Location of other planned practices not already noted.
4-jo It 00
LU
J
Ca
U
a Indicate management strategy by checking (vO the appropriate box.
c Q
U z Management Strategies
❑ ❑ Temporary stabilization of disturbed areas.
Note: It is recommended that disturbed areas and soil piles left inactive for extended
periods of time be stabilized by seeding (between April 1 and September 15), or
by other cover, such as tarping or mulching.
❑ Permanent stabilization of site by re-vegetation or other means as soon as possible
(lawn establishment).
• Indicate re-vegetation method: Seed ❑ Sod n Other
• Expected date of permanent re-vegetation: 7~~/F,__.._
• Re-vegetation responsibility of: 71 Builder ?~Owner/BuYer
• Is temporary seeding or mulching planned if site is not seeded by
Sept. 15 or sodded by Nov. 15? Yes ❑ No
❑ Use of downspout and/or sump pump outlet extensions.
Note: It is recommended that flow from downspouts and sump pump outlets be routed
through plastic drainage pipe to stable areas such as established sod or pavement.
❑ l~ Trapping sediment during de-watering operations.
Note: Sediment-laden discharge water from pumping operations should be ponded
behind a sediment barrier until most of the sediment settles out.
❑ Proper disposal of building material waste so that pollutants and debris are not carried
off-site by wind or water.
❑ Maintenance of erosion control practices.
• Sediment will be removed from behind sediment fences and barriers
before it reaches a depth that is equal to half the height o f the barrier.
I `
• Breaks and gaps in sediment fences and barriers will be repaired imme-
diately. Decomposing straw bales will be replaced (typical bale life is
three months).
• All sediment that moves off-site due to construction activity will be
cleaned up before the end of the same workday.
• All sediment that moves off-site due to storm events will be cleaned up
before the end of the next workday.
• Access drives will be maintained throughout construction.
• All installed erosion control practices will be maintained until the
disturbed areas they protect are stabilized.
Standard Erosion Control Plan
for 1- & 2-Family Dwelling Construction Sites
According to Chapters Comm 20 & 21 of the Wisconsin Uniform Dwelling Code, soil erosion
control information needs to be included on the plot plan which is submitted and approved prior
to the issuance of building permits for 1- & 2-family dwelling units in those jurisdictions where
the soil erosion control provisions of the Uniform Dwelling Code are enforced. This Standard
Erosion Control Plan is provided to assist in meeting this requirement.
Instructions:
1. Complete this plan by filling in requested information, completing the site diagram and marking
appropriate boxes on the inside of this form.
2. In completing the site diagram, give consideration to potential erosion that may occur before, during, and
after grading. Water runoff patterns can change significantly as a site is reshaped.
3. Submit this plan at the time of building permit application.
PROJECT LOCATION 73 3 ~ -7 Z &,--e
- - Please indicate north
BUILDER (---P0q0XF4 On-- OWNER m- ' Al" i.--- by completing the arrow.
WORKSHEET COMPLETED BYG DATE
.N.
SITE DIAGRAM Scale: Minch = r ° feet
- - - - - -
I --r
_
- - - EROSION
-4- - I + CO AN
NTROL PL
LEGEND
PROPERTY
LINE
- - - -
EXISTING
DRAINAGE
- r - - - TD TEMPORARY
rT 1 DIVERSION
51 _I } . i FINISHED
` DRAINAGE
--j ! } LIMITS OF
-f ~ I f } GRADING
F
ITS -
- - SILT
- - ~--T--- ~ e FENCE
EL - - _ _ STRAW
--I- - - - i- BALES
7 [7
GRAVEL
1 f O VEGETATION
- i - SPECIFICATION
f
TREE
- ! _ PRESERVATION
STOCK
i j PILED
SOIL
Lo-j4i$-00s
FORM NO. 985-A ®R' C
Stock No. 26273
0 C;
CERTIFIED SURVEY MAP S~•~C~ --f - Lid,
LOCATED IN THE NE1 /4 OF THE SW1 /4 AND THE NW1 /4 OF THE SE1 /4 OF SECTION 24, T31N,
R19W, TOWN OF SOMERSET, ST. CROIX COUNTY, WISCONSIN
CURVE DATA - CURVE 1 - 2
n = 18'23'28"
rj~JAV R J 6 7.00' L 53.60' it E0 n C B S 38°51' 1 2"E 28 198q o x
C = 53.37' >s~ twQea p• CoN
Ist TAN = S29°39'23"E t _ N'tt .x ~nr
2nd TAN _ S 48002' 56"E so mt. ~yy m o z
~b'iwio.y ` ~7 02 cn m
Z 0
O
T
\iQ m N
I'S 1022'32"W
Q Et~~ PO 1 . 1 8' 6 6. 0 1' 358. 94'
ti0 496. 1 3'
0'3~ O~ S29039'28"E
519`1 1 7.48'
a,
'COIN ~ ~ O I c
nz
y-t `Nti z --4 z o
C z -n z O
4 Q,~' Vie` . c~ r
> r
R==80' opt Qnc .~C" o u°, ~-i cn
M
.,__._r cc cn I m r t~T'1 Z
m C7
fD
c 1 1+ i m m
Z r + Z
y
Ir w w Iy
is o
N -
i o ,
dddMNM~
C, m
o ASSUMED BEARING
\ Q m i\
r N 1022'32"E
1> W 79. 131
I c Drafted by Walter J. Gregory.
(~i IZ + MEANDER LINE/
O N 5602.7' 40"W
to 1 83. 42'
rt ~ o
0
EAST LINE
~3 - OF SW1 /4
11• J _
2,~o Ou a~-1 r
nm ~D APPROVED
m r'
a, rn
m
r •„e
m
Vol=e 5 Page 1.394 CAMP tE XO N PCO FLG.'.:....
• ~1~~--t~0~o EGGS
FORM NO. 98S-ARI V'IiS\ax
Stock No. 28273
t,; ~ i a..a 4 Z.l
CERTIFIED SURVEY MAP
LOCATED IN THE NE1!4 OF THE SW1 /4 AND THE NW1 /4 OF THE SE1 /4 OF SECTION 24, T31N,
R19W, TOWN OF SOMERSET, ST. CROIX COUNTY, WISCONSIN
CURVE DATA - CURVE 1 - 2
18'23'28" ~l _i8-L 1 y/
n = 0 ~
R 167.00' O
w m Z
L = 53.60' FrL ED z x
CB 538°51'12"E JAY n
C 53.37' b7 AAAU3 0- 1y$q z =
Ist TAN - S29°39'7-3"E
2nd TAN S48°02'56y, c ° m m om
C
C~ O T
P y rm
P~ S1°22'32"W
RO 1.18' 66.01' 358.94'
L~ 4 96.1 3'
S29°39'28E
c~2c~ XNN 17.48'
} n z
-l z -a I Z g
z o G
r
0
~co O~ au 13y
R=80' Al
kr,
'J> F4
m m m
o a a i n m n z
o n 0 I o . -I --1
.1. _ V) vii r Z ~
* Y- ` -0 i.}. m I r' co Z
pli -n
'c °r~ ly m n
Z 1 i+
'ro w a r ,
v
Ir w w !N
a t.
I V)
I _a
00
i 0
Im
i o ASSU VIED BEARING
I~
m N1°22'32"E
i 79.13'
Drafted by Walter J. Gregory.
IZ _ /
+ MEANDER LINE/
I o N 56°27' 40"1N °
I cn 1 83. 42'
w /
V__,- °o
EAST LINT
- / OF S W 7/ 4
w 13~.i uOO~ A --i
-i APPROVED
ROVED
r-
cn m m
rn
m
CC) i
m
Vo.1.'..:Te j ux'. E; 1391S AND EQNfNG COMMiTili
Design 308952356156 TZ -.1F Post Frame Building Estimate
Store: HUDSON - Date: Nov 14, 2017 11:19:00 PM
Elevation Views
Ie'
Rpm
l